  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  898   Tuesday, September 07, 2021, 16:04 Alexander Shkuratoff      DoneReplaced flange on F/T R with blank flangeFeedthrough R had a flange installed with
a HV feedthrough on it for TM3 service tray
prototype HV tests. It was replaced today
  
  189   Friday, August 31, 2012, 10:19 Anders Mjos      Problems/SolutionsReplaced TMSRP2 (again)

    

       
            
  
  179   Thursday, August 23, 2012, 10:40 Anders Mjos      Problems/SolutionsReplaced TMSRP2Thursday, August 23, 2012, 10:40: Replacing
TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49:
  
  754   Tuesday, August 13, 2019, 12:03 Aaron Schmidt      Problems/SolutionsReplace RP1Tuesday, August 13, 2019, 11:55: Close
PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02:
 vac.PNGcurr.PNG 
  759   Thursday, September 26, 2019, 11:30 Aaron Schmidt      Problems/SolutionsReplace CANBUS board TSG:CB1Thursday, September 26, 2019, 11:28: The
control board to TSG:CB1 was removed and
replaced.  
  
  729   Monday, June 10, 2019, 14:34 Aaron Schmidt      DoneRemoved TM4 Source TrayMonday, June 10, 2019, 09:30: TM4 Source
Tray removed - To HC area.
  
  477   Monday, November 02, 2015, 12:47 Anders Mjos      Problems/SolutionsRemoved Swagelok T from rioght TGHT water linesMico replaced the T's with copper tube
and leak checked.
Monday, November 02, 2015, 12:46:
  
  954   Tuesday, January 03, 2023, 10:03 Carla Babcock       Recovery from power outageEasy recovery after power outage, just
had to power cycle the ground PLC IOC and
the BiRa IOC.
  
  443   Thursday, May 21, 2015, 16:40 Anders Mjos      Problems/SolutionsReconfigured service cap coil connections The service cap has been reconfigured
(colling and electric) to be compatible with
the TM2 Source tray. Coil- is E & F ,
 TestStandSourceTray.jpgTM2SourceTray.jpg 
  663   Thursday, May 24, 2018, 15:28 Anders Mjos      Problems/SolutionsReconfigured FEBIAD coil for testing new source trayThursday, May 24, 2018: Configured coil
to be (-) E&F, (+) G&H. Water should
be supplied to both terminals in either configuration.
  
  108   Thursday, June 28, 2012, 11:04 Pierre BricaultTest FEBIADLP-FEBIAD    In progressReady to bias the high voltage.    
  745   Monday, July 15, 2019, 15:59 Fernando MaldonadoP2N     DoneRe-wiring on service cap.Monday, July 15, 2019, 15:54 : TBHT high
current cables moved to Coil feedthroughs.
Coil high current cables moved to
  
  656   Thursday, April 19, 2018, 12:55 Fernando Maldonado      DoneRe-wiring Anode PSThursday, April 19, 2018, 12:52: Pin J1
was reconnected into the anode power supply.
All jumpers were put back to remote control.
 20180420_104954.jpg 
  444   Thursday, May 21, 2015, 17:26 Anders Mjos LP-FEBIAD TM2  In progressRe-testing new TM2 Source Tray Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos
started
 TM2_Source_Tray_Test_FEBIAD_Target_Test_3.docx2015-05-22_Flow.xlsx 
  441   Wednesday, May 13, 2015, 13:27 Anders Mjos LP-FEBIAD TM2 39230-1In progressRe-testing new TM2 Source TrayNOTE:
COIL PS is a 100 A supply, thus actual COIL
current is 0.5x COIL set point.
  
  447   Wednesday, May 27, 2015, 14:19 Anders Mjos LP-FEBIAD TM2  In progressRe-testing new TM2 Source TrayWednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos
started
 TM2_Source_Tray_Test_FEBIAD_Target_Test_4.docxTM2_Source_Tray_in_Test_Stand_-_Test_Results.pdf 
  480   Tuesday, November 17, 2015, 11:27 Anders Mjos      Problems/SolutionsRan RP2 with gas ballast for 15 minTo recover performance  2015-11-17_RP2_performance.png 
  633   Tuesday, February 13, 2018, 12:17 Carla Babcock       Ramping up bias to 60kV with conditioning station supplyRamped up to 60kV with the new power supply,
same as what we did last time with the standard
test stand bias supply (see entry #627 ).
 vacuumbias_13022018.PNG 
  634   Tuesday, February 13, 2018, 16:47 Carla Babcock       Ramping to 63kV - some sparksSparks at 62kV on the bias.
Turned it down, turned it back up
and got a spark at 60kV.
  
  911   Wednesday, January 12, 2022, 16:12 Carla Babcock       Ramp up of the mass marker targetWednesday, January 12, 2022, 16:08 : HV
ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A
 133CssettingsJan132022.PNG23NasettingsJan132022.PNG23NasettingsJan172022-source.PNG23NasettingsJan172022-beamline.PNG 