Entry  Tuesday, September 07, 2021, 16:04, Alexander Shkuratoff, , , , , , , Done, Replaced flange on F/T R with blank flange 
Feedthrough R had a flange installed with a HV feedthrough on it for TM3 service tray prototype HV tests. It was replaced today with the original blank
flange.
    Reply  Friday, August 31, 2012, 10:19, Anders Mjos, , , , , , , Problems/Solutions, Replaced TMSRP2 (again) 


    
        
            Anders Mjos wrote:
        
        
            
            Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Entry  Thursday, August 23, 2012, 10:40, Anders Mjos, , , , , , , Problems/Solutions, Replaced TMSRP2 
Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started.
Entry  Tuesday, August 13, 2019, 12:03, Aaron Schmidt, , , , , , , Problems/Solutions, Replace RP1 vac.PNGcurr.PNG
Tuesday, August 13, 2019, 11:55: Close PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02: RP1 replaced.
Tuesday, August 13, 2019, 13:24: TS exhaust / screen cleaned out.
Entry  Thursday, September 26, 2019, 11:30, Aaron Schmidt, , , , , , , Problems/Solutions, Replace CANBUS board TSG:CB1 
Thursday, September 26, 2019, 11:28: The control board to TSG:CB1 was removed and replaced.  
Thursday, September 26, 2019, 11:30: All optics & steering operational. Board replacement successful.
Entry  Monday, June 10, 2019, 14:34, Aaron Schmidt, , , , , , , Done, Removed TM4 Source Tray 
Monday, June 10, 2019, 09:30: TM4 Source Tray removed - To HC area.
Entry  Monday, November 02, 2015, 12:47, Anders Mjos, , , , , , , Problems/Solutions, Removed Swagelok T from rioght TGHT water lines 
Mico replaced the T's with copper tube and leak checked.
Monday, November 02, 2015, 12:46: Roughing
Monday, November 02, 2015, 13:19: Starting turbos
Entry  Tuesday, January 03, 2023, 10:03, Carla Babcock, , , , , , , , Recovery from power outage 
Easy recovery after power outage, just had to power cycle the ground PLC IOC and the BiRa IOC.
Test stand vacuum currently pumping down again. Water and HV elements still off.
Tuesday, January 03, 2023, 11:13: Reset IG6 - Filament 2. Vacuum 7.22e-06T - AS
Entry  Thursday, May 21, 2015, 16:40, Anders Mjos, , , , , , , Problems/Solutions, Reconfigured service cap coil connections TestStandSourceTray.jpgTM2SourceTray.jpg
 The service cap has been reconfigured (colling and electric) to be compatible with the TM2 Source tray. Coil- is E & F , Coil+ is G & H.
Entry  Thursday, May 24, 2018, 15:28, Anders Mjos, , , , , , , Problems/Solutions, Reconfigured FEBIAD coil for testing new source tray 
Thursday, May 24, 2018: Configured coil to be (-) E&F, (+) G&H. Water should be supplied to both terminals in either configuration.
Entry  Thursday, June 28, 2012, 11:04, Pierre Bricault, Test FEBIAD, LP-FEBIAD, , , , , In progress, Ready to bias the high voltage. 
 
Entry  Monday, July 15, 2019, 15:59, Fernando Maldonado, P2N, , , , , , Done, Re-wiring on service cap. 
Monday, July 15, 2019, 15:54 : TBHT high current cables moved to Coil feedthroughs.
Coil high current cables moved to TBHT feedthroughs.
Resistor across  Coil feedthroughs E and F are now moved between TBHT feedthroughs A and B.
Entry  Thursday, April 19, 2018, 12:55, Fernando Maldonado, , , , , , , Done, Re-wiring Anode PS 20180420_104954.jpg
Thursday, April 19, 2018, 12:52: Pin J1 was reconnected into the anode power supply. All jumpers were put back to remote control.
NOTE: the cable EXTLKT is still not connected. I will ask Carla about this one.
Thursday, April 19, 2018, 18:00: Cable EXTLKT connected.
Entry  Thursday, May 21, 2015, 17:26, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray  TM2_Source_Tray_Test_FEBIAD_Target_Test_3.docx2015-05-22_Flow.xlsx
Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos started
Thursday, May 21, 2015, 18:12: Turbos at speed. Vacuum at 4.7E-5 T
Entry  Wednesday, May 13, 2015, 13:27, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Re-testing new TM2 Source Tray 
NOTE: COIL PS is a 100 A supply, thus actual COIL current is 0.5x COIL set point.
Changed the FEBIAD connector blocks to have copper tubes exit below the block. Extended ANODE wire to allow it to be wrapped around Cu-tubes and
keep it further away from the GE lines.
Entry  Wednesday, May 27, 2015, 14:19, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray TM2_Source_Tray_Test_FEBIAD_Target_Test_4.docxTM2_Source_Tray_in_Test_Stand_-_Test_Results.pdf
Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos started
Wednesday, May 27, 2015, 15:00: Turbos at speed. Vacuum at 1.6e-5 T
Entry  Tuesday, November 17, 2015, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Ran RP2 with gas ballast for 15 min 2015-11-17_RP2_performance.png
To recover performance
Entry  Tuesday, February 13, 2018, 12:17, Carla Babcock, , , , , , , , Ramping up bias to 60kV with conditioning station supply vacuumbias_13022018.PNG
Ramped up to 60kV with the new power supply, same as what we did last time with the standard test stand bias supply (see entry #627 ). Much more instability
on the bias current readout (see attached screen shot), develops around 54kV. As well, the old supply read out 37uA at 60kV while the new supply reads
out ~85uA. This could just be an EPICS read back issue though.
Entry  Tuesday, February 13, 2018, 16:47, Carla Babcock, , , , , , , , Ramping to 63kV - some sparks 
Sparks at 62kV on the bias.
Turned it down, turned it back up and got a spark at 60kV.
Now up to 63kV, no sparks so far (5 mins). Left EE @ -3100V and EZL @ 28.5kV
Entry  Wednesday, January 12, 2022, 16:12, Carla Babcock, , , , , , , , Ramp up of the mass marker target 133CssettingsJan132022.PNG23NasettingsJan132022.PNG23NasettingsJan172022-source.PNG23NasettingsJan172022-beamline.PNG
Wednesday, January 12, 2022, 16:08 : HV ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A on TBHT. See MassMarkerTest#1
for ramp up values of the thermocouples.