Tuesday, April 09, 2024, 16:01, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use 
|
Tuesday, April 09, 2024, 15:25: Roughing.
Wednesday, April 10, 2024, 05:41: TP1B on.
Wednesday, April 10, 2024, 05:47: TP1A on.
Wednesday, April 10, 2024, 06:01: IG1 on.
Wednesday, April 10, 2024, 12:21: Waterline FS#5 open. Vacuum stable @ 1.23e-06T.
Wednesday, April 10, 2024, 12:25: Power / sources on.
Wednesday, April 10, 2024, 12:32: TGHT / TBHT @ 5/5A tapped up & back down manually. Ok.
Wednesday, April 10, 2024, 12:33: Anode @ 25 V, Coil @ 10 A. Tapped up & down manually. Ok.
Wednesday, April 10, 2024, 12:35: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Tapped up & down manually. Ok.
Wednesday, April 10, 2024, 12:37: Vacuum @ 1.19e-06T. Ok, but will allow to drop further.
Thursday, April 11, 2024, 10:21: Gas lines open.
Thursday, April 11, 2024, 10:34: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, April 11, 2024, 10:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Thursday, April 11, 2024, 10:41: Significant sparking for about 5 seconds. BIAS / EE / EZL @ 43 / -2.0 / 19 kV.
Thursday, April 11, 2024, 10:42: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.
Thursday, April 11, 2024, 10:46: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV. Sparking again. On the spark gap.
Thursday, April 11, 2024, 10:56: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.
Thursday, April 11, 2024, 11:26: 30 minutes @ 50 kV. 2 sparks in that time. The second spark tripped the optics & IG6. They were reset.
Thursday, April 11, 2024, 11:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, April 11, 2024, 11:38: HV tapped to 0 kV.
Thursday, April 11, 2024, 11:39: Vacuum @ 8.27e-07T.
Thursday, April 11, 2024, 13:03: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 8.16e-07T.
Thursday, April 11, 2024, 13:26: Coil @ 80 A. Tapped up manually at 4 A per min approx.
Thursday, April 11, 2024, 13:28: Vacuum @ 1.01e-06T
Thursday, April 11, 2024, 13:57: Vacuum @ 2.96e-06T
Thursday, April 11, 2024, 14:19: Coil @ 0 A.
Thursday, April 11, 2024, 14:21: Anode @ 100 V.
Thursday, April 11, 2024, 14:22: Anode @ 200 V.
Thursday, April 11, 2024, 14:24: Anode @ 500 V.
Thursday, April 11, 2024, 14:28: Anode @ 0 V.
Thursday, April 11, 2024, 14:32: HV to 0 kV.
Friday, April 12, 2024, 06:30: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, April 12, 2024, 13:23: Auto-ramping aborted. TGHT @ 556 A, Vacuum @ 4.94e-06T. Allow 20 min for stabilization.
Friday, April 12, 2024, 13:44: Auto-ramping TGHT to 580 A @ 2 A per min. Vacuum @ 4.57e-06T.
Friday, April 12, 2024, 14:15: Aborted auto-ramp. Vacuum @ 5.20e-06T. Will manually tap up.
Friday, April 12, 2024, 14:32: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 5.31e-06T. The extraction electrode is acting up. Doubling the voltage on what is input. Add 50 V on the slider, 100 V will go to the readback.
Friday, April 12, 2024, 14:49: HV back to 0 kV.
Friday, April 12, 2024, 15:12: EE Troubleshooting. Cage open & multiple tests to adjust the voltage.

Friday, April 12, 2024, 15:19: Auto-cooling @ -2 A per min

|
Wednesday, April 17, 2024, 14:16, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use - Run 2
|
https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T.
Wednesday, April 17, 2024, 14:12: TGHT / TBHT manually tapped up to 5 / 5 A.
Wednesday, April 17, 2024, 14:13: BIAS / EE / EZL @ 2.5 / -1.0 / 1.0 kV. Ok.
Wednesday, April 17, 2024, 14:15: Anode to 100 V. Ok. Coil PS is still.
Wednesday, April 17, 2024, 14:19: Rear cage reopened. Coil PS on. Coil @ 5 A. Ok. Gas on in the morning.
Wednesday, April 17, 2024, 14:21: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min. Coil back to 0 A.
Thursday, April 18, 2024, 05:57: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Thursday, April 18, 2024, 08:26: Gas lines purged & reopened full of Ar.
Thursday, April 18, 2024, 08:39: Optics set with common tune.
Thursday, April 18, 2024, 08:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, April 18, 2024, 08:50: Begin mass & wire scans w/o Anode & Coil
Thursday, April 18, 2024, 08:55: MB1 appears to be tripped & out of sync.
Thursday, April 18, 2024, 08:57: Switched MB1 PS off, controller off. Restart them. PS on, then controller. Reset on epics & Can Diagnostics TMS:HallMB1 (cfg)
Thursday, April 18, 2024, 08:59: MB1 ready. Continue testing / mass scan.
Thursday, April 18, 2024, 09:37: Anode to 100 V. Coil to 20 A.
Thursday, April 18, 2024, 10:15: Set optics to Dave's previous tune.
Thursday, April 18, 2024, 10:49: Primary mass & wire scans set complete.
Thursday, April 18, 2024, 11:01: Anode & Coil to 0. Scanning w/ Dave's previous tune.
Thursday, April 18, 2024, 11:52: BIAS / EE / EZL to 0 kV. Gas lines closed. IV4 closed.
Thursday, April 18, 2024, 11:53: Begin auto-cooling @ 2 A per min.
Friday, April 19, 2024, 06:56: Power off. IG1 off. TP1B & TP1A off.
Friday, April 19, 2024, 09:03: VV1 open - venting |
Wednesday, January 09, 2013, 14:13, Anders Mjos, Empty, , , , , , , Rouging
|
Wednesday, January 09, 2013, 14:12: Roughing empty chamber |
Friday, January 11, 2013, 08:37, Anders Mjos, Empty, , , , , , In progress, Venting
|
Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today |
Monday, January 28, 2013, 12:56, Anders Mjos, Empty, , , , , , , Venting
|
For conductor bolt work
Monday, January 28, 2013, 12:56: Turbos off
Monday, January 28, 2013, 14:18: Venting |
Monday, January 28, 2013, 14:41, Anders Mjos, Empty, , , , , , , Pumping down
|
Monday, January 28, 2013, 14:41: Roughing
Monday, January 28, 2013, 15:35: Starting turbos
Monday, January 28, 2013, 15:43: Turbos at speed
Monday, January 28, 2013, 15:45: Vacuum at 3.9 E-6 T |
Thursday, March 28, 2013, 13:55, Anders Mjos, Empty, , , , , , In progress, Pumping down empty chamber
|
Thursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)
Thursday, March 28, 2013, 14:44: Both turbos at speed
Thursday, March 28, 2013, 14:46: Vacuum at 5.2E-6 Torr |
Thursday, April 25, 2013, 13:32, Anders Mjos, Empty, LP-FEBIAD, , , Tube Only, 38307-9 , In progress, FEBIAD Coil test  
|
Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54: Roughing
Thursday, April 25, 2013, 14:25: Started turbos
Thursday, April 25, 2013, 14:33: Turbos at speed
Thursday, April 25, 2013, 14:33: Vacuum at 8.8E-6 T
Friday, April 26, 2013, 08:25: Cooling water supply opened. Vacuum stable at 2.2E-7 T
Friday, April 26, 2013, 13:35: Gas lines evacuated.
Testing Coil current vs Temperature before heating
COIL:RDCUR at 1.95A
COIL:RDVOL at 1.47V
COIL T/C at 86 deg C and still slowly increasing
Tuesday, April 30, 2013
Testing Coil current vs Temperature before heating
COIL:RDCUR at 3.96A
COIL:RDVOL 3.2 V Vacuum starts to increase (base 1.4E-7
COIL:RDVOL 3.8 V T/C at 150 C vacuum at 5E-7
COIL:RDCUR at 3.47A to reduce out-gassing T/C at 175 C
Tuesday, April 30, 2013, 12:39
COIL:RDCUR at 3.96A T/C 225 C
COIL:RDVOL 5.0 V T/C at 250 C vacuum at 6.2E-7
Tuesday, April 30, 2013, 13:00
COIL:RDCUR at 4.25A COIL:RDVOL at 5.7V T/C 290 C
Tuesday, April 30, 2013, 13:10
COIL:RDCUR at 4.15A COIL:RDVOL at 5.75V T/C 310 C
Tuesday, April 30, 2013, 14:53
COIL:RDCUR at 4.15A COIL:RDVOL at 5.85V T/C 320 C
Tuesday, April 30, 2013, 16:30
COIL:RDCUR at 4.15A COIL:RDVOL at 5.89V T/C 328 C
Wednesday, May 01, 2013, 08:16
COIL:RDCUR at 4.15A COIL:RDVOL at 5.95V T/C 350 C - P/S is voltage limited at 5.95V
Ramping down current to 0. T/C logger is required elsewhere.
Friday, May 03, 2013, 12:07: Pumping out gas line through vacuum chamber.
The anode cable has been reconnected (see e-log entry 297)
Friday, May 03, 2013, 14:17: BIAS and EE to 30kV and -800V
Friday, May 03, 2013, 14:24: Started heating TBHT to 280A at 1A/min
Monday, May 06, 2013, 08:46: TBHT @ 276A, Voltage limiting at 2.5V. Increased limit to 2.7V. TGHT to 280A and 2.52V. COIL temp ~100C
Monday, May 06, 2013, 09:48: COIL:RDCUR at 2.93A
Monday, May 06, 2013, 10:34: Coil temp ~240C. Increasing COIL:RDCUR to 3.52A COIL:RDVOL at 4.1V
Monday, May 06, 2013, 11:48: Coil temp 330C COIL:RDCUR at 3.52A RDVOL at 4.9V
Monday, May 06, 2013, 11:54: COIL:RDCUR at 3.9A
Monday, May 06, 2013, 12:56: RDVOL at 5.9V. Coil temp ~380C
Monday, May 06, 2013, 13:47: Cooling down target to correct anode connection.
Tuesday, May 07, 2013, 08:47: De-biased
Tuesday, May 07, 2013, 10:06: Corrected el. connections to cathode floating. Started tube heating to 280A
Wednesday, May 08, 2013, 12:12: De-biased
Wednesday, May 08, 2013, 12:12: Cooling down cathode 1A/min
Thursday, May 09, 2013, 15:22: TPS:IV4 closed |
Tuesday, February 03, 2015, 14:33, Anders Mjos, Empty, LP-SIS, , , , , In progress, Target with new center block and new EE insulator 
|
Also with newly installed RGA
Tuesday, February 03, 2015, 14:33: Roughing
Tuesday, February 03, 2015, 15:05: Turbos started
Tuesday, February 03, 2015, 15:15: Turbos at speed. Vacuum at 3.3E-5 T
Wednesday, February 04, 2015, 13:56: Cooling water on HS circuit on. No response on IG1 or on the RGA (water)
Thursday, February 05, 2015, 09:00: RGA started. Scan 1-100 every 5 min
Thursday, February 05, 2015, 09:02: Opened IV4
Thursday, February 05, 2015, 09:16: Started target heating to 500 / 150 A at 2 / 1 A/min
Thursday, February 05, 2015, 09:24: Opened electrical cage to switch on TGHT PS
Thursday, February 05, 2015, 09:26 : Started target heating to 500 / 150 A at 2 / 1 A/min
Thursday, February 05, 2015, 09:28: BIAS/EZL/EE on and at HV
Thursday, February 05, 2015, 13:21: TGHT voltage limited. Voltage limit increased to 7 V
Thursday, February 05, 2015, 13:53: Continue to 580 A
Thursday, February 05, 2015, 14:25: RGA stopped around 13:34. Started scanning again
Thursday, February 05, 2015, 15:08: Heating to 200 A on TBHT
Friday, February 06, 2015, 10:34: Heating TBHT to 220 A
Friday, February 06, 2015, 11:07: TBHT at 230 A. TGHT at 580 A
Friday, February 06, 2015, 11:50: Cooling down target
Friday, February 06, 2015, 11:56: RGA off
Friday, February 06, 2015, 11:5: BIAS/EZL/EE off
Tuesday, February 10, 2015, 11:34: BIAS/EZL/EE on. Started heating to 580 / 230 A at 4 / 2 A/min. RGA on
Monday, February 16, 2015, 08:46: BIAS/EZL/EE on
Monday, February 16, 2015, 09:13 : Started heating to 580 / 230 A at 4 / 2 A/min. RGA on
Monday, February 16, 2015, 10:10: Opened isolation valve
Monday, February 16, 2015, 14:23: TGHT was found voltage limiting at 7 V. Increased voltage limit to 7.2 V
Temperature read with digital optical pyrometer. Inside target 1800 - 1900 deg C. Outside 1900 - 2000 deg C
Monday, February 16, 2015, 15:50: Starting cool down
Tuesday, February 17, 2015, 08:30: RGA off
Tuesday, February 17, 2015, 08:32: BIAS/EZL/EE off. Isolation valve closed.
Tuesday, February 17, 2015, 08:34: Turbos off
Tuesday, February 17, 2015, 13:58: Venting |
Tuesday, May 21, 2013, 14:58, Rick Maharaj, CTL Febiad, , , , , , , CTL Febiad Installed
|
Ceramic coated coil development target removed. CTL Febiad target installed.
Roughing chamber. |
Tuesday, May 21, 2013, 15:14, Rick Maharaj, CTL Febiad, , , , , , , Turbos Started
|
Turbos started |
Tuesday, May 21, 2013, 15:50, Rick Maharaj, CTL Febiad, , , , , , , Cooling Water Turned On
|
Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T. |
Wednesday, May 29, 2013, 12:10, Anders Mjos, CTL FEBIAD, HP-FEBIAD, , , 38481-5, , Done, CTL Test
|
Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp logger installed
CH1 COIL
CH2 CTL Block
Wednesday, May 29, 2013, 14:51: Opening gas lines
Temperatures [deg C]
COIL: 190
CTL: 44
Wednesday, May 29, 2013, 15:31: Coil at 50A
Temperatures [deg C]
COIL: 212
CTL: 45
Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A
Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A
Thursday, May 30, 2013, 10:03
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.
Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.
Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber
Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.
Thursday, June 06, 2013, 13:23:
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, June 06, 2013, 16:45: TBHT increased ti 290A
Temperatures [deg C]
COIL: 230
CTL: 50
Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.
Temperatures [deg C]
COIL: 227
CTL: 48
Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.
Friday, June 07, 2013, 16:24: TBHT at 296A
Temperatures [deg C]
COIL: 237
CTL: 50
Monday, June 10, 2013, 08:19
Temperatures [deg C]
COIL: 232
CTL: 49
Monday, June 10, 2013, 16:55: COIL at 60A
Temperatures [deg C]
COIL: 244
CTL: 49
Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A
Temperatures [deg C]
COIL: 242
CTL: 49
Tuesday, June 11, 2013, 11:02: COIL at 70A
Temperatures [deg C]
COIL: 256
CTL: 49
Tuesday, June 11, 2013, 15:49: COIL at 80A
Temperatures [deg C]
COIL: 272
CTL: 49
Wednesday, June 12, 2013, 08:19:
Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.
Thursday, June 13, 2013, 08:37: Turbos stopped.
Thursday, June 13, 2013, 09:20: Water lines purged.
Thursday, June 13, 2013, 09:41: Venting
Thursday, June 13, 2013, 10:19: Target removed |
Friday, May 24, 2013, 15:13, Aurelia Laxdal, CLT FEBIAD, , , , , , , CLT FEBIAD conditioning started
|
Purged the gas lines, turned on the HV and started the heaters for CLT FEBIAD: TGHT up to 580A and TBHT up to 230A. |
Thursday, January 30, 2020, 15:25, Aaron Schmidt, C(#1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C(#1) HS
|
Was for UC# 32* - Schedule change, now for C#1
Thursday, January 30, 2020, 15:13: Roughing.
Thursday, January 30, 2020, 15:46: Turbo pumps on.
Thursday, January 30, 2020, 15:50: IG1 on.
Friday, January 31, 2020, 08:14: Waterlines opened. No Vacuum response. Vacuum ok @ 6.10e-07T.
Friday, January 31, 2020, 08:16: Power / sources on
Friday, January 31, 2020, 08:18: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 03, 2020, 12:56: Auto-cooling @ 2 A per min.
Wednesday, February 05, 2020, 09:07: Power / sources off. Waterlines purged. IG1 & turbo pumps off.
Friday, February 07, 2020, 11:45:
Short was found on the HS Lid from the TGHT on the left. Milled out 1/8" off both HS lid / TGHT gaps. Lots of clearance now. Reheat req'd. |
Tuesday, October 18, 2022, 13:25, Aaron Schmidt, C#5, LP-SIS, , , 45235-5, 44691-13, In progress, Conditioning C#5
|
Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28: BV1A open
Wednesday, October 19, 2022, 12:14: TP1B on.
Wednesday, October 19, 2022, 12:18: TP1A on.
Wednesday, October 19, 2022, 12:26: IG1 on.
Wednesday, October 19, 2022, 12:34: IV4 open & Closed. Vacuum @ 4.13e-06T.
Wednesday, October 19, 2022, 12:39: FS#5 Water line opened.
Wednesday, October 19, 2022, 12:40: PS on.
Wednesday, October 19, 2022, 12:43: Optics PS on. Unlocked.
Wednesday, October 19, 2022, 12:44: Sources on. Vacuum @ 3.21e-06T.
Wednesday, October 19, 2022, 12:46: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Wednesday, October 19, 2022, 12:47: TGHT / TBHT @ 10 / 10 A manually.
Wednesday, October 19, 2022, 12:48: IV4 Open.
Wednesday, October 19, 2022, 12:53: Optics set.
Controls updated
Monday, November 07, 2022, 12:40: Optics set
Monday, November 07, 2022, 13:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 07, 2022, 13:15: Auto-ramping TGHT / TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)
Monday, November 07, 2022, 13:35: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. Spark*
Monday, November 07, 2022, 13:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Monday, November 07, 2022, 13:41: BIAS / EE / EZL @ 45 / -2.3 / 20 kV with multiple sparks near the 44-45kV end of the tap up.
Monday, November 07, 2022, 14:09: Spark. Audible outside the cage, however vacuum was also affected.
Monday, November 07, 2022, 14:49: No further sparks. HV check ok.
Monday, November 07, 2022, 14:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. |
Thursday, April 17, 2025, 16:11, Dave Neilson, C#5, , , , , 45235 - 5, , LPSIS C#5 conditioning
|
Thursday, April 17, 2025, 15:46 target installed. now roughing
Thursday, April 17, 2025, 17:12 Turbo pumps on.
Tuesday, April 22, 2025, 15:45 Water cooling on. no effect on vacuum
Tuesday, April 22, 2025, 15:46 ramping TGHT TBHT to 580A 230A at .5A/30s
Wednesday, April 23, 2025, 09:21 slowly increasing HV BIAS/EE/EZL to 30kV, 2.5kV, 13kV, watching for sparks.
Wednesday, April 23, 2025, 10:46 first spark seen at 28kV, ezl 13kV.
Wednesday, April 23, 2025, 12:35 at HV BIAS >42kV. have seen 3 large sparks outside of the chamber (not due to the target assembly, that appears to be quite stable). leaving at 41kV until appears sparks have ceased.
Wednesday, April 23, 2025, 13:59 No sparks at 41kV. while increasing to 42kV, 3 sparks occurred over ~75min. say 25min spark period at 41.5kV
Wednesday, April 23, 2025, 14:00 dropped HV to 30kV, EZL to 13kV. turning on optics for scans. (controls for TMS Q2/Q5 must be looked at. it often must be reconfigured in canbus settings. sometimes multiple times to turn it on.)
FC0: 2.12e-8 A
Wire scanners on ISAC fiducials setting:
RPM0A: 2025-04-23 C#5 RPM0A_1nA, 2025-04-23 C#5 RPM0A_33nA
RPM0B: 2025-04-23 C#5 RPM0B_1nA, 2025-04-23 C#5 RPM0B_33nA
Wednesday, April 23, 2025, 14:12 running mass scan. - 2025-04-23 C#5 conditioning mass scan
Mass 40 RPM6, ISAC fiducials:
2025-04-23 C#5 RPM6A_33nA
2025-04-23 C#5 RPM6B_33nA
Wednesday, April 23, 2025, 14:50 decreasing HV to 0 0 0
Wednesday, April 23, 2025, 15:01 decreasing TGHT TBHT to 0 0 at 1A/30s
Thursday, April 24, 2025, 08:16 turning off turbo pumps |
Tuesday, September 27, 2022, 07:55, Aaron Schmidt, C#4, LP-SIS, ITE, TM4, 44691-3, 44378-23, In progress, Conditioning C#4 w/ thermocouples   
|
Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X
O - X
X - X
X - X
Tuesday, September 27, 2022, 07:51: Roughing.
Tuesday, September 27, 2022, 08:25: TP1B on.
Tuesday, September 27, 2022, 08:45: TP1A on.
Tuesday, September 27, 2022, 11:02: Vacuum @ 8.31e-06T
Tuesday, September 27, 2022, 11:04: Waterline FS#5 opened. Vacuum @ 8.13e-06T. Power on
Data logger connected as per FBP
Tuesday, September 27, 2022, 12:18: Sources/PS on.
Tuesday, September 27, 2022, 12:21: TGHT / TBHT manually tapped up to 10A.
Tuesday, September 27, 2022, 12:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 27, 2022, 12:34: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Tuesday, September 27, 2022, 12:35: Sparks* @ 37 KV BIAS. Outside the cage. x 2
Tuesday, September 27, 2022, 12:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Tuesday, September 27, 2022, 12:47: BIAS / EE / EZL @ 45 / -2.3 / 19 kV with multiple sparks on the tap up.
Tuesday, September 27, 2022, 13:00: 2 more sparks. TSG:CBC down. (Red)
Tuesday, September 27, 2022, 13:08: BIAS / EE / EZL @ 47.2 / -2.4 / 20 kV. Significant spark outside the cage.
Tuesday, September 27, 2022, 13:10: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. Spark outside the cage.
Tuesday, September 27, 2022, 13:12: Blue glow / crack flowing across the TBHT.
Tuesday, September 27, 2022, 13:15: The glow is flexing? Fading in & out.
Tuesday, September 27, 2022, 13:50: HV Tap down to 0 kV
Tuesday, September 27, 2022, 14:13: TSG:CBC controls card replaced. Operation returned.
Tuesday, September 27, 2022, 14:14: IV4 opened.
Tuesday, September 27, 2022, 14:17: Optics set.
Tuesday, September 27, 2022, 14:19: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per min.
Tuesday, September 27, 2022, 14:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Remote operation clear.
Tuesday, September 27, 2022, 18:20: TS tripped shortly after 3:35 PM

Tuesday, September 27, 2022, 18:30: Reset TS sources & optics
Tuesday, September 27, 2022, 18:49: Auto-ramping TGHT / TBHT to 300 / 150 @ 1A per min. Allow for a gradual out gassing.
Tuesday, September 27, 2022, 21:20: TGHT / TBHT @ 150A Vacuum @ 2.15e-06T. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 22:08: TGHT / TBHT @ 200 / 150 A. Vacuum @ 2.15e-06T. Stable. TGHT ramp ongoing @ 1 A per min.

Tuesday, September 27, 2022, 23:19: Auto-ramp halted. Sped up to 2 A per min. Vacuum @ 1.96e-06T. TGHT @ 270 A.
Tuesday, September 27, 2022, 23:41: TGHT / TBHT @ 300 / 150 A. Vacuum @ 1.97e-06T

Wednesday, September 28, 2022, 06:36: Auto-ramping TGHT to 350A @ 1A per min.
Wednesday, September 28, 2022, 08:14: Vacuum remained stable @ 1.49e-06T. Auto-ramping TGHT / TBHT to 400 / 200 A @ 2A per min.
Wednesday, September 28, 2022, 08:48: Increase in vacuum up to 2.50e-06T+ followed by a drop in TBHT voltage. TGHT / TBHT remain stable @ 400 / 200 A. Vacuum stabilizing @ 2.32e-06T. HV off.
Wednesday, September 28, 2022, 09:15: Data logger setup. Pins moved from 3 & 4 to 4 & 5. Temperature @ 50.6 C.
Wednesday, September 28, 2022, 09:20: HV sources & optics back on. Tap up.
Wednesday, September 28, 2022, 09:33: Auto-ramping TGHT to 450A @ 2 A per min. Some small sparks noted.
Wednesday, September 28, 2022, 09:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, September 28, 2022, 09:59: Auto-ramping TGHT to 500A @ 2 A per min. Some small sparks noted although less frequent.
Wednesday, September 28, 2022, 10:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 28, 2022, 10:41: BIAS lowered to 25 kV.
Wednesday, September 28, 2022, 11:09: TGHT / TBHT @ 580 / 230 A. BIAS @ 30 kV. Unstable / sparking.Very active on FC0
Wednesday, September 28, 2022, 11:29: Mass & wire scans ongoing. Reset DAC PS.
Wednesday, September 28, 2022, 11:58: Mass, wire & emittance scans complete. FC0 in. Auto-cooling @ 2 A per min.
Wednesday, September 28, 2022, 13:16: Cooling aborted for measurement.
Wednesday, September 28, 2022, 13:21: Auto-cooling @ 2 A per min.
Thursday, September 29, 2022, 07:20: IV4 closed. Sources off. IG 1 & TP off. |
Tuesday, September 14, 2021, 17:12, Aaron Schmidt, C#3, LP-SIS, ITW, TM2, 44691-7, 44378-11, In progress, C#3 Conditioning 6x
|
Tuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37: TP1B on.
Tuesday, September 14, 2021, 17:47: TP1A on.
Tuesday, September 14, 2021, 17:55: IG1 on.
Wednesday, September 15, 2021, 06:51: Waterlines opened. Vacuum Stable @ 4.46e-06T.
Wednesday, September 15, 2021, 07:01: Power/sources/optics on - Set.
Wednesday, September 15, 2021, 07:02: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.8 |
3.99 |
TBHT |
24.6 |
3.23
|
COIL + EE |
23.6 |
5.02 |
TGHT |
23.8 |
5.66 |
Wednesday, September 15, 2021, 07:05: Quick system check. TGHT / TBHT @ 10 / 10 A. OK.
Wednesday, September 15, 2021, 07:06: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Not ok. BIAS short!!!* set to 1kV, zero read back. 0V & 0.230 mA.
Wednesday, September 15, 2021, 08:01: Hook was still in the cage. Removed*
Wednesday, September 15, 2021, 08:05: Quick system check. TGHT / TBHT @ 10 / 10 A. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. All ok. Vacuum @ 4.02e-06T. Allow to stabilize.
Thursday, September 16, 2021, 04:38: Vacuum @ 2.13e-06T. Auto-ramping TGHT / TBHT to 350 A / 150 A @ 2 A per min.
Thursday, September 16, 2021, 04:44: BIAS / EE / EZL @ 20 / -1.0 / 10 kV.
Thursday, September 16, 2021, 08:58: Auto-ramping TGHT / TBHT to 580 A / 230 A @ 2 A per min.
Thursday, September 16, 2021, 13:20: Auto-ramp halted. Vacuum @ 3.12 e-06T. TGHT / TBHT @ 410 / 210. Adjusted good vacuum / increment limit t0 5.0e-06T & 7e-06T (Back off limit). Continue auto-ramping TGHT / TBHT to 580 A / 230 A @ 2 A per min.
Thursday, September 16, 2021, 16:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 543+/ 230 A. TGHT still ramping on vac limit. Good wire scans so far.
Thursday, September 16, 2021, 16:36: Mass & wires scans proceeding.
Thursday, September 16, 2021, 17:16: Scans ok. TGHT @ 550 A. Vacuum @ 5.12e-06T.
Friday, September 17, 2021, 10:41: Mass & wire scans ok. BIAS / EE / EZL to 0 kV.
Sunday, September 19, 2021, 20:33: Auto-cooling @ 1 A per min.
Monday, September 20, 2021, 06:10: Power/sources off. IV4 off. Lock-out.
Monday, September 20, 2021, 06:13: IG1 off. Turbo pumps off.
Thursday, September 23, 2021, 05:04: Venting. |
Wednesday, September 30, 2020, 06:23, Aaron Schmidt, C#2, LP-SIS, ITW, TM2, 44139-9, 43515-2, In progress, Conditioning C#2  
|
Wednesday, September 30, 2020, 06:14: Power / sources on.
Wednesday, September 30, 2020, 06:17: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Wednesday, September 30, 2020, 06:22: Optics set (minus MB1).
Wednesday, September 30, 2020, 07:11: Pair of gradual vacuum spikes noticed. Up to 3.5e-06T & 2.6e-06T, then back down to 2.3e-06T.
Wednesday, September 30, 2020, 07:59: Auto-ramping TGHT / TBHT to 450 / 200 A @ 3 A per min.
Wednesday, September 30, 2020, 08:04: Abort auto-ramping. BIAS @ 10 kV. EZL Appears to have a short. EE up to -1.5 kV ok.
Wednesday, September 30, 2020, 08:11: BIAS back to 0 kV. Auto cooling @ 4A per min.
Wednesday, September 30, 2020, 09:21: Tap down TGHT to 0 from 40 A.
Wednesday, September 30, 2020, 09:22: Power/sources off.
Wednesday, September 30, 2020, 09:23: IG1 & Turbo pumps off.
Wednesday, September 30, 2020, 10:48: Venting.
Wednesday, September 30, 2020, 11:31: Wire found touching on EZL to chamber. Bypassed interlocks. EZL on. 200 V ok 500 V ok. Back to 0V.
Wednesday, September 30, 2020, 11:33: Bypasses removed.
Wednesday, September 30, 2020, 11:37: Roughing.
Wednesday, September 30, 2020, 12:22: Turbo pumps on.
Wednesday, September 30, 2020, 16:41: TGHT / TBHT to 10 / 10 A manually. BIAS / EE / EZL @ 1 / 0.1 / 1 kV. No shorts. Vacuum @ 2.60e-06T.
Wednesday, September 30, 2020, 16:47: HV & Heaters tapped back to 0 A & 0 kV.
Thursday, October 01, 2020, 05:27: Auto-ramping TGHT / TBHT to 150 / 75 A @ 3 A per min.
Thursday, October 01, 2020, 07:04: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Thursday, October 01, 2020, 07:29: Optics on. (MB1 Still interlocked but connected now)
Thursday, October 01, 2020, 07:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Thursday, October 01, 2020, 07:39: IV4 open.
Thursday, October 01, 2020, 07:55: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, October 01, 2020, 08:34: Voltage drops on BIAS. Auto ramping halted.
Thursday, October 01, 2020, 08:37: BIAS / EE / EZL @ 15 / -1.0 / 8.5 kV.
Thursday, October 01, 2020, 10:04: Auto-ramping TGHT / TBHT to 450 / 230 A @ 1 A per min.
Thursday, October 01, 2020, 11:13: Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min.
Thursday, October 01, 2020, 14:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. BIAS instability ongoing. although less than before. Initial RPM0A & RPM0B wire scans ok. MB1 Still interlocked.
Thursday, October 01, 2020, 14:42: BIAS current limit increased to 0.150 mA
Thursday, October 01, 2020, 16:24: BIAS / EE / EZL @ 20 / -1.5 / 6.5 kV.
Friday, October 02, 2020, 09:55: BIAS / EE / EZL @ 25 / -1.5 / 10 kV.
Friday, October 02, 2020, 10:43: Spark* Tripped Optics, IV4 & TP1A. Optics reset. Trouble on IV4 & TP1A
Friday, October 02, 2020, 10:58: IV4 reset. TP1A not back yet.
Friday, October 02, 2020, 11:22: TP1A reset and on.
Friday, October 02, 2020, 12:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Friday, October 02, 2020, 13:58: HV to 0 kV
Friday, October 02, 2020, 14:00: Auto-Cooling @ 1 A per min.
Tuesday, October 13, 2020, 08:07: Power / sources off. HS Waterlines purged.
Tuesday, October 13, 2020, 08:09: IG1 off. Turbo pumps off.
Tuesday, October 13, 2020, 10:31: Venting. |
|