ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
898
|
Tuesday, September 07, 2021, 16:04 |
Alexander Shkuratoff | | | | | | | Done | Replaced flange on F/T R with blank flange | Feedthrough R had a flange installed with
a HV feedthrough on it for TM3 service tray
prototype HV tests. It was replaced today |
|
|
189
|
Friday, August 31, 2012, 10:19 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced TMSRP2 (again) |
|
|
|
179
|
Thursday, August 23, 2012, 10:40 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced TMSRP2 | Thursday, August 23, 2012, 10:40: Replacing
TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: |
|
|
754
|
Tuesday, August 13, 2019, 12:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace RP1 | Tuesday, August 13, 2019, 11:55: Close
PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02: |
|
|
759
|
Thursday, September 26, 2019, 11:30 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace CANBUS board TSG:CB1 | Thursday, September 26, 2019, 11:28: The
control board to TSG:CB1 was removed and
replaced. |
|
|
729
|
Monday, June 10, 2019, 14:34 |
Aaron Schmidt | | | | | | | Done | Removed TM4 Source Tray | Monday, June 10, 2019, 09:30: TM4 Source
Tray removed - To HC area. |
|
|
477
|
Monday, November 02, 2015, 12:47 |
Anders Mjos | | | | | | | Problems/Solutions | Removed Swagelok T from rioght TGHT water lines | Mico replaced the T's with copper tube
and leak checked.
Monday, November 02, 2015, 12:46: |
|
|
954
|
Tuesday, January 03, 2023, 10:03 |
Carla Babcock | | | | | | | | Recovery from power outage | Easy recovery after power outage, just
had to power cycle the ground PLC IOC and
the BiRa IOC. |
|
|
443
|
Thursday, May 21, 2015, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured service cap coil connections | The service cap has been reconfigured
(colling and electric) to be compatible with
the TM2 Source tray. Coil- is E & F , |
|
|
663
|
Thursday, May 24, 2018, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured FEBIAD coil for testing new source tray | Thursday, May 24, 2018: Configured coil
to be (-) E&F, (+) G&H. Water should
be supplied to both terminals in either configuration. |
|
|
108
|
Thursday, June 28, 2012, 11:04 |
Pierre Bricault | Test FEBIAD | LP-FEBIAD | | | | | In progress | Ready to bias the high voltage. | |
|
|
745
|
Monday, July 15, 2019, 15:59 |
Fernando Maldonado | P2N | | | | | | Done | Re-wiring on service cap. | Monday, July 15, 2019, 15:54 : TBHT high
current cables moved to Coil feedthroughs.
Coil high current cables moved to |
|
|
656
|
Thursday, April 19, 2018, 12:55 |
Fernando Maldonado | | | | | | | Done | Re-wiring Anode PS | Thursday, April 19, 2018, 12:52: Pin J1
was reconnected into the anode power supply.
All jumpers were put back to remote control. |
|
|
444
|
Thursday, May 21, 2015, 17:26 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | In progress | Re-testing new TM2 Source Tray | Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos
started |
|
|
441
|
Wednesday, May 13, 2015, 13:27 |
Anders Mjos | | LP-FEBIAD | | TM2 | | 39230-1 | In progress | Re-testing new TM2 Source Tray | NOTE:
COIL PS is a 100 A supply, thus actual COIL
current is 0.5x COIL set point. |
|
|
447
|
Wednesday, May 27, 2015, 14:19 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | In progress | Re-testing new TM2 Source Tray | Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos
started |
|
|
480
|
Tuesday, November 17, 2015, 11:27 |
Anders Mjos | | | | | | | Problems/Solutions | Ran RP2 with gas ballast for 15 min | To recover performance |
|
|
633
|
Tuesday, February 13, 2018, 12:17 |
Carla Babcock | | | | | | | | Ramping up bias to 60kV with conditioning station supply | Ramped up to 60kV with the new power supply,
same as what we did last time with the standard
test stand bias supply (see entry #627 ). |
|
|
634
|
Tuesday, February 13, 2018, 16:47 |
Carla Babcock | | | | | | | | Ramping to 63kV - some sparks | Sparks at 62kV on the bias.
Turned it down, turned it back up
and got a spark at 60kV. |
|
|
911
|
Wednesday, January 12, 2022, 16:12 |
Carla Babcock | | | | | | | | Ramp up of the mass marker target | Wednesday, January 12, 2022, 16:08 : HV
ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A |
|