  292   Wednesday, April 10, 2013, 12:14 Anders MjosTa#40HP-SISITETM438295-4 DoneConditioning Ta#40

 Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.

Wednesday, April 10, 2013, 13:05: Venting

Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.

Wednesday, April 10, 2013, 13:37: Roughing

Wednesday, April 10, 2013, 13:58: Started turbos

Wednesday, April 10, 2013, 14:07: Turbos at speed

Wednesday, April 10, 2013, 14:08: Vacuum at 9.2E-6 Torr


 Thursday, April 11, 2013, 08:26: Opened cooling water. Vacuum stable at 2.2E-7 Torr


Monday, April 15, 2013, 08:40: HV conditioned to 30kV TSG:BIAS:RDCUR at 37 uA

Monday, April 15, 2013, 08:46: Started Target Heat Ramp 580A / 230A

Monday, April 15, 2013, 13:30: Target at temperature TGHT:RDCUR=574A, TBHT:RDCUR=230A

Monday, April 15, 2013, 15:10: Mass scan

Monday, April 15, 2013, 16:21: Target will be left at temperature overnight.


 Tuesday, April 16, 2013, 08:40: Mass scan

Tuesday, April 16, 2013, 13:08: Started Target Cooling Sequence


 Wednesday, April 17, 2013, 08:43: High voltage BIAS to zero

Wednesday, April 17, 2013, 08:47: Turbos off

Wednesday, April 17, 2013, 16:20: Target will likely be removed tomorrow Thursday.


Thursday, April 18, 2013, 11:13  : Venting

Thursday, April 18, 2013, 11:17: Water lines purged

 Thursday, April 18, 2013, 11:29: Chamber vented. Target Removed

  295   Thursday, April 18, 2013, 13:50 Anders MjosTa#40HP-SISITETM438295-4 DoneTa#40 stored under vacuum

Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs

Thursday, April 18, 2013, 13:48: Rouging

Thursday, April 18, 2013, 14:11: Starting turbos

Thursday, April 18, 2013, 14:20 : Turbos at speed

Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T 


Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T


Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.

Monday, April 22, 2013, 09:32: Turbos off.

Monday, April 22, 2013, 10:57: Venting

Monday, April 22, 2013, 12:25: Vented

Monday, April 22, 2013, 14:09: Roughing

Monday, April 22, 2013, 14:31: Started Turbos

Monday, April 22, 2013, 14:40: Turbos at speed

Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T


Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday


Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.

Thursday, April 25, 2013, 13:27: Venting

  934   Thursday, June 23, 2022, 11:00 Aaron SchmidtSiC#44HP-FEBIADITETM437978-144378-24In progressConditioning SiC#44

Thursday, June 23, 2022, 10:58: Roughing.

Thursday, June 23, 2022, 11:03: BV1A open.

Thursday, June 23, 2022, 11:34: TP1B on

Thursday, June 23, 2022, 11:41: TP1A on.

Thursday, June 23, 2022, 11:49: IG1 on.

Thursday, June 23, 2022, 12:25: Gases on.

Thursday, June 23, 2022, 12:30: Power on. Cage locked up

Thursday, June 23, 2022, 14:14: Vacuum @ 3.23e-06T.

Thursday, June 23, 2022, 14:15: Waterlines opened. Vacuum stable.

Thursday, June 23, 2022, 14:16: IV4 opened.

Thursday, June 23, 2022, 14:17: Sources on.

Thursday, June 23, 2022, 14:18: Optics set. FM tune.

Thursday, June 23, 2022, 14:21:  Electrical check OK. Will leave as is. Remote operation ready.

BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.

TGHT / TBHT @ 5 A each. Coil @ 5 A.

Thursday, June 23, 2022, 14:22: Reset Kepco (E-rig) PS.


Friday, June 24, 2022, 09:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Friday, June 24, 2022, 09:17: BIAS / EE / EZL @ 20 / -1.5 / 10 kV. 

Friday, June 24, 2022, 13:18: Ramping ongoing. TGHT / TBHT @ 510 / 290 A. Vacuum @ 3.65e-06T

Friday, June 24, 2022, 19:19: FM Tune on optics / Sources. Vacuum @ 1.60e-06T. BIAS / EE / EZL @ 30 / -1.5 / 15 kV. 

Friday, June 24, 2022, 19:42: Coil to 15 A. Anode to 200 V. 

Friday, June 24, 2022, 20:00: Mass scans complete. 

Friday, June 24, 2022, 20:01:  BIAS / EZL reduced to 20 / 10 kV.

Friday, June 24, 2022, 20:02: Anode @ 100 V. 


Monday, June 27, 2022, 09:34: BIAS / EE / EZL @ 30 / -1.5 / 15 kV.

Monday, June 27, 2022, 09:36: Anode @ 200 V. Coil @ 40 A. Vacuum @ 9.99e-07T

Monday, June 27, 2022, 10:09: Last scans complete. Auto-cooling @ 2 A per min.

Monday, June 27, 2022, 10:19: Anode, coil, & HV to 0.

Monday, June 27, 2022, 10:20: IV4 & SV5 Closed.


Wednesday, June 29, 2022, 10:57: Sources & IG1 off. Turbo pumps off

Wednesday, June 29, 2022, 12:25: Venting.

Attachment 1: SiC#44_-_R.docx
Attachment 2: ER-580-290-30kV-m28.txt
value (Voltage offset      40.0000)
     75.0000
      1.0000
     95.0000
  29978.0220
21
21
./emit.dat
 -0.1068 -0.0937 -0.1093 -0.1120 -0.1041 -0.1028 -0.1096 -0.1031 -0.1041 -0.1068 -0.1071 -0.1080 -0.1077 -0.1038 -0.1031 -0.1065 -0.0970 -0.0961 -0.1062 -0.0919 -0.0980
 -0.1077 -0.0909 -0.1108 -0.1105 -0.0977 -0.1022 -0.1102 -0.1028 -0.1053 -0.1062 -0.1077 -0.1065 -0.1086 -0.1041 -0.1056 -0.1074 -0.0983 -0.0958 -0.1038 -0.0937 -0.0980
 -0.1074 -0.0952 -0.0888 -0.1035 -0.1013 -0.0894 -0.0876 -0.0876 -0.1053 -0.1074 -0.0864 -0.0909 -0.1074 -0.0864 -0.0891 -0.1059 -0.0919 -0.0916 -0.0867 -0.0919 -0.0934
 -0.1065 -0.0919 -0.0928 -0.1041 -0.0943 -0.0925 -0.0925 -0.0934 -0.0998 -0.1096 -0.0916 -0.0916 -0.1096 -0.0940 -0.0940 -0.1028 -0.0922 -0.0940 -0.1028 -0.0900 -0.0949
 -0.1071 -0.0916 -0.0925 -0.1038 -0.0970 -0.0909 -0.0937 -0.0943 -0.1001 -0.1096 -0.0946 -0.0925 -0.1093 -0.0934 -0.0958 -0.1083 -0.0928 -0.0925 -0.0916 -0.0928 -0.0952
 -0.1096 -0.0925 -0.0906 -0.1053 -0.0961 -0.0937 -0.0934 -0.0943 -0.1010 -0.1062 -0.0931 -0.0940 -0.1086 -0.0946 -0.0903 -0.1062 -0.0943 -0.0916 -0.0998 -0.0912 -0.0958
 -0.1096 -0.0940 -0.0934 -0.1050 -0.0992 -0.0925 -0.0919 -0.0934 -0.1031 -0.1080 -0.0928 -0.0970 -0.1077 -0.0934 -0.0934 -0.1031 -0.0931 -0.0916 -0.0943 -0.0931 -0.0958
 -0.1077 -0.0940 -0.0903 -0.1047 -0.0977 -0.0931 -0.0922 -0.0919 -0.1001 -0.1074 -0.0925 -0.0974 -0.1089 -0.0934 -0.0952 -0.1031 -0.0906 -0.0922 -0.1013 -0.0931 -0.0964
 -0.1093 -0.0916 -0.0922 -0.1016 -0.0940 -0.0925 -0.0940 -0.0928 -0.1013 -0.1086 -0.0928 -0.0952 -0.1117 -0.0937 -0.0934 -0.1035 -0.0919 -0.0943 -0.0946 -0.0909 -0.0980
 -0.1074 -0.0900 -0.0922 -0.1025 -0.0961 -0.0897 -0.0916 -0.0934 -0.1001 -0.1080 -0.0937 -0.0949 -0.1102 -0.0925 -0.0912 -0.1047 -0.0919 -0.0949 -0.1062 -0.0928 -0.0967
 -0.1071 -0.0912 -0.0919 -0.1028 -0.0983 -0.0919 -0.0912 -0.0919 -0.1010 -0.1071 -0.0943 -0.0943 -0.1093 -0.0937 -0.0909 -0.1059 -0.0916 -0.0922 -0.0888 -0.0931 -0.0958
 -0.1086 -0.0928 -0.0922 -0.1041 -0.0980 -0.0937 -0.0925 -0.0934 -0.1010 -0.1083 -0.0919 -0.0937 -0.1093 -0.0937 -0.0922 -0.1019 -0.0931 -0.0903 -0.0934 -0.0937 -0.0943
 -0.1080 -0.0934 -0.0912 -0.1038 -0.0961 -0.0937 -0.0931 -0.0919 -0.1016 -0.1089 -0.0916 -0.0946 -0.1123 -0.0940 -0.0940 -0.1050 -0.0943 -0.0925 -0.1044 -0.0922 -0.0980
 -0.1086 -0.0912 -0.0925 -0.1022 -0.0977 -0.0909 -0.0925 -0.0919 -0.1013 -0.1086 -0.0919 -0.0946 -0.1120 -0.0922 -0.0946 -0.1025 -0.0922 -0.0931 -0.0922 -0.0928 -0.0949
 -0.1086 -0.0919 -0.0931 -0.1035 -0.0940 -0.0903 -0.0922 -0.0937 -0.1001 -0.1080 -0.0931 -0.0928 -0.1086 -0.0934 -0.0897 -0.1047 -0.0919 -0.0912 -0.0885 -0.0919 -0.0925
 -0.1096 -0.0903 -0.0922 -0.1019 -0.0977 -0.0922 -0.0922 -0.0937 -0.1019 -0.1068 -0.0940 -0.0949 -0.1089 -0.0952 -0.0912 -0.1028 -0.0916 -0.0922 -0.0900 -0.0928 -0.0937
 -0.1083 -0.0922 -0.0909 -0.1016 -0.0970 -0.0937 -0.0922 -0.0912 -0.1019 -0.1089 -0.0925 -0.0946 -0.1086 -0.0949 -0.0943 -0.1044 -0.0940 -0.0906 -0.1013 -0.0925 -0.0970
 -0.1077 -0.0925 -0.0919 -0.1022 -0.0964 -0.0928 -0.0928 -0.0925 -0.1019 -0.1080 -0.0922 -0.0943 -0.1093 -0.0931 -0.0958 -0.1059 -0.0937 -0.0928 -0.0940 -0.0916 -0.0974
 -0.1068 -0.0922 -0.0934 -0.1038 -0.0961 -0.0922 -0.0937 -0.0940 -0.1010 -0.1086 -0.0912 -0.0934 -0.1108 -0.0912 -0.0922 -0.1013 -0.0922 -0.0922 -0.0952 -0.0897 -0.0961
 -0.1086 -0.0906 -0.0931 -0.1031 -0.0946 -0.0897 -0.0931 -0.0937 -0.1007 -0.1068 -0.0937 -0.0943 -0.1105 -0.0943 -0.0912 -0.1059 -0.0912 -0.0909 -0.1105 -0.0909 -0.0949
 -0.1080 -0.0900 -0.0925 -0.1041 -0.0974 -0.0916 -0.0928 -0.0946 -0.0995 -0.1077 -0.0925 -0.0949 -0.1099 -0.0967 -0.0909 -0.1041 -0.0925 -0.0916 -0.0961 -0.0931 -0.0967
Attachment 3: SiC#44.docx
  988   Tuesday, December 12, 2023, 16:11 Dave NeilsonShunt #0   -- P2N Thermal Test

Tuesday, December 12, 2023, 16:07  - Pumping down test stand overnight for testing tomorrow. vacuum good, turbos starting now. Four thermocouples attached inside. tc1: high on (+) TGHT leg, pins 1+2. tc2: at target terminal (+), pins 4+5. tc3: at target terminal (-), pins 6+7. tc4: low on (+) TGHT leg, pins 8+9.

 Wednesday, December 13, 2023, 09:32 : Vacuum at 8.2e-7 T.  Electrical team is finishing connecting the cables. Claim it will be complete at 11am.

 Wednesday, December 13, 2023, 11:41Started both tc loggers at 11:40 - important for offset time. Beginning ramp as well on ATTS TGHT. set vacuum values high at 1e3 1e4 to bypass ATTS interlock, which does not apply here. ramping to 600A with step increment 10A and wait interval 10s.

    ATTS TGHT claims ramping in progress, but increased voltage is reported only on the autoramp window, which reports increasing the target amperage by 10A each 10s. However, no increased voltage reading is reported there, nor is there any increased current. ATTS:TGHT:RDCUR and ATTS:TGHT:RDVOL are ~0 as well. No increased temperature on any of 6 tc channels.

Wednesday, December 13, 2023, 11:57 ATTS TGHT power supplies appear to be under local control. It also appears (low current right now) that the value reported in EPICS is 1/3 of the value reported on the master power supply. It may be that the epics value is per output of the individual 3 supplies, while the total output is reported on the PS display. Planning to now increase to 300A and reach steady state.

Wednesday, December 13, 2023, 12:13 : 1/3 ratio idea confirmed at 33A EPICS reading / 100A master reading and again at 100A EPICS reading / 300A master reading. 300A now reached. Waiting for 20min. Temps inside ~ 21°C. Temps on feed through terminals ~22°C

 Wednesday, December 13, 2023, 12:26:  200epics 600A master. tc out: 23.0, 22.6. tc in: 21.4 21.7 22.0 20.8.  waiting

Wednesday, December 13, 2023, 12:36  No temp change over 10 min. increasing to 900A

 Wednesday, December 13, 2023, 12:47: 900A. outside tc 24.5 23.7°C. inside tc 21.7 23 23.6 21.0 °C.

Wednesday, December 13, 2023, 13:04: increasing to 1200A

Wednesday, December 13, 2023, 13:11  1200A. outside tc 27.1 25.4. inside tc 22.6 24.8 25.9 21.7 °C. Will wait to observe stability

Wednesday, December 13, 2023, 13:20 after ~10min. outsideTC: 27.6 25.9. insideTC: 22.5 25.2 26.1 21.8 °C.  Temperatures appear stable. increasing to 1300A

 Wednesday, December 13, 2023, 13:25   at 1300A. outsideTC: 28.3 26.5, insideTC: 22.8 25.7 26.8 21.8.   waiting for stability

 Wednesday, December 13, 2023, 13:38 after ~10min, outsideTC 29.1 27.1, insideTC 23.2, 26.2, 27.4, 21.9.  stable. Increasing to 1400A

 Wednesday, December 13, 2023, 13:41:   1400A. outsideTC 29.8, 27.6. insideTC 23.4 26.7 28.2 21.4

Wednesday, December 13, 2023, 13:50     temps look stable 30.1 27.9,     23.3 27.7 28.4 21.4 .    going to increase to 1500A   ---- turning off turbo pumps in case of failure at high current

 Wednesday, December 13, 2023, 13:57    at 1500A. temps:   30.9 28.3.  23.6 27.2 28.9 21.8 .

 Wednesday, December 13, 2023, 14:07  temps look stable:   31.5 28.8...   23.6 28.0 29.4 22.0     going to increase to 1600A

 Wednesday, December 13, 2023, 14:10    at 1600A     temps:  32.0 29.1..... 23.8 28.2 30.0 22.2

 Wednesday, December 13, 2023, 14:20   temps stable: 32.8 29.7,    23.9 28.9 30.6 22.2,.  increasing to 1700A

 Wednesday, December 13, 2023, 14:24 at 1700A    temps:  33.5 30.2       24.3 29.3 31.5 22.4

 Wednesday, December 13, 2023, 14:35  temps stable :   34.2 31.0       24.3 30.0 32.0 22.6 increasing to 1800A

Wednesday, December 13, 2023, 14:38  at 1800A. temps:    35.0 31.3      24.6 30.3 32.7 22.8

 Wednesday, December 13, 2023, 14:47  temps:   35.8 32.0      24.7 31.2 33.3 22.8

 Wednesday, December 13, 2023, 14:58   temps stable. 36.0 32.2    24.7 31.2 33.3 23.1       turning down power supply

 Wednesday, December 13, 2023, 15:23 power supply off. strip tool data dumped to test1.txt --- copy this elsewhere. TCs left to continue monitoring for any additional cooldown.

Wednesday, December 13, 2023, 16:13    tc recording stopped.

 

repeat test

Thursday, December 14, 2023, 15:18    tcs start time

Thursday, December 14, 2023, 15:20  increasing TGHT from ATTS directly to 1500A and waiting for steady state temperature. Aiming for similar ramp rate to previous ~1A/s, 60A/min.   tcs at cold read 21.9 21.9... 21.1 20.9 20.9 20.7

 Thursday, December 14, 2023, 15:39  at 1500A

Thursday, December 14, 2023, 15:50   after~10min, temps at 31.3 28.4... 23.6 27.6 29.1 22.3

 Thursday, December 14, 2023, 15:59 after ~20min, temps at 31.5 28.6.... 23.5 27.5 28.8 22.5.    stable.  increasing to 1800A

 Thursday, December 14, 2023, 16:03  at 1800A 

Thursday, December 14, 2023, 16:14   after 10min - 35.8 31.8      24.7 30.8 32.6 23.1

 Thursday, December 14, 2023, 16:25  after 20min - 36.3 32.2     24.7 30.9 32.6 23.4    stable.   decreasing current.

Thursday, December 14, 2023, 16:42    0A... cooling for a while

 Thursday, December 14, 2023, 16:56  22.8 22.8    21.1 21.0 21.2 20.8

  615   Friday, December 01, 2017, 14:31 Aaron Schmidt LP-SIS  (Blank)42752-3In progressSilver plated bolts test / Outgas TS

Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.

Friday, December 01, 2017, 14:26: Roughing. BV1B open.

Friday, December 01, 2017, 14:27: BV1A open

Friday, December 01, 2017, 14:47: Turbo pumps on.

Friday, December 01, 2017, 14:53: Ion gauge on (Vacuum @ 1.44 e-04T)

Friday, December 01, 2017, 14:57: Turbos @ speed. RGA on.


Monday, December 04, 2017, 09:27: System rebooted after weekend power outage.


Tuesday, December 05, 2017, 08:10: RGA on.

Tuesday, December 05, 2017, 08:17: Waterlines opened. Vacuum ok @ 1.56e-06T

Tuesday, December 05, 2017, 08:20: Power on. (Power supplies in off position) Turn power off

Open back. switch power supplies to on.

Tuesday, December 05, 2017, 08:35: Power on

Tuesday, December 05, 2017, 08:37: Auto ramping TGHT / TBHT to 150 / 75 A @ 2A per min.

Tuesday, December 05, 2017, 09:55: Auto ramping TGHT / TBHT to 200 / 75 A @ 2A per min.

Tuesday, December 05, 2017, 10:28: Auto ramping TGHT / TBHT to 400 / 150 A @ 2A per min. Vacuum @ 1.56e-06T.

Tuesday, December 05, 2017, 12:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 3.03e-06T.

Tuesday, December 05, 2017, 12:58: Auto ramping halted. Vacuum @ 3.12e-06T. Allow vacuum to improve.


Wednesday, December 06, 2017, 08:03: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 2.65e-06T. Added note*** The Silver bolts are NOT vented ***.

Wednesday, December 06, 2017, 08:30: TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.03e-06T and holding. Auto-ramping continued. No halt.

Wednesday, December 06, 2017, 10:45: Check. TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.36e-06T and holding. Auto-ramping on wait.

Wednesday, December 06, 2017, 14:37: Check. TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.21e-06T and holding. Auto-ramping halted. Allow Vacuum to improve.


Thursday, December 07, 2017, 07:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 2.33e-06T.

Thursday, December 07, 2017, 09:00: Check. TGHT / TBHT @ 571 / 200 A. Vacuum @ 3.19e-06T. Auto-ramping halted. Allow Vacuum to improve.


Friday, December 08, 2017, 07:52: Auto ramping TGHT to 580 A from 571 A @ 2A per min. Vacuum @ 2.04e-06T.


Monday, December 11, 2017, 08:00: Auto cooling @ 2A per min.

Monday, December 11, 2017, 13:45: Sources/power off. Water cooling off.


Tuesday, December 12, 2017, 06:35: RGA, Ion gauge, turbo pumps off.

Tuesday, December 12, 2017, 07:45: Venting.

Tuesday, December 12, 2017, 08:23: Doors open.

Attachment 1: 1st_silver_bolts_test.docx
Attachment 2: TS-2017-12-05-08-10.rga
  617   Tuesday, December 12, 2017, 08:32 Aaron Schmidt LP-SIS  (Blank)42752-3DonePump down w/ possible outgas

Check achievable vacuum. Watch for spikes on RGA. Silver bolts removed from the chamber. Vented steel screws in.

Tuesday, December 12, 2017, 08:23: Doors open from previous test. (Open for 7 minutes)

Tuesday, December 12, 2017, 08:30: Doors closed. Roughing.

Tuesday, December 12, 2017, 08:50: Turbo pumps on.

Tuesday, December 12, 2017, 08:56: Ion gauge on.


Wednesday, December 13, 2017, 06:46: Check. Vacuum @ 5.44e-07T. RGA Error.

Wednesday, December 13, 2017, 06:49: RGA restarted.

Wednesday, December 13, 2017, 06:52: Water lines opened. Vacuum @ 5.44e-07T

Wednesday, December 13, 2017, 06:54: Power on.

Wednesday, December 13, 2017, 06:56: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.


Friday, December 15, 2017, 13:37: Auto-cooling @ 2A per min


Monday, December 18, 2017, 08:15: Power/source off.


Wednesday, December 20, 2017, 09:07: RGA off.

Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off.

Attachment 1: Empty_Chamber_-_Silver_bolts_removed.docx
Attachment 2: TS-2017-12-12-09-00.rga
Attachment 3: TS-2017-12-13-06-50.rga
  618   Wednesday, December 20, 2017, 09:11 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHoliday Shut Down

Power/sources already off. The water cooling is currently left on.

Wednesday, December 20, 2017, 09:07: RGA off.

Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off.

Wednesday, December 20, 2017, 11:21: Valves closed. Roughing pumps off.

Wednesday, December 20, 2017, 11:22: RGA shut off completely.

  623   Friday, January 26, 2018, 13:59 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 1

Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.

Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.

Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV.

Spark at BIAS 30 kV and 40kV

Friday, January 26, 2018, 14:12: BIAS/EZL/EE @ 40/13/1.5 kV.

Friday, January 26, 2018, 14:15: BIAS/EZL/EE @ 45/13/1.5 kV.

Audible sparks, but none showing on the strip tool.

Friday, January 26, 2018, 14:19: BIAS/EZL/EE @ 45/19/1.5 kV.

Friday, January 26, 2018, 14:22: BIAS/EZL/EE @ 47/22/1.5 kV. Sparks @ 47000 to 47250 V.

Sparks observed on EE feed through in cage.

Friday, January 26, 2018, 14:27: BIAS/EZL/EE @ 50/22/1.7 kV.

Friday, January 26, 2018, 14:39: BIAS/EZL/EE @ 55/23.5/1.8 kV.

Bias controls 55 kV Actual @ 50 kV.

Friday, January 26, 2018, 14:44: Spark free 5 min.

Friday, January 26, 2018, 14:49: Spark free 10 min.

Attachment 1: 2018_HV_test_1.docx
  624   Monday, January 29, 2018, 10:07 Aaron Schmidt LP-SIS  (Blank)42752-3DonePower outage / HV test 2

HV test 2 cancelled.  9:38: BIAS/EZL/EE @ 30/13/1.5 kV

Monday, January 29, 2018, 09:40 (Roughly) Power went out completely

Monday, January 29, 2018, 10:00: Power up TS

Monday, January 29, 2018, 10:07:Turbos on.

Monday, January 29, 2018, 10:11: Ion gauge on Vacuum @ 3.3e-06T

Monday, January 29, 2018, 11:47; Power cycled. PLC and Canbus reset/cfg.

Monday, January 29, 2018, 11:54: Optics & Sources ok/reset.

 

Monday, January 29, 2018, 13:27: BIAS/EZL/EE @ 30 / 13 / 1.5 kV.

Monday, January 29, 2018, 13:30: BIAS/EZL/EE @ 40 / 17 / 2 kV.

Monday, January 29, 2018, 13:33: BIAS/EZL/EE @ 45 / 19.5 / 2.25 kV.

Monday, January 29, 2018, 13:36: BIAS/EZL/EE @ 50 / 21.5 / 2.5 kV.

Monday, January 29, 2018, 13:40: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.

Monday, January 29, 2018, 13:43: BIAS/EZL/EE @ 60 / 26 / 3 kV.

SPARKS*

Monday, January 29, 2018, 13:48: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.

Monday, January 29, 2018, 13:51: BIAS/EZL/EE @ 57.5 / 26 / 2.9 kV.

Sparks

Monday, January 29, 2018, 13:57: BIAS/EZL/EE @ 58 / 27 / 2.95 kV.

Monday, January 29, 2018, 14:03: Holding.

Monday, January 29, 2018, 14:07: BIAS/EZL/EE @ 59 / 28 / 3.1 kV.

Monday, January 29, 2018, 14:14: Spark*

Monday, January 29, 2018, 14:45: Holding

Monday, January 29, 2018, 14:56: BIAS/EZL/EE @ 0. Test Complete

Attachment 1: 2018_HV_test_2.docx
  625   Tuesday, January 30, 2018, 06:51 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 3

Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5

Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Tuesday, January 30, 2018, 06:58: Optics on / set

Tuesday, January 30, 2018, 06:59: IV4 opened.

RGA switched completely off and unplugged.

Tuesday, January 30, 2018, 13:15: BIAS / EZL / EE @ 40 / 17 / 2

Tuesday, January 30, 2018, 13:20: BIAS / EZL / EE @ 50 / 21.8 / 2.5

Tuesday, January 30, 2018, 13:50: Half hour wait. Ok. No sparks.

Tuesday, January 30, 2018, 13:55: BIAS / EZL / EE @ 55 / 24 / 2.8

15 minute wait. No sparks.

Tuesday, January 30, 2018, 14:10: BIAS / EZL / EE @ 57.5 / 27 / 3.1

Tuesday, January 30, 2018, 14:23: BIAS / EZL / EE @ 60 / 28 / 3.1

Tuesday, January 30, 2018, 14:35: No sparks.

Tuesday, January 30, 2018, 15:05: BIAS / EZL / EE @ 0

Tuesday, January 30, 2018, 15:06: Auto-cooling started.


Wednesday, January 31, 2018, 06:59: Power/sources off.

 

Attachment 1: 2018_HV_test_3.docx
  626   Wednesday, January 31, 2018, 09:53 Aaron Schmidt    (Blank)42752-3DoneWire moved.

Wednesday, January 31, 2018, 09:50: A wire (B - F) was too close (Almost touching) to the EZL and had visible sparks during HV tests 1 & 2. The wire was adjusted to sit higher. and away from the EZL

  627   Wednesday, January 31, 2018, 12:58 Aaron Schmidt LP-SIS  (Blank)42752-3In progressHV test 4

Wednesday, January 31, 2018, 12:53: Power/sources on.

Wednesday, January 31, 2018, 12:58: BIAS / EZL / EE @ 40 / 17 / 2

Wednesday, January 31, 2018, 13:02: BIAS / EZL / EE @ 40 / 17 / 2

Wednesday, January 31, 2018, 13:05: BIAS / EZL / EE @ 50 / 22 / 2.5

Wednesday, January 31, 2018, 13:08: BIAS / EZL / EE @ 55 / 24 / 2.8

Wednesday, January 31, 2018, 13:10: BIAS / EZL / EE @ 57.5 / 27 / 3.0

Wednesday, January 31, 2018, 13:14: BIAS / EZL / EE @ 60 / 28 / 3.1

Wednesday, January 31, 2018, 13:34: No Sparks.

Wednesday, January 31, 2018, 14:14: No sparks after one hour.

Wednesday, January 31, 2018, 14:44: Spark free at 1-1/2 hours.

Wednesday, January 31, 2018, 14:45: Bringing down voltage.

Wednesday, January 31, 2018, 14:56: BIAS / EZL / EE @ 0

Wednesday, January 31, 2018, 14:57: Sources off.

Attachment 1: 2018_HV_test_4.docx
  845   Thursday, February 04, 2021, 19:22 Fernando Maldonado LP-SIS   44139-10 44378-2DoneEnergy spread calibration with SIS

See e-log entry: 884:

Thursday, February 04, 2021, 18:45: Roughing

Thursday, February 04, 2021, 19:13: Turbos on.

Thursday, February 04, 2021, 19:22: IG1 on.


AS

Friday, February 05, 2021, 06:20: Waterline FS#5 open. Vacuum ok @ 1.71e-06T.

Friday, February 05, 2021, 06:23:

Friday, February 05, 2021, 06:26: Tried to put 100 - 1000 V on the BIAS. Goes to 0.0 kV - BIAS:RDVOL / 0.029 mA - BIAS:RDCUR, straight to current limit. BIAS is shorted.

Friday, February 05, 2021, 06:32: Power / Sources / Optics off. Ion gauge & Turbo pumps off.

Friday, February 05, 2021, 07:28: Venting.

Friday, February 05, 2021, 08:37: Roughing. Target was re-salted. GE line was close/light touch to (B) line. Adjusted. Waterlines open on FS#5.

Friday, February 05, 2021, 09:06; Turbo pump TP1B on.

Friday, February 05, 2021, 09:14: Turbo pump TP1A on

Friday, February 05, 2021, 09:19: TP1A tripped. Wait on backing pressure.

Friday, February 05, 2021, 09:35: Vacuum Bypass on BV1A to turn on TP1A.

Friday, February 05, 2021, 09:39: TP1A at speed. Ion gauge on. Bypass removed.

Friday, February 05, 2021, 09:55: IG1 off. Bypass used on IG1. EE on, BIAS on.

Friday, February 05, 2021, 09:56: 500 - 1000 V - BIAS:RDVOL / 0.000 mA - BIAS:RDCUR. Ok.

Friday, February 05, 2021, 09:58: BIAS & EE off. Bypass removed. IG1 back on. Initial check ok. Vacuum to go below 1.0e-05T.

Friday, February 05, 2021, 11:37: Power / Sources / Optics on & set. Vacuum @ 6.46e-06T.

Friday, February 05, 2021, 11:42: BIAS / EE / EZL @ 10 / -1.0 / 7.5 kV

Friday, February 05, 2021, 11:50: BIAS / EE / EZL @ 20 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A.

Friday, February 05, 2021, 11:58: BIAS / EE / EZL @ 25 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A. Anode checked up to 100 V & down again. Ok.

Friday, February 05, 2021, 12:06: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A.

Friday, February 05, 2021, 12:14: BIAS / EE / EZL @ 35 / -1.5 / 13.5 kV. TGHT / TBHT @ 10 / 10 A.

Friday, February 05, 2021, 12:24: It charged up and began sparking continuously around 12:23.

Friday, February 05, 2021, 12:33: BIAS / EE / EZL @ 15 / -1.0 / 10 kV. TGHT / TBHT @ 10 / 10 A. The sparks were both clearly audible & visible on the spark gap up top (Image to be included in word doc)

FM

Friday, February 05, 2021, 14:16:   BIAS / EE / EZL @ 30/ -1.5 / 13 kV.  Anode @ 50 V.

Friday, February 05, 2021, 14:18: Auto ramp-up TGHT/TBHT to 580/230 A @ 4A/min

Friday, February 05, 2021, 15:08: Anode shorted, I think the  tube heater is touching the plasma electrode. TGHT/TBHT @ 209/209 A. TBHT voltage= 2.2. At the same time the bias current jump from 0.008 to 0.01.

Friday, February 05, 2021, 15:12: Reducing the TBHT to 190 A 2 V. Bias current linearly reducing with tbht current. The cathode is not current limited anymore. Wondering if the TBHT power supply is causing an electrical backflow or if the ion source is touching the plasma electrode.

Friday, February 05, 2021, 15:16: Auto ramp-up TGHT/TBHT to 580/230 A @  2 A/min

Friday, February 05, 2021, 15:21: The same effect as before at TBHT=223 A. When reducing to 190 A, anode goes up. 

Friday, February 05, 2021, 15:30:  Auto ramp-up TGHT to 580 A @ 4A/min and TBHT to 230 @ 1 A/min. 

Friday, February 05, 2021, 15:55: Sparks, not audible nor visible. I think I saw one on the top part of the water blocks. Lowering bias to 10 kV.

Friday, February 05, 2021, 15:56 : Auto-ramp range to 4A/min on both TGHT and TBHT

Friday, February 05, 2021, 19:23:  almost 2.5 hours without sparks. RPM tests performed. Voltages to zero. Will rise later or tomorrow remotely.

Taped down to 180/500 A on TBHT/TGHT. All voltages to  BIAS / EE / EZL @ 0.000 kV.


Saturday, February 06, 2021, 11:14:   Auto ramp-up TGHT/TBHT to 580/230 A @ 4A/min

Saturday, February 06, 2021, 12:16:    BIAS / EE / EZL @ 30/ 1.5 / 0kV.  

Saturday, February 06, 2021, 12:30: The previous tune is not working anymore. I have to re-tune . EZL now helps to have a better tune, no need for extreme steering

Well well well, after several scans I observed the following:

  • Bias readback changes by 14  V. This doesn't necessarily means this is the absolute value, it could be better or worse.
  • Magnet oscillates around 1 gauss, enough to move the beam to the sides.
  • Different settings on the rpm scans does not yield to different results in the data
  • Intensity variations causes one of the rpms scans to be lower or higher.
  • Total source scans are always mirrored as long as nothing else varies.
  • Separated ion scans varied wildly. No two consecutive scans are the same. Likely a combination of Bias voltage and magnet current ripples.
  • Following Baartman's proceedure on a cherry-picked data set, I estimated an energy spread of 11.75 eV. To be discussed with him

Saturday, February 06, 2021, 20:00 Biases to 0.000 kV

Saturday, February 06, 2021, 20:00 : Auto-cooling TGHT/TBHT  to  400/150 A @ 3 A/min

 Saturday, February 06, 2021, 21:02: On the way down, TBHT 150  A and when TGHT cross 480 A the anode came back to life. Wonder if this could help diagnose deflection on the surface ion source (might be helpful for the P2N)


Sunday, February 07, 2021, 08:26:  Auto ramp-up TGHT/TBHT to 560/210 A @ 2A/min

Sunday, February 07, 2021, 09:18: Anode got current limited again when TGHT/TBHT @ 446/200 A 

Sunday, February 07, 2021, 11:26:  Auto ramp-up TGHT/TBHT to 560/210 A @ 2A/min 

 Sunday, February 07, 2021, 11:31: Once again, the latest tune did not work. I suspect the ion source deformation varied from thermal cycle to thermal cycle. With a crooked beam, the EZL will send the beam off-center and the quad will not compensate that. The double peak observed in the beam size scan indicates that the focusing is not correct.

Sunday, February 07, 2021, 18:41: With Baartman RPM scans, the x axis in in cm, as verified with an emittance scan.

New parameters on the emittance rig for this tune. Offset from 40 to -50. This shifts the phase space in the y axis such that is visible on the plot. 

Even in a different mass, the position scans on the dispersion plan are not reproducible.

Sunday, February 07, 2021, 18:52: Auto-cooling TGHT/TBHT to 400/150 A  @ 6A/min / 3 A/min, respectively.

 Sunday, February 07, 2021, 18:53: Biases to 0.000 kV

I think the fast cool-down rate prevented the TBHTto be able to sustained voltage.

Sunday, February 07, 2021, 19:35: Auto-cooling TGHT/TBHT to 0 A @ 3A/min 

TBHT able to sustain voltage once TBHT=191 A and TGHT=372 A


Monday, February 08, 2021, 07:14: IV4 close

Monday, February 08, 2021, 07:15: IG1 off. Turbos off. 

Attachment 1: ESC_-_Feb_5_Start.docx
  1   Wednesday, June 29, 2011, 15:30 John Wong       Testing Yield station elog

ABC 123 blah blah blah...

  4   Thursday, September 15, 2011, 09:20 Anders Mjos       ISAC TestStand old e-log

link to old e-log

  5   Thursday, September 15, 2011, 13:46 Anders MjosFEBIAD TestHP-FEBIAD    FailedFEBIAD Broken Tube

See attached file for photos of the broken tube 

Attachment 1: FEBIAD_Broken_Tube.pdf
FEBIAD_Broken_Tube.pdf
  9   Friday, September 23, 2011, 15:38 Rick Maharaj       test stand vented

Test stand vented

  10   Friday, September 23, 2011, 16:40 Anders Mjos      Problems/Solutions9-pin connectors swapped on source tray

Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the next FEBIAD target.

  12   Monday, September 26, 2011, 14:56 John Wong      Problems/Solutions9-pin connectors swapped on source tray

Anders Mjos wrote:

Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the next FEBIAD target.

 See attachment#1: 9-pin-connector.jpg 

Attachment 1: 9-pin-connector.jpg
9-pin-connector.jpg
  13   Monday, September 26, 2011, 16:14 Anders Mjos      Problems/SolutionsFixed leak on water line for HS, added Kapton insulation
  • While testing SiC#26 a leak was discovered on the water line to the heat shield. The leak was in the right joint (see attachment). The heat shield water lines were removed from the test stand and repaired in the Machine Shop. 
  • Kapton was added to the FEBIAD coil line to prevent it from shorting to the target heater line (see attachment).
Attachment 1: Water_Leak.pdf
Water_Leak.pdf
Attachment 2: Kapton.pdf
Kapton.pdf