Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 14 of 53  Not logged in ELOG logo
ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  1002   Tuesday, April 09, 2024, 16:01 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online useTuesday, April 09, 2024, 15:25: Roughing.

Wednesday, April 10, 2024,
05:41: TP1B on. 
 EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx 
  1004   Wednesday, April 17, 2024, 14:16 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online use - Run 2https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08:
 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx 
  264   Wednesday, January 09, 2013, 14:13 Anders MjosEmpty      RougingWednesday, January 09, 2013, 14:12: Roughing
empty chamber
  
  265   Friday, January 11, 2013, 08:37 Anders MjosEmpty     In progressVentingFriday, January 11, 2013, 08:36: Venting
for installation of RFQ test target later
today
  
  277   Monday, January 28, 2013, 12:56 Anders MjosEmpty      Venting For conductor bolt work
Monday, January 28, 2013, 12:56:
Turbos off
  
  278   Monday, January 28, 2013, 14:41 Anders MjosEmpty      Pumping downMonday, January 28, 2013, 14:41: Roughing
Monday, January 28, 2013, 15:35:
Starting turbos
  
  289   Thursday, March 28, 2013, 13:55 Anders MjosEmpty     In progressPumping down empty chamberThursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36:
Starting turbos (vacuum at ~0.100 T)
  
  296   Thursday, April 25, 2013, 13:32 Anders MjosEmptyLP-FEBIAD  Tube Only38307-9 In progressFEBIAD Coil testSame target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54:
Roughing
 2014-04-30_FEBIAD_COIL_AWG18.PNG2014-05-01_FEBIAD_COIL_AWG18.PNGTarget_Assembly.pdf 
  425   Tuesday, February 03, 2015, 14:33 Anders MjosEmptyLP-SIS    In progressTarget with new center block and new EE insulatorAlso with newly installed RGA
Tuesday, February 03, 2015, 14:33:
Roughing
 2015-02-04-1530trace.pngLP-SIS-newCenterBlock_Feb_05_2015.zip 
  301   Tuesday, May 21, 2013, 14:58 Rick MaharajCTL Febiad      CTL Febiad InstalledCeramic coated coil development target
removed. CTL Febiad target installed.
Roughing chamber.
  
  302   Tuesday, May 21, 2013, 15:14 Rick MaharajCTL Febiad      Turbos StartedTurbos started   
  303   Tuesday, May 21, 2013, 15:50 Rick MaharajCTL Febiad      Cooling Water Turned OnCooling water turned on when vacuum reading
5.54e-06 T. Vacuum steadily increasing. Ion
gauge reading steadily decreasing now reading
  
  308   Wednesday, May 29, 2013, 12:10 Anders MjosCTL FEBIADHP-FEBIAD  38481-5 DoneCTL TestWednesday, May 29, 2013, 12:09: Debiased
to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp
 Photo_2013-06-13_10_33_42_AM.jpg 
  305   Friday, May 24, 2013, 15:13 Aurelia LaxdalCLT FEBIAD      CLT FEBIAD conditioning startedPurged the gas lines, turned on the HV
and started the heaters for CLT FEBIAD: TGHT
up to 580A and TBHT up to 230A.
  
  781   Thursday, January 30, 2020, 15:25 Aaron SchmidtC(#1)LP-SIS  43044-843515-3In progressConditioning C(#1) HSWas for UC# 32* - Schedule change, now
for C#1
Thursday, January 30, 2020, 15:13:
 C#1_-_Short.docx 
  942   Tuesday, October 18, 2022, 13:25 Aaron SchmidtC#5LP-SIS  45235-544691-13In progressConditioning C#5Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28:
BV1A open
 C#5_-_Conditioning_start_-_HV.docx 
  940   Tuesday, September 27, 2022, 07:55 Aaron SchmidtC#4LP-SISITETM444691-344378-23In progressConditioning C#4 w/ thermocouplesThermocouples attached on 5 X 5 multi-pin:
O - O
O - X
 C#4_Conditioning_-_HV_test.docxER-580-230-30kV-m7.txtER-580-230-30kV-m39.txtER-580-230-30kV-m134.txt 
  899   Tuesday, September 14, 2021, 17:12 Aaron SchmidtC#3LP-SISITWTM244691-744378-11In progressC#3 ConditioningTuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37:
TP1B on.
 6x 
  814   Wednesday, September 30, 2020, 06:23 Aaron SchmidtC#2LP-SISITWTM244139-943515-2In progressConditioning C#2Wednesday, September 30, 2020, 06:14: Power
/ sources on.
Wednesday, September 30, 2020, 06:17:
 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx 
  794   Wednesday, June 10, 2020, 08:23 Aaron SchmidtC#1LP-SISITWTM243044-843515-3In progressConditioning C#1Salts: 
Li - 10 uL
Na - 10 uL
 7x 
ELOG V2.9.2-2455