ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
72
|
Monday, April 16, 2012, 11:16 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines | Venting chamber and purging cooling lines
in preparation for target removal |
|
73
|
Monday, April 16, 2012, 11:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines |
|
|
77
|
Friday, April 20, 2012, 08:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | Problems/Solutions | Insulator stand-off failure | When the target was removed from
the test stand it was discovered that the
custom designed insulator stand-off (ITD0400 |
|
978
|
Friday, August 25, 2023, 17:21 |
Aaron Schmidt | Nb#11 | LP-IG-LIS | ITW | TM2 | 45447-9 | 42132-4 | In progress | Conditioning Nb#11 | Replacement for Nb#10
Friday, August 25, 2023, 17:15: Roughing.
Friday, August 25, 2023, 17:57: Vacuum |
|
971
|
Thursday, July 06, 2023, 16:55 |
Aaron Schmidt | Nb#10 | LP-IG-LIS | ITW | TM2 | 45447-7 | 42132-2 | In progress | Conditioning Nb#10 | Thursday, July 06, 2023, 16:13: Roughing.
Thursday, July 06, 2023, 16:41: TP1B
on. |
|
194
|
Thursday, September 06, 2012, 09:23 |
Friedhelm Ames | NB#7 | | | | | | | | start high voltage and heaters |
|
195
|
Friday, September 07, 2012, 12:11 |
Friedhelm Ames | NB#7 | LP-SIS | | | | | In progress | mass scan started | mass scan has been started after optimization
on 23Na |
|
199
|
Tuesday, September 11, 2012, 19:48 |
Friedhelm Ames | NB#7 | HP-SIS | | | | | Done | cool down finished, all source power supplies off. | |
|
68
|
Friday, March 09, 2012, 13:30 |
Friedhelm Ames | NB#6 | | | | | | | heater ramping down | Fc0 23 nA
IG1 9.9e-7 T
start automatic heater ramping down |
|
156
|
Friday, August 10, 2012, 11:29 |
Pierre Bricault | NA | | | | N A | NA | In progress | Test FEBIAD | The helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out |
|
157
|
Friday, August 10, 2012, 12:44 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | FEBIAD test | Rick put the helium bottle back in the
rack.
Waiting for status of the gas lines. |
|
160
|
Friday, August 10, 2012, 15:29 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | | finishing the gas installation and its pump | 1524H Start small pump.
1529H stop the pump.
|
|
162
|
Saturday, August 11, 2012, 13:34 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | Test FEBIAD anode bias 120 V | |
|
49
|
Friday, March 02, 2012, 08:53 |
Anders Mjos | FEBIAD test | | | | | | Problems/Solutions | Tube heater insulator glowing | The insulator for the tube
heater was observed to be glowing with a
blue shine when the target was on high voltage. |
|
50
|
Friday, March 02, 2012, 13:28 |
Anders Mjos | FEBIAD test | | | | | | | Venting test stand | Venting for target exchange |
|
106
|
Tuesday, June 26, 2012, 18:04 |
Anders Mjos | FEBIAD anode end cap test | | | | Tube only | 38307-9 | In progress | FEBIAD anode end cap test - ready | Testing FEBIAD anode end cap as per dwg
ITD0304 REV C
Target with TUBE ONLY. Do not use |
|
126
|
Wednesday, July 04, 2012, 15:37 |
Anders Mjos | FEBIAD anode end cap test | | | | | | In progress | Pumping down | Replaced grid containing ring (target side)
with new ring. No contact between target
and anode measured in lab. |
|
127
|
Thursday, July 05, 2012, 08:41 |
Anders Mjos | FEBIAD anode end cap test | | | | | | In progress | Water opened - reduced flow heat shield |
|
|
5
|
Thursday, September 15, 2011, 13:46 |
Anders Mjos | FEBIAD Test | HP-FEBIAD | | | | | Failed | FEBIAD Broken Tube | See attached file for photos of the broken
tube |
|
24
|
Monday, October 17, 2011, 10:22 |
Anders Mjos | FEBIAD | | | | | | Problems/Solutions | Variable leak valve replaced | Variable leak valve with serial number
F3-592 has been replaced by F3-649 due
to regulating problems described previously |
|