Entry  Monday, May 12, 2014, 14:20, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, Conditioning SiC#30 SiC#30_Conditioning.docx

Monday, May 12, 2014, 14:14 : Roughing

Monday, May 12, 2014, 14:34: Starting turbos

Monday, May 12, 2014, 14:42 : Turbos at speed

Monday, May 12, 2014, 14:44 : Vacuum at  1.7E-5 T


Tuesday, May 13, 2014, 10:51: Opened water for HS circuit. Vacuum stable at 2.2E-7 T. Minor spike to 2.5E-7 T for 10 s.

Tuesday, May 13, 2014, 10:54: Roughing out gas lines.

Tuesday, May 13, 2014, 11:30: Opening SV5 and SV2 to evacuate gas lines completely.

Tuesday, May 13, 2014, 11:58: BIAS to 30kV, EZL to 13 kV. EE to 1.5 kV.

Tuesday, May 13, 2014, 11:59: Opening isolation valve

Tuesday, May 13, 2014, 12:12: Started heating to 450A / 200A TGHT / TBHT.


Target heating stopped at 167 A - likely caused by network problems. Multiple gaps in strip tool. Indicating lost network connection.

Wednesday, May 14, 2014, 10:07: Resuming heating to 450A / 200A TGHT / TBHT (EPICS 170A)

Wednesday, May 14, 2014, 10:12: De-biasing to investigate ANODE/CATHODE BIAS

Switched ON ANODE/CATHODE BIAS PS.

Wednesday, May 14, 2014, 10:22: BIAS to 30kV, EZL to 13 kV. EE to 1.5 kV.

Wednesday, May 14, 2014, 16:07: Continue heating TGHT to 500A

Wednesday, May 14, 2014, 16:33: TGHT at 500A. TBHT at 203 A.


Thursday, May 15, 2014, 14:57: Switched OFF/ON IOC to recover from white-out.

Thursday, May 15, 2014, 15:51: Started heating to 550A / 240A 


COIL to 50A
ANODE to 200V
TGHT to 580A
TBHT to 280A

Friday, May 16, 2014, 11:28  : Opening Ne

Friday, May 16, 2014, 11:56: TBHT to 290 A

Friday, May 16, 2014, 14:12: Started cool down. ANODE/CATHODE Bias requires reconfiguration.


Tuesday, May 20, 2014, 11:10: Ray and co is checking the configuration and troubleshooting the burnt off GND connection. The Test Stand will be configured to CATHODE negative BIAS.

Tuesday, May 20, 2014, 12:35: BIAS, EZL, EE, COIL, ANODE ON.

Tuesday, May 20, 2014, 12:35: Gas lines pumped.

Tuesday, May 20, 2014, 12:35: Auto heating to 240A/500A at 1A/2A /min.

Tuesday, May 20, 2014, 12:44: IV4 opened 

    Reply  Friday, June 13, 2014, 08:43, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, Done, SiC#30 HV and Heaters Conditioning  

Aurelia Laxdal wrote:

HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.

 Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T


Monday, June 16, 2014, 08:26: Venting. Water purged.

Monday, June 16, 2014, 09:00: Target removed

    Reply  Tuesday, June 17, 2014, 15:22, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, SiC#30 HV and Heaters Conditioning  SiC#30_Conditioning_3rd_time.docx

Anders Mjos wrote:

Aurelia Laxdal wrote:

HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.

 Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T


Monday, June 16, 2014, 08:26: Venting. Water purged.

Monday, June 16, 2014, 09:00: Target removed

The target assembly did not pass the megger test between anode and heat shield after the previous conditioning. The AlN insulators were found to have failed during the conditioning. The coil insulation was burnt. AlN insulators and anode ware replaced.

Tuesday, June 17, 2014, 15:22: Roughing

By R.M.

Tuesday, June 17, 2014, 15:52: Turbos Started

Tuesday, June 17, 2014, 15:54: TP1B at speed

Tuesday, June 17, 2014, 15:57: IG1 Turned on  1.92e-05T

Tuesday, June 17, 2014, 15:59: TP1A at speed

Tuesday, June 17, 2014, 15:59: IG1 1.31e-05T


By AM

Wednesday, June 18, 2014, 08:24: Opened HS water circuit. Vacuum stable at 2.2E-7 T.

Wednesday, June 18, 2014, 08:40: Pumping on gas lines.

Wednesday, June 18, 2014, 08:49: Closed pump valve on gas lines.

Wednesday, June 18, 2014, 08:51: Opening TSH:SV5

Wednesday, June 18, 2014, 08:53: Opening TSH:SV2

Wednesday, June 18, 2014, 09:00: BIAS/ EZL / EE 30 / 13 / -1.5 kV

Wednesday, June 18, 2014, 09:04: Starting target heating to 500 / 240 A

Wednesday, June 18, 2014, 09:07: COIL to 50 A. ANODE to 200 V

Wednesday, June 18, 2014, 09:33: OPEN TPS:IV4 

Wednesday, June 18, 2014, 14:05: TBHT at 240 A 2.6 V. TGHT still ramping (403 A)

Wednesday, June 18, 2014, 15:03: TGHT at 500 A 4.5 V 


Thursday, June 19, 2014, 08:51: Ramping to 580 A / 265 A

Thursday, June 19, 2014, 09:37: Continue ramping TBHT to 290A

Thursday, June 19, 2014, 09:44: 8E-8 A on FC0

Thursday, June 19, 2014, 10:52: TBHT at 305A. Running mass scan.

Thursday, June 19, 2014, 11:36: Opening for He.

Thursday, June 19, 2014, 11:46: Opening for Ne.

Thursday, June 19, 2014, 11:54: Lowering TBHT to 300 A

Thursday, June 19, 2014, 13:01: Mass scan. ~1E-10 A Ne current on FC6 with Ne open.

Thursday, June 19, 2014, 15:06: Mass scan up.

Thursday, June 19, 2014, 16:00: Mass scan down.

Thursday, June 19, 2014, 16:49: Started cooling down target.


Friday, June 20, 2014, 08:53: Target de-biased. Turbos off.

Friday, June 20, 2014, 10:23: Venting. Purging water from  HS circuit.

Entry  Wednesday, July 10, 2013, 10:21, Anders Mjos, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Done, Testing SiC#29 CTL Target 

Wednesday, July 10, 2013, 10:20 : Turbos off. Vacuum at 1.3 E-7 T

Wednesday, July 10, 2013, 11:23: Venting chamber 

Wednesday, July 10, 2013, 12:00: Vented

Wednesday, July 10, 2013, 12:38: Roughing

Wednesday, July 10, 2013, 12:54: Pumping on gas lines for 10 min.

Wednesday, July 10, 2013, 12:58: Starting Turbos

Wednesday, July 10, 2013, 13:07 : Both turbos at speed. TP1A timed out one.

Wednesday, July 10, 2013, 13:08 : Vacuum at 1.5E-5 T

 

T/C connectors removed from HV rack. All connections put to ground.


Thursday, July 11, 2013, 08:43: Opened up cooling water supply. Vacuum stable at 2.2E-7 T

Thursday, July 11, 2013, 08:58: Starting ramp up of TGHT and TBHT to 100A and 50A respectively to verify proper function of the new power supply set-up.

Thursday, July 11, 2013, 09:20: TBHT reached 50A. EPICS read back 51.2A / 0.186V. P/S local read back 51A / 0.20V

Thursday, July 11, 2013, 09:44: BIAS 30kV, EE -800V, EZL 13kV

Thursday, July 11, 2013, 09:44: TGHT reached 100A. EPICS read back 100.2A / 0.488V. P/S local read back 99A / 0.46V

Thursday, July 11, 2013, 09:46: IV4 opened

Thursday, July 11, 2013, 09:53: Starting ramp up of TGHT and TBHT to 500A and 200A respectively

Thursday, July 11, 2013, 10:00: Coil and Anode to 50A and 200V respectively

Thursday, July 11, 2013, 14:59: TGHT and TBHT to 500A and 207A EPICS read back. Local read back 500A and 205A.

Thursday, July 11, 2013, 15:03: Opening gas lines into chamber.

Thursday, July 11, 2013, 15:12: Starting ramp up of TGHT and TBHT to 550A and 220A respectively

Thursday, July 11, 2013, 15:21: Some current on FC0 at TBHT 210A

Thursday, July 11, 2013, 15:25: He leak valve at 5.5

Thursday, July 11, 2013, 16:07: Will leave target in current condition over night and continue the test tomorrow.


Friday, July 12, 2013, 08:25: Target ran without interruptions overnight. Started magnet scan. Masscorr constants had to be reentered after the reboot of EPICS.

Friday, July 12, 2013, 10:30: TMS:Q1 and TMS:Q6 found off. Restarted.

Friday, July 12, 2013, 10:32: Starting TGHT ramp to 580A. Increased EE to -1200V

Friday, July 12, 2013, 10:47: Reached 580A. EPICS 581.7A / 5.724V. PS local 580A / 5.69V.

Friday, July 12, 2013, 10:51: Starting manual ramp of TBHT.

Friday, July 12, 2013, 11:14: Autoramping TBHT to 250A

Friday, July 12, 2013, 11:23: Reached 250A. EPICS 259.6A / 1.934V. PS local  256A / 1.93V

Friday, July 12, 2013, 11:35: Manual ramp. ANODE current @ 2mA seen at TBHT @ 262A.

Friday, July 12, 2013, 11:41: BIAS spark seen on current and vacuum.

Friday, July 12, 2013, 12:09: TBHT:RDCUR  at 269A

Friday, July 12, 2013, 13:18:TBHT:RDCUR  at 280A.. PS local 277A.

Friday, July 12, 2013, 13:21: EE to -1500V / 510uA

Friday, July 12, 2013, 13:30: Ne leak opened.

Friday, July 12, 2013, 14:12: Mass scan started.

Friday, July 12, 2013, 15:04: A thumb sound and flash was seen. Confirmed with AAPS operator. TMS:SX3 went off. TMS:MB1 does not respond to current adjustments.

Friday, July 12, 2013, 15:53: The source will be left in it's present state over the weekend.


Saturday, July 13, 2013, 07:10: FC0 Bias found off. Restarted. Could be related to sparking. 


No further issues over the weekend.

Monday, July 15, 2013, 09:10: Starting mass scan.

Monday, July 15, 2013, 10:39: Magnet at Ne (20 amu). FC6 1.3E-10. Ne gas off: FC6 < 1E-11

Monday, July 15, 2013, 10:45: Ne gas on.

Monday, July 15, 2013, 10:50: EE to 2kV. EE:RDCUR at 684 uA.

Monday, July 15, 2013, 13:27: Manually increasing TBHT to 290A. Local 287A.

Monday, July 15, 2013, 15:07: Cooling down target.

Monday, July 15, 2013, 15:26: COIL off. Gases off (earlier). ANODE off.

Monday, July 15, 2013, 15:31: IV4 closed.


Tuesday, July 16, 2013, 08:21: BIAS, EZL and EE to zero.

Tuesday, July 16, 2013, 08:24: Turbos off. Vacuum at 1.3E-7 T.

Tuesday, July 16, 2013, 15:12: Venting

Tuesday, July 16, 2013, 15:38: Target removed.

Entry  Wednesday, May 29, 2013, 12:10, Anders Mjos, CTL FEBIAD, HP-FEBIAD, , , 38481-5, , Done, CTL Test Photo_2013-06-13_10_33_42_AM.jpg

Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger

Wednesday, May 29, 2013, 14:40: Temp logger installed

CH1 COIL
CH2 CTL Block

Wednesday, May 29, 2013, 14:51: Opening gas lines

Temperatures [deg C]
COIL: 190
CTL:   44

Wednesday, May 29, 2013, 15:31: Coil at 50A

Temperatures [deg C]
COIL: 212
CTL:   45


Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A

Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A

Thursday, May 30, 2013, 10:03

Temperatures [deg C]
COIL: 227
CTL:   48

Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.


Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.


Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber

Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.


Thursday, June 06, 2013, 13:23:

Temperatures [deg C]
COIL: 227
CTL:   48

Thursday, June 06, 2013, 16:45: TBHT increased ti 290A

Temperatures [deg C]
COIL: 230
CTL:   50


Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.

Temperatures [deg C]
COIL: 227
CTL:   48

Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.

Friday, June 07, 2013, 16:24: TBHT at 296A

Temperatures [deg C]
COIL: 237
CTL:   50


Monday, June 10, 2013, 08:19 

Temperatures [deg C]
COIL: 232
CTL:   49

Monday, June 10, 2013, 16:55: COIL at 60A

Temperatures [deg C]
COIL: 244
CTL:   49


Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A

Temperatures [deg C]
COIL: 242
CTL:   49

Tuesday, June 11, 2013, 11:02: COIL at 70A

Temperatures [deg C]
COIL: 256
CTL:   49

Tuesday, June 11, 2013, 15:49: COIL at 80A

Temperatures [deg C]
COIL: 272
CTL:   49


Wednesday, June 12, 2013, 08:19:
 Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.


Thursday, June 13, 2013, 08:37: Turbos stopped.

Thursday, June 13, 2013, 09:20: Water lines purged.

Thursday, June 13, 2013, 09:41: Venting

Thursday, June 13, 2013, 10:19: Target removed

Entry  Friday, September 23, 2011, 16:42, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, Target ready to be heated 

Friday, September 23, 2011, 16:4: Target installed and roughing started.

Friday, September 23, 2011, 17:12: Started turbo pumps. 

Monday, September 26, 2011, 09:00: Opened up water flow. Vacuum rose from 3e-6 to 3e-5 torr in 30 s. Closed water flow.

Monday, September 26, 2011, 09:00: Venting for leak check.

Monday, September 26, 2011, 10:20: Pressurized water lines with 120 PSI He. Leak detected on right water line connection to heat shield.

Monday, September 26, 2011, 12:00: Leak repaired. Pumping down. Kapton added on target  heater cooling line to prevent short with cooling line for FEBIAD coil.

Monday, September 26, 2011, 12:47: Started turbo pumps. 

Monday, September 26, 2011, 15:45: Opened up water flow. Vacuum stable at 3.5e-6 torr.Target ready to be heated.

Entry  Wednesday, September 28, 2011, 16:33, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, HV conditioning 

Started the HV conditioning: TSG:BIAS=30kV

Entry  Thursday, September 29, 2011, 09:27, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, Heaters conditioning 

Started the heaters conditioning: TGHT up to 580A and TBHT up to 230A.

Entry  Friday, September 30, 2011, 18:03, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Finished testing SiC#26 at the Test Stand 

Today, did a did a mass scan: plotdump-local-clean.txt Sep30 11 12-20-08.txt

Optimized a bit the tune with Friedhelm, then started the Target Cooldown.

Entry  Monday, October 03, 2011, 10:53, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target is ready to be removed.  

Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.

    Reply  Monday, October 03, 2011, 13:56, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Venting 

Aurelia Laxdal wrote:

Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.

 Monday, October 03, 2011, 13:45: Venting.

    Reply  Monday, October 03, 2011, 14:46, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target stored under vacuum 

Anders Mjos wrote:

Aurelia Laxdal wrote:

Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.

 Monday, October 03, 2011, 13:45: Venting.

 Monday, October 03, 2011, 14:45

  • Target was visually  inspected and found to be ready to go online.
  • No burn marks found on the 9-pin connectors.
  • Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
    Reply  Wednesday, October 12, 2011, 13:14, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target removed 

Anders Mjos wrote:

Anders Mjos wrote:

Aurelia Laxdal wrote:

Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.

 Monday, October 03, 2011, 13:45: Venting.

 Monday, October 03, 2011, 14:45

  • Target was visually  inspected and found to be ready to go online.
  • No burn marks found on the 9-pin connectors.
  • Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected

 Wednesday, October 12, 2011, 13:15: Venting

Wednesday, October 12, 2011, 14:15: Target brought back to lab for inspection and final check.

Entry  Monday, July 06, 2020, 05:28, Fernando Maldonado, Test FEBIAD , HP-FEBIAD, , , 38295-8 , 42752-5 , Done, FEBIAD development part 3/3 

Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

 

The plan for today Monday, July 06, 2020 is:
  1. Ramp up TGHT/TBH to 580/315 A.
  2. Anode sweep
  3. Mass scan without gas.
  4. Coil sweep without gas
  5. Gases in.
  6. Mass scan with gases
  7. Coil sweep with gasses
  8. Efficiency measurements at highest and lowest FC6 current

COVID-19 protocol: buddy is Marla Cervantes

New idea: Screenshot e-log on the ISAC TS team notebook: 20-07-06 FEBIAD development part 3  (Web view)


Monday, July 06, 2020, 05:27: Auto-ramping TGHT/TBHT to 580/315 @ 2 A/min.

 Monday, July 06, 2020, 14:2: IV4 open.

Monday, July 06, 2020, 14:41: Anode sweep completed. No anode current registered.

Monday, July 06, 2020, 14:42:  HV spark. Anode current now show something. 13.431 mA. The source current however did not change after the spark.

Monday, July 06, 2020, 15:08: Anode sweep completed.

Monday, July 06, 2020, 15:19: IG1=2.57e-6T. 

Monday, July 06, 2020, 15:43: Mass scan completed.

Monday, July 06, 2020, 16:02: Coil sweep completed.

Monday, July 06, 2020, 16:04: FC6=8.40e-11A. IG1=2.59e-6T.

Monday, July 06, 2020, 16:07: SV1 closed. SV3 and SV4 open/closed x5.

Monday, July 06, 2020, 16:10: SV3 and SV4 open.

Monday, July 06, 2020, 16:12: SV1 closed. SV5 open/closed x5.

Monday, July 06, 2020, 16:13: SV5 open. No trip!!!

Monday, July 06, 2020, 16:25: FC6=1.16e-10A. IG1=2.74e-6T.

Monday, July 06, 2020, 16:33: Closing gas lines to prevent more leakage.

Tomorrow I will move to mass 40, to see if the ionization changes with the small gas load.

Monday, July 06, 2020, 16:36: Done for the day.


The plan for today Tuesday, July 07, 2020 is:
  1. Gases in.
  2. Mass scan with gases
  3. Coil sweep with gasses
  4. Efficiency measurements at highest and lowest FC6 current

Tuesday, July 07, 2020, 13:38:FC6=4.46e-11A. IG1=2.41e-6T.

SV3 and SV4 open/closed x5.  SV1 open.

Tuesday, July 07, 2020, 13:40: SV3 and SV4 open.

Tuesday, July 07, 2020, 13:41: SV1 closed. SV5 open/closed x5.

SV5 open. No trip!!!

Tuesday, July 07, 2020, 13:57: FC6=8.46e-11A. IG1=2.59e-6T.

Tuesday, July 07, 2020, 14:15: Mass scan completed.

Tuesday, July 07, 2020, 14:22: mass=39.82. A slight bump between the potassiums 38 and 41.

Tuesday, July 07, 2020, 14:38: Coil sweep completed.

Coil=0A. FC6=1.18e-11A. IG1=2.59e-6T.

Tuesday, July 07, 2020, 14:39: SV3 closed.

Tuesday, July 07, 2020, 14:47: FC6=1.26e-11A. IG1=2.59e-6T.

Tuesday, July 07, 2020, 14:48: SV4 closed.

Tuesday, July 07, 2020, 14:59: 1.15e-11A. IG1=2.41e-6T.

Tuesday, July 07, 2020, 15:00: SV5 closed.

Tuesday, July 07, 2020, 15:07: FC6=1.15e-11A. IG1=2.41e-6T.

Tuesday, July 07, 2020, 15:08: SV3 and SV4 open/closed x5. SV1 open.

Tuesday, July 07, 2020, 15:09: SV3 and SV4 open. SV1 closed.

Tuesday, July 07, 2020, 15:10:  SV5 open/closed x5. SV5 open. No trip!!!

Tuesday, July 07, 2020, 15:2: FC6=1.26e-11A. IG1=2.59e-6T.

Tuesday, July 07, 2020, 15:32: SV3 closed.

Tuesday, July 07, 2020, 15:44: FC6=1.4e-11A. IG1=2.57e-6T

Tuesday, July 07, 2020, 15:44: SV4 closed.

Tuesday, July 07, 2020, 16:01: FC6=1.15e-11A. IG1=2.39e-6T.

Tuesday, July 07, 2020, 16:01: SV5 closed.

 Tuesday, July 07, 2020, 16:31: Coil sweep with no gas completed.

Tuesday, July 07, 2020, 16:52: Mass scan completed.

Tuesday, July 07, 2020, 16:52: Done for the day.


The plan for today Wednesday, July 08, 2020 is:
  1. Ramp up TBHT to 580/320 A.
  2. Anode sweep
  3. Mass scan without gas.
  4. Coil sweep without gas
  5. Gases in.
  6. Mass scan with gases
  7. Coil sweep with gasses
  8. Efficiency measurements at highest FC6 current
  9. Coil sweep without gas

Wednesday, July 08, 2020, 15:00: IG1=2.41e-6T.

 Wednesday, July 08, 2020, 15:29: Auto-ramping TBHT to 320A @ 2A/min.

Wednesday, July 08, 2020, 15:54: Anode sweep completed.

Wednesday, July 08, 2020, 16:33: Mass scan completed

Wednesday, July 08, 2020, 16:56: Coil completed.

Wednesday, July 08, 2020, 16:57. IG1=2.59e-6T. FC6=8.63e-11A.

Wednesday, July 08, 2020, 16:58: SV3 and SV4 open/closed x5. SV1 open.

Wednesday, July 08, 2020, 16:59: SV3 and SV4 open. SV1 closed.

Wednesday, July 08, 2020, 17:01: SV5 open/closed x5. SV5 open. No trip!!!

Wednesday, July 08, 2020, 17:12: FC6=9.20e-12A. IG1=2.65e-6T.

Wednesday, July 08, 2020, 17:44: Mass scan completed.

FC6=8.61e-12A. IG1=2.65e-6T.

Wednesday, July 08, 2020, 18:14: Coil sweep completed.

FC6=5.52e-11A. IG1=2.68e-6T.

Wednesday, July 08, 2020, 18:19: SV3 closed.

Wednesday, July 08, 2020, 18:25: FC6=6.8e-11A. IG1=2.65e-6T

Wednesday, July 08, 2020, 18:25: SV4 closed.

Wednesday, July 08, 2020, 18:39 : FC6=1.70e-11A. IG1=2.59e-6T.

Wednesday, July 08, 2020, 18:40 : SV5 closed.

Wednesday, July 08, 2020, 19:08: FC6=1.32e-11A. IG1=2.59e-6T.

Wednesday, July 08, 2020, 19:12: Sudden TBHT current increase of approx 2A. TBHT voltage seem to have droped a little 0.02V.

Wednesday, July 08, 2020, 19:14: Coil=0A. I'll wait until IG1 reading stabilizes.

Wednesday, July 08, 2020, 19:31: FC6=8.09e-12. IG1=2.48e-6T.

Wednesday, July 08, 2020, 19:31: TBHT returned to values  pior to sudden jump.

Wednesday, July 08, 2020, 19:58: Coil sweep with no gas completed.

Wednesday, July 08, 2020, 19:58: Done for the day.


The plan for today Thursday, July 09,2020 is:
  1. Ramp down TBHT to 580/290 A.
  2. Anode sweep
  3. Coil sweep without gas
  4. Gases in.
  5. Coil sweep with gases
  6. Ramp down test stand

Thursday, July 09, 2020, 09:53: Manually tap down TBHT to 290A @ ~~2A/min 

Thursday, July 09, 2020, 11:02: Anode sweep completed.

Thursday, July 09, 2020, 13:15: Coil=0A. IG1=2.24e-6T. FC0=2.48e-10A. FC6=7.43e-12A.

Thursday, July 09, 2020, 14:15: SV3 and SV4 open/closed x5. SV1 open.

Thursday, July 09, 2020, 14:16: SV3 and SV4 open. SV1 closed.

Thursday, July 09, 2020, 14:17 : SV5 open/closed x5. SV5 open. No trip!!!

Thursday, July 09, 2020, 14:31: FC6=3.03e-11A. IG1=2.50e-6T.

Thursday, July 09, 2020, 14:54: Coil sweep completed.

Thursday, July 09, 2020, 15:16: Anode=0 V.

Thursday, July 09, 2020, 15:16: SV3, SV4, SV5 closed

Thursday, July 09, 2020, 15:18: IV4 closed. timeout, reset it

Thursday, July 09, 2020, 15:20: BIAS/EZL/EE 0 kV.

Thursday, July 09, 2020, 15:21: Auto-cooling 2 A/min

Thursday, July 09, 2020, 15:25: Done for the day.


Monday, July 13, 2020, 07:01: Ion gauge & Turbo pumps off. Noted HV cage is already removed & PS locked out.

Entry  Tuesday, June 30, 2020, 21:59, Fernando Maldonado, Test FEBIAD, HP-FEBIAD, , , 38295-8 , 42752-5 , Done, FEBIAD development part 2/3 

 Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

 

The plan for today Wednesday, July 01, 2020 () is:
  1. Coil sweep with gas lines opened.
  2. Coil sweep with gas lines closed
  3. Coil sweep with gas lines opened.
  4. Efficiency measurements at highest and lowest FC6 signal
  5. Mass scan.

COVID-19 protocol: buddy is Marla Cervantes

New idea: Screenshot e-log on the ISAC TS team notebook: 20-07-01 FEBIAD development part 2  (Web view)


Wednesday, July 01, 2020, 11:50: FC6=6.89e-12A. IG1=2.76e-6T.

FC6 has dropped 60% and the vacuum 15% with the respect to the last set of measurements.

Maybe the mass is not Ar+ but K? Or the decrease in pressure has this large correlation to FC6 magnitude.

Wednesday, July 01, 2020, 12:41: Coil sweep up and down completed.

Wednesday, July 01, 2020, 12:47: SV3, SV4, and SV5 close

IG1=2.59e-6T. The gas bottles are definitely running out, as there is no much change in pressure whether they are opened or closed

Wednesday, July 01, 2020, 13:15: Coil sweep completed.

Wednesday, July 01, 2020, 13:22: FC6 and IG1 increasing. Probably due to the coil still at 90A. reducing coil current.

Wednesday, July 01, 2020, 13:29: SV1 open. SV3 open/closed x5. SV4 open/closed x5.

Wednesday, July 01, 2020, 13:31: SV3 and SV4 open.

Wednesday, July 01, 2020, 13:32: SV1 closed. SV5 open/closed x5.

Wednesday, July 01, 2020, 13:33 SV5 open. No trip!!!

Wednesday, July 01, 2020, 14:30: Coil=0A.

Wednesday, July 01, 2020, 14:34 : SV3 closed.

Wednesday, July 01, 2020, 14:37:SV4 closed.

Coffee break.

Wednesday, July 01, 2020, 14:54: FC6~~9.76E-13A. IG1= 2.44e-6T

Wednesday, July 01, 2020, 15:11:SV1 open.  SV3 open/closed x5. SV4 open/closed x5.

Wednesday, July 01, 2020, 15:13:  SV3 and SV4 open.

Wednesday, July 01, 2020, 15:30: SV1 closed. SV5 open/closed x5.

Wednesday, July 01, 2020, 15:30: SV5 open. No trip!!!

Wednesday, July 01, 2020, 15:52: Coil=90A. FC6=1.41e-11A . IG1=2.68e-6T.

Wednesday, July 01, 2020, 15:57: FC6=1.16e-11A. IG1=2.68E-6T.

Wednesday, July 01, 2020, 15:58: SV3 closed.

Wednesday, July 01, 2020, 16:03: SV4 closed.

Wednesday, July 01, 2020, 16:07: 4.95e-12A. IG1=2.77e-6T.

Pressure increasing.

Wednesday, July 01, 2020, 16:14:SV1 open. FC6 decreasing momentarily, now increasing again due to the pressure increase.

Wednesday, July 01, 2020, 16:15: SV3 open/closed x5. SV4 open/closed x5.

IG1=3.1e-6T. FC6=6.00e-12A. Seems table now.

Wednesday, July 01, 2020, 16:17: SV3 and SV4 open.

Wednesday, July 01, 2020, 16:20: SV1 closed. SV5 open/closed x5.

Wednesday, July 01, 2020, 16:20: SV5 open. No trip!!!

 Wednesday, July 01, 2020, 16:44: FC6=1.12e-11A. IG1=3.14e-6T.

Wednesday, July 01, 2020, 17:40: Mass scan completed. Peaks are really bad resolved.

Wednesday, July 01, 2020, 17:43;FC0 in. Coil=0A.

Wednesday, July 01, 2020, 17:43: Done for the day


The plan for today Thursday, July 02, 2020 is:
  1. Increase cathode current to 310A.
  2. Anode voltage sweep.
  3. Mass scan at nominal values.
  4. Coil sweep with gases
  5. Efficiency measurement at highest coil current.
  6. Coil sweep without gas.
  7. Mass scan without gas.

 Thursday, July 02, 2020, 08:03: IG1=2.68e-6T. Vacuum decreased overnight, reading on FC0 decreased as well.

Thursday, July 02, 2020, 08:11: Auto-ramp TBHT to 310A @ 2A/min 

 Thursday, July 02, 2020, 09:15: FC0 increasing

Thursday, July 02, 2020, 10:30: FC0 seems to be stable now on 5.51e-9A. 

Thursday, July 02, 2020, 11:10: Mass scan completed.

 Thursday, July 02, 2020, 11:26: Mass=40.

Thursday, July 02, 2020, 13:47: Coil sweep completed.

Thursday, July 02, 2020, 13:48: Coil=90A. FC6=1.35e-10A. IG1=2.76e-6T.

Thursday, July 02, 2020, 13:49: SV3 closed.

Thursday, July 02, 2020, 13:52: SV4 closed.

Thursday, July 02, 2020, 14:00: SV5 closed.

Thursday, July 02, 2020, 14:02:  FC6=5.80e-11A. IG1=2.59e-6T.

Thursday, July 02, 2020, 14:08 : SV1 open.  SV3 open/closed x5. SV4 open/closed x5.

Thursday, July 02, 2020, 14:09:  SV3 and SV4 open.

Thursday, July 02, 2020, 14:11: SV1 closed. SV5 open/closed x5.

Thursday, July 02, 2020, 14:11: SV5 open. No trip!!!

Thursday, July 02, 2020, 14:30: FC6=1.40e-10A. IG1=2.96e-6T.

Thursday, July 02, 2020, 14:32: SV3 closed.

Thursday, July 02, 2020, 14:35 : SV4 closed.

Thursday, July 02, 2020, 14:50 : SV5 closed.

Thursday, July 02, 2020, 15:28:  FC6=3.34e-11A. IG1=2.59e-6T.

Thursday, July 02, 2020, 16:05: Coil sweep without gases finished.

 Thursday, July 02, 2020, 16:35: Mass scan finished.

Thursday, July 02, 2020, 16:51: Coil=90A.

Thursday, July 02, 2020, 17:07: Mass scan completed.

Thursday, July 02, 2020, 17:07 : SV1 open.  SV3 open/closed x5. SV4 open/closed x5.

Thursday, July 02, 2020, 17:09:  SV3 and SV4 open.

Thursday, July 02, 2020, 17:10: SV1 closed. SV5 open/closed x5.

The mini-pump line was open for a moment while SV5 was opened, there was no trip but this might have added air into the system.

Thursday, July 02, 2020, 17:13: SV5 open. No trip!!!

Thursday, July 02, 2020, 17:21: FC6=4.10e-11A. IG1=2.76e-6T.

Thursday, July 02, 2020, 17:38: Mass scan completed.

Thursday, July 02, 2020, 17:40: Coil=0A.

Thursday, July 02, 2020, 17:56: Mass scan finished.

Thursday, July 02, 2020, 17:57: Done for the day.


The plan for today Friday, July 03, 2020 is:
  1. Emittance scans at difference coil values.

Friday, July 03, 2020, 11:45: Coil=0. Mass=40u

Friday, July 03, 2020, 11:45: FC6=4.12e-11A. IG1=2.72e-6T.

Friday, July 03, 2020, 12:13: Coil=0. Mass=28u. FC6=7.88e-10A. IG1=2.74e-6T.

 Friday, July 03, 2020, 12:25: Test Stand tripped and the lights around flicker. EPICS whiteout. Even turbos shut off.

Friday, July 03, 2020, 12:27: Called control room and they told that there were a couple of power bumps.

Friday, July 03, 2020, 12:41: EPICS restarted but still whiteout problem similar to e-log 702. Likely to submit a faulty report

Friday, July 03, 2020, 12:57: PLC restarted, EPICS workings.

Friday, July 03, 2020, 12:58: Turbos at speed.

Friday, July 03, 2020, 13:25: Source/Optics on.

Friday, July 03, 2020, 13:36: BIAS/EZL/EE @ 30/13/1.5 kV.

Friday, July 03, 2020, 13:39: IG1=2.15e-6T.

Friday, July 03, 2020, 13:41: Auto-ramping TGHT/TBHT to 400/200A @ 2A/min for the weekend.

Friday, July 03, 2020, 13:44: Done for the day. To continue on Monday.

 

Entry  Monday, June 22, 2020, 07:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Test FEBIAD (Fernando) FEBIAD_Testing_-_June_22_-_23.docxER-580-280-30kV-m28.txt

Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

Monday, June 22, 2020, 08:45: Roughing.

Monday, June 22, 2020, 09:17: Turbo pumps on.

Monday, June 22, 2020, 09:22: Ion gauge on.


Tuesday, June 23, 2020, 07:37: Waterlines opened. Vacuum ok @ 1.60e-06T. Power / Sources on.

Tuesday, June 23, 2020, 07:45: Turned on "mini-pump" Open SV1.

Tuesday, June 23, 2020, 08:01: Open SV3 & SV4. (NOTE* Do not Open SV2).

Tuesday, June 23, 2020, 08:14: Close SV1. Turn off "Mini pump". Slowly open and close SV5. Unplug mini-pump.

Open w/ SV3 & SV4.

Tuesday, June 23, 2020, 08:16: SV5 left open w/ SV3 & SV4. Vacuum Stabilizing @ 2.32e-06T & dropping.

Tuesday, June 23, 2020, 08:20: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min. Coil @ 20 A. IV4 open

Tuesday, June 23, 2020, 08:28: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 50 V.

Tuesday, June 23, 2020, 08:29: Optics on.

Tuesday, June 23, 2020, 09:59: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.

Tuesday, June 23, 2020, 12:59: Coil @ 50 A. Anode @ 100 vV. Vacuum @ 3.71e-06T

Tuesday, June 23, 2020, 13:10: Auto-ramping TBHT to 280 A @ 2 A per min.

Tuesday, June 23, 2020, 13:36: Mass, wire, & Emittance scans taken.

 

 

 

Entry  Thursday, June 25, 2020, 08:57, Fernando Maldonado, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, Done, FEBIAD development part 1/3 

 Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

 

The plan for today Thursday, June 25, 2020 is:
  1. Optimize (tune) the beam to FC0 and then to FC6.
  2. Compensate beam energy by substracting the value of anode voltage to the high voltage. Thursday, June 25, 2020, 16:07: FEBIAD is on cathode bias
  3. Perform an efficiency measurement to know the correct work of the mini pump and also the time needed for 1 measurement.
  4. Perform at least 3 efficiency measurements of the same configuration as a sanity check on the reproducibility of the measurements.

The system is prone to trip if the build-up pressure for the gas lines is higher than 7e-6T.  I will try to wait as long as reasonably possible to make sure the gas lines are pumped to good vacuum levels.

COVID-19 protocol: buddy is Marla Cervantes

New idea: Screenshot e-log on the ISAC TS team notebook: 20-06-26 FEBIAD development day  (Web view)


Thursday, June 25, 2020, 08:38:  TGHT / TBHT @ 580 / 280. Coil @ 0A. Vacuum @ 3.71e-06T. BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V.

Thursday, June 25, 2020, 10:34: TP6 tripped. Closed IV4 closed and reset it. TP6 on

Thursday, June 25, 2020, 10:41:IV4 open


Thursday, June 25, 2020, 10:54: Optimizing beam to FC0 with current tune.

Thursday, June 25, 2020, 12:19: New values for TPS:Q1,Q2,Q3,Q4. Better beam shape on RMP0A and 0B

Thursday, June 25, 2020, 12:33: I think there is something wrong with this  FEBIAD as the mass scan does not show any peaks.

I've noticed the word document from Aaron, and he observed peaks likely from surface ionized species. Furthermore there is no anode current readback on epics nor on the power supply.

Possbile culprits. The anode is not well attached to the 9-pin. The cathode temperature is extremely low and there are no electron-impact ionized species.

 Thursday, June 25, 2020, 12:52: Power supply is on cathode bias mode as well as all the service cap wiring.

Thursday, June 25, 2020, 13:03:  Back to old tunes. Mass scan still showing only surfaced ionized species.

 Thursday, June 25, 2020, 14:30:  Mass scan for 0V finished. Peaks at 38 and 28 u. 38 is Potassium, but 28 is odd, closest surface ionized species might be Al27 with an ionization potential of about 5.8 eV.

Thursday, June 25, 2020, 15:20 : Mass scan for 100V finished. Peaks still at 38 and 28 but with different intensities. Now there are features  what seem to be 18 and 14. Water and N respectively.

Thursday, June 25, 2020, 15:03: Manually tap TBHT to 290 A.

Thursday, June 25, 2020, 15:31: FC6 signal increased. Anode leakage current still showing 0.0 mA.

Thursday, June 25, 2020, 15:35: Manually tap TBHT to 295 A

Thursday, June 25, 2020, 15:58: Mass scan completed. More peaks showed up.

Thursday, June 25, 2020, 15:35: Manually tap TBHT to 300A. Anode leakage current still showing 0.0 mA.

Thursday, June 25, 2020, 16:30: Manually tap TBHT to 305A. Anode leakage current still showing 0.0 mA.

Increasing Anode to 500 V, now there is a reading of 1.2mA. However, there were sparks on the high voltage so this current might be a leakage current from the high voltage.

Thursday, June 25, 2020, 16:34: Lowering to 300A to run a mass scan.

Thursday, June 25, 2020, 16:59: Similar mass spectrum, the anode current is meaningless.

Thursday, June 25, 2020, 17:00: Mass 28 will be used for efficiency measurements.

Thursday, June 25, 2020, 17:15: SV3 closed.

Thursday, June 25, 2020, 17:20: SV4 closed.

Thursday, June 25, 2020, 17:38: SV5 closed.

Thursday, June 25, 2020, 17:39: SV1 opened (mini pump)

Thursday, June 25, 2020, 17:41: Opening and closing SV3 and SV4.

Thursday, June 25, 2020, 17:45: Opening SV5. System tripped.

Thursday, June 25, 2020, 17:51: I will open the cage  to see if the mini pump is on.

Thursday, June 25, 2020, 17:58: The mini-pump was off and unplug. Now connected and running.

 Thursday, June 25, 2020, 18:00: SV1 open.

Thursday, June 25, 2020, 18:10: SV1 closed

Thursday, June 25, 2020, 18:10: SV5 open. Negligible response on IG1.

Thursday, June 25, 2020, 18:13: SV5 off. SV3 and SV4 open.

Thursday, June 25, 2020, 18:14: SV1 open.

Thursday, June 25, 2020, 18:17: SV1 closed.

Thursday, June 25, 2020, 18:17: SV5 open/close/open. Maximum vacuum 6e-6T. This is very closed to the hard-coded interlock. Everything is off, so it will be better to have the vacuum response at least near 4 or 5 e-6T.

Thursday, June 25, 2020, 18:26: SV3 closed.

Thursday, June 25, 2020, 18:31: SV4 closed.

Thursday, June 25, 2020, 18:41: SV5 closed. SV1 open. Wait 15 min

Thursday, June 25, 2020, 19:02: Vacuum response 5e-6.

Thursday, June 25, 2020, 19:02: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.

 


 

 The plan for today Friday, June 26, 2020 is:

  1. Ramp up high voltage to operation values
  2. Mass scan at nominal values
  3. Send m=28 beam to FC6
  4. Perform an efficiency measurement to know the correct work of the mini pump and also the time needed for 1 measurement.
  5. Perform at least 3 efficiency measurements of the same configuration as a sanity check on the reproducibility of the measurements.

 

Friday, June 26, 2020, 11:31: BIAS/EZL/EE @ 30/13/1.5 kV. Anode @ 150 V

Friday, June 26, 2020, 11:58: Mass scan completed.

 Friday, June 26, 2020, 12:0: Magnet set to m=28. FC9=1.17e-9A. IG1=3.42e-6T

Friday, June 26, 2020, 12:17: SV3 closed.

Friday, June 26, 2020, 12:24: No effect on FC6 reading.

Friday, June 26, 2020, 12:24: SV4 closed.

Friday, June 26, 2020, 12:35: FC6=5.5e-10T and seems to  flatten.

Friday, June 26, 2020, 12:44: FC6=5.33e-10.

Friday, June 26, 2020, 12:45: SV5 closed. FC6=5.18e-10 and decreasing.

SV5 closes the gas line segment to the ion source. The response on the ion current indicates that once the leakage lines are closed, there is still some gas in the lines causing the slow decrease on ion current.

There is approximately a factor of 2 increase for m=28 when the argon is used.

Friday, June 26, 2020, 12:52: SV1 on.

Friday, June 26, 2020, 12:52: SV3 open/closed x5

Friday, June 26, 2020, 12:53: SV4 open/closed x5

Friday, June 26, 2020, 12:54: SV3 and SV4 opened.

Friday, June 26, 2020, 12:56: SV1 closed

Friday, June 26, 2020, 12:57: SV1 opened

Friday, June 26, 2020, 12:59 SV1 closed. SV5 open/closed x5

Friday, June 26, 2020, 13:00: SV5 opened.  No trip!!!

Ion current increases when the valve is open. This indicated the build up pressure being release into the ion source. Max FC6=4.17e-9 A. Now decreasing.

Friday, June 26, 2020, 13:07: FC6 reading and IG1 reading approaching values previous to efficiency measurement.

Friday, June 26, 2020, 13:13: FC6=1.17e-9A. IG1=3.47e-6.

Total time for 1 efficiency measurement 50 minutes. The largest wait occurs for the current to stabilize.

Approximately 30 minutes when closing the valves, 15 minutes when opening them, and 10 minutes for roughing the lines.

Friday, June 26, 2020, 13:30: Same measurement for (my) sanity check. FC6=1.16e-9. IG1=3.51e-6T

Friday, June 26, 2020, 13:30: SV3 closed.

Friday, June 26, 2020, 13:35: SV4 closed.

Friday, June 26, 2020, 13:50: SV5 closed.

Friday, June 26, 2020, 13:51: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Friday, June 26, 2020, 13:53: SV3 and SV4 opened.

Friday, June 26, 2020, 13:57: FC6=4.87e-10A. IG1=3.38e-6T.

Friday, June 26, 2020, 13:59: SV1 closed. SV5 open/closed x5.

Friday, June 26, 2020, 14:00: SV5 open. No trip!!!

Friday, June 26, 2020, 14:00: FC6=2.9e-9A. IG1=4.1e-6T. and decreasing.

Friday, June 26, 2020, 14:14: FC6=1.16e-9. IG1=3.56e-6T

Total time for eff measurement=45 minutes

Friday, June 26, 2020, 14:20: Last efficiency measurement for these values. Then lunch break.

Friday, June 26, 2020, 14:23: SV3 closed.

Friday, June 26, 2020, 14:29: SV4 closed.

 Friday, June 26, 2020, 14:42: SV5 closed.

Friday, June 26, 2020, 14:43: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Friday, June 26, 2020, 14:44: SV3 and SV4 opened

Friday, June 26, 2020, 14:49: FC6=4.71e-10. IG1=3.29e-6T.

 Friday, June 26, 2020, 14:51: SV1 closed. SV5 open/closed x5.

Friday, June 26, 2020, 14:52: SV5 open. No trip!!!

Friday, June 26, 2020, 14:52: FC6=3.2e-9A. IG1=4.13e-6T.

 Friday, June 26, 2020, 15:05: FC6=1.12e-9A. IG1=3.49e-6T.

Total time for eff measurement=43 minutes.

Friday, June 26, 2020, 15:33: By averaging all readings, the gas signal corresponds to 57.7% of the entire signal.  There is an increase factor of  2.36. No efficiency can be estimated as the signal is not from the gas bottle.

Friday, June 26, 2020, 15:43: Switching to mass 40 (Ar+1).

 Friday, June 26, 2020, 15:56: I think I am set on mass 40 (Ar+) The signal varies when  adjusting the voltage. Proceeding to efficiency measurement.

Friday, June 26, 2020, 15:59: FC6=2.49e-11. IG1=3.67e-6T

Friday, June 26, 2020, 16:00: SV3 closed.

Friday, June 26, 2020, 16:05: SV4 closed.

Friday, June 26, 2020, 16:20 : SV5 closed.

Friday, June 26, 2020, 16:20 : SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Friday, June 26, 2020, 16:21 : SV3 and SV4 opened.

Friday, June 26, 2020, 16:21 : FC6=1.06e-11A. IG1=3.40e-6T

Friday, June 26, 2020, 16:24 : SV1 closed. SV5 open/closed x5.

Friday, June 26, 2020, 16:24 : SV5 open. No trip!!!

Friday, June 26, 2020, 16:25  FC6=3.7e-11. IG1=4.30e-6T

Friday, June 26, 2020, 16:28: The proportion between gas signal and background is 57.4% of the entire signal. Very similar result to  previous mass. There is also an increase factor of 2.35 for Ar+1

Friday, June 26, 2020, 16:37: FC6=2.44e-11. IG1=3.58e-6

Friday, June 26, 2020, 16:43: Coil=20 A. This provides the smallest ion current signal FC6=1.13e-11.

Friday, June 26, 2020, 16:49: FC6=1.13e-11. IG1=3.58e-6T.

Friday, June 26, 2020, 16:50: SV3 closed.

Friday, June 26, 2020, 16:54 :SV4 closed.

Friday, June 26, 2020, 17:09 :SV5 closed.

Friday, June 26, 2020, 17:10 :SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Friday, June 26, 2020, 17:10 :SV3 and SV4 opened.

Friday, June 26, 2020, 17:10 :FC6=1.51e-12A. IG1=3.38e-6T

The proportion of this measurement is 86.63%.

Friday, June 26, 2020, 17:12 :SV1 closed. SV5 open/closed x5.

Friday, June 26, 2020, 17:12 :SV5 open. No trip!!!.

Friday, June 26, 2020, 17:22 :  FC6=3.7e-11. IG1=4.30e-6T

 Friday, June 26, 2020, 17:24:  FC6 reading keeps decreasing and it's already below the initial current.

I suspect that the ion current that was read when the coil was changed corresponds to superposition of previously ionized species and the coil adjusted those charges. Once flushed, the neutral atoms will established a new equilibrium.

NOTE: Will setting the anode to 0 V flushed the source? Test it tomorrow.

Friday, June 26, 2020, 17:43: FC6 signal is increasing. I'll leave it as is.

 


Saturday, June 27, 2020, 11:47: FC6=1.06e-11A. IG1=3.40e-6T. Similar to the value of the current prior to the efficiency measurement.

 The plan for today Saturday, June 27, 2020 is:

  1. Perform an efficiency for coil 20. This might be a long measurement if the value has to increases again. If after 1.5 h the signal still shows a mismatch, then I'll try to flush the source by setting the anode to 0V
  2. Redo efficiency measurement.
  3. Try another coil value.

Saturday, June 27, 2020, 11:52: FC6=1.06e-11. IG1=3.40e-6T

Saturday, June 27, 2020, 11:55: SV3 closed.

Saturday, June 27, 2020, 12:03 : SV4 closed.

Saturday, June 27, 2020, 12:20 : SV5 closed.

Saturday, June 27, 2020, 12:20: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 12:21 : SV3 and SV4 opened.

Saturday, June 27, 2020, 12:23 : FC6=6.76e-12A. IG1=3.14e-6T

Saturday, June 27, 2020, 12:26 : SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 12:27 : SV5 open. No trip!!!

Saturday, June 27, 2020, 12:42: FC6=1.01e-11A. IG1=3.38e-6T.

Saturday, June 27, 2020, 12:48Coil to 0, then to 20A. Anode voltage to 0V then to 150V. FC6=1.05e-11A.

Saturday, June 27, 2020, 12:50: SV3 closed.

Saturday, June 27, 2020, 12:55 : SV4 closed.

Saturday, June 27, 2020, 13:01: SV5 closed

Saturday, June 27, 2020, 13:01 : SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 13:02: SV5 closed.

Saturday, June 27, 2020, 13:04: TSG:CB1 and TPS:VCB3 tripped. now on

Saturday, June 27, 2020, 13:04: FC6=6.64e-12A. IG1=3.23e-6T.

Saturday, June 27, 2020, 13:05:  SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 13:07: SV5 open. No trip!!!

Saturday, June 27, 2020, 13:13: FC6=1.03e-11A. IG1=3.38e-6T.

Saturday, June 27, 2020, 13:15: Now I will sweep the coil from  0 to 20. Then run the efficiency measurement again.

Saturday, June 27, 2020, 13:22: Coil=15A provides the minimum current but I will stay with 20 A.

Saturday, June 27, 2020, 13:23 : SV3 closed

Saturday, June 27, 2020, 13:28 : SV4 closed.

Saturday, June 27, 2020, 13:37: SV5 closed.

Saturday, June 27, 2020, 13:42: FC6=6.60e-12A. IG1=3.23e-6T.

By averaging all the readings for coil 20. The proportion of current coming from the gas is only 36%. There is an increase factor of 1.56 compared to the no gas situation.

Saturday, June 27, 2020, 13:49: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 13:51: SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 13:52: SV5 open. No trip!!!

Saturday, June 27, 2020, 14:08 : FC6=1.00e-11A. IG1=3.38e-6T.

Saturday, June 27, 2020, 14:10: Coil=40A. This values gives a similar current as coil=0A.

Saturday, June 27, 2020, 14:11: FC6=2.65e-11A. IG1=3.38e-6T.

Saturday, June 27, 2020, 14:19: SV3 closed.

Saturday, June 27, 2020, 14:26: FC6=2.45e-11.

Saturday, June 27, 2020, 14:27:SV4 closed.

Lunch break.

Saturday, June 27, 2020, 15:23: IG1=9.65e-12. IG1=3.20e-6T.

Saturday, June 27, 2020, 15:24: SV5 closed.

Saturday, June 27, 2020, 15:33: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 15:34: SV3 and SV4 opened.

Saturday, June 27, 2020, 15:55: SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 15:56: SV5 open. No trip!!!

Saturday, June 27, 2020, 16:14: FC6=1.95e-11A. IG1=3.40e-6T.

Again, the base current with all the gas is note the same as prior to the effciciency measurment.

Saturday, June 27, 2020, 16:15 : Anode to 0V.

Saturday, June 27, 2020, 16:16 Anode=150 V. FC6=2.01e-11A.

Saturday, June 27, 2020, 16:18:Coil=0A.

Saturday, June 27, 2020, 16:19 Coil=40A. FC6=1.98e-11A.

Saturday, June 27, 2020, 16:20 Coil to 0. Anode to 0.

Saturday, June 27, 2020, 16:20 Anode=150V, coil=40A.

Saturday, June 27, 2020, 16:22: FC6=1.97e-11

Saturday, June 27, 2020, 16:32: Coil to 0. Anode to 0.

Saturday, June 27, 2020, 16:33: Coil=40A. Anode 150V.

Saturday, June 27, 2020, 16:34:FC6=1.97e-11A.

Saturday, June 27, 2020, 16:36: SV3 closed.

Saturday, June 27, 2020, 16:43: SV4 closed.

Saturday, June 27, 2020, 16:50: SV5 closed.

Saturday, June 27, 2020, 16:51: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 16:52 :SV3 and SV4 opened.

Saturday, June 27, 2020, 16:55: FC6=7.64e-12. IG1=3.31e-6

Saturday, June 27, 2020, 16:56 : SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 16:57 : SV5 open. No trip!!!

 Saturday, June 27, 2020, 17:1: FC6=1.91e-11A

 What's FC6 value for coil=0?

Saturday, June 27, 2020, 17:17: Coil=0

 Saturday, June 27, 2020, 17:18: FC6=2.71e-11A.

Now coil=55A gives a similar current as coil=0... Back to coil=40A.

Saturday, June 27, 2020, 17:53: SV3 closed.

Saturday, June 27, 2020, 17:58: SV4 closed.

 Saturday, June 27, 2020, 18:07: SV5 closed.

FC6=7.47e-12A. IG1=3.23e-6T.

Saturday, June 27, 2020, 18:07 : The second set of measurements for coil=40. The proportion of current coming from the gas is 59.94%. There is an increase factor of  2.50 compared to the no gas situation.

Saturday, June 27, 2020, 18:07: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 18:08: SV3 and SV4 opened.

Saturday, June 27, 2020, 18:18: SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 18:18 : SV5 open. No trip!!!

 Saturday, June 27, 2020, 18:4: FC6=1.84e-11. IG1=3.38e-6T.

 Saturday, June 27, 2020, 18:4: Done for today.


Sunday, June 28, 2020, 14:38: FC6=1.62e-11A. IG1=3.30e-6T.

 The plan for today Sunday, June 28, 2020 is:

  1. Perform an efficiency  measurement for coil=65A.
  2. Coil sweep with all gas lines closed.

 Sunday, June 28, 2020, 14:50: Coil=65A. Provides highest current. For coil<100A.

Sunday, June 28, 2020, 14:59: FC6=2.16e-11A. IG1=3.31e-6T.

Sunday, June 28, 2020, 15:08: SV3 closed.

Sunday, June 28, 2020, 15:13:FC6=1.94e-11.A.

Sunday, June 28, 2020, 15:14. SV4 closed.

Sunday, June 28, 2020, 15:30:SV5 closed.

Sunday, June 28, 2020, 15:30: FC6=3.82e-12A. IG1=3.14e-8T.

Sunday, June 28, 2020, 15:32: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Sunday, June 28, 2020, 15:32: SV3 and SV4 opened.

Sunday, June 28, 2020, 15:37:FC6=3.22e-12A. IG1=3.14e-6T.

Sunday, June 28, 2020, 15:38: SV1 closed. SV5 open/closed x5.

Sunday, June 28, 2020, 15:38: SV5 open. No trip!!!

Sunday, June 28, 2020, 15:55: FC6=1.79e-11A. IG1=3.31e-6T.

Sunday, June 28, 2020, 16:02: SV3 closed.

Sunday, June 28, 2020, 16:08: SV4 closed.

Sunday, June 28, 2020, 16:22: SV5 closed.

Sunday, June 28, 2020, 16:22: 3.31e-12A. IG1=3.05e-6T.

Sunday, June 28, 2020, 16:23: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Sunday, June 28, 2020, 16:24: SV3 and SV4 opened.

Sunday, June 28, 2020, 16:25: SV1 closed. SV5 open/closed x5.

Sunday, June 28, 2020, 16:25: SV5 open. No trip!!!

Sunday, June 28, 2020, 16:37: 1.82e-11. IG1=3.23-8T.

Sunday, June 28, 2020, 16:51:SV5 closed.

Sunday, June 28, 2020, 16:51:SV3 and SV4 closed.

Sunday, June 28, 2020, 17:25: Coil sweep finished .

Sunday, June 28, 2020, 17:26: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Sunday, June 28, 2020, 17:27: SV3 and SV4 opened.

Sunday, June 28, 2020, 17:28: SV1 closed. SV5 open/closed x5.

Sunday, June 28, 2020, 17:28 :SV5 open. No trip!!!

Sunday, June 28, 2020, 17:29: Coil=0A.

Sunday, June 28, 2020, 17:33: Done for the day.

 

 

Entry  Tuesday, August 18, 2020, 12:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, RP check & Mass magnet check. 

Tuesday, August 18, 2020, 12:05: RP1 on

Tuesday, August 18, 2020, 12:10: RP1 off

Install Gas Ballast vapour port w/ filter.

Tuesday, August 18, 2020, 13:19: RP1 on

Disengage shipping locks*

Tuesday, August 18, 2020, 13:55: Turbo pumps on.

Tuesday, August 18, 2020, 14:02: TP1 A trip. TSG:CG1A pressure issue. Remove filter port on Gas ballast. Add blank.

TSG:CG1A pressure improving.

Tuesday, August 18, 2020, 14:37: TP1 A trip. TSG:CG1A pressure issue.

Tuesday, August 18, 2020, 14:48: Bypass BV1A. Switch on TP1 A.

Tuesday, August 18, 2020, 14:55: No trips* Bypass to remain until CG1A below 0.050T.

Tuesday, August 18, 2020, 21:58: Bypass removed. CG1A @ 0.041T.

 

 

Entry  Thursday, September 03, 2020, 11:28, Aaron Schmidt, -, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Leak check 2.0 

Out Gas & MB1 check (Or leak check 2.0)

Ref: https://elog.triumf.ca/TIS/Test-Stand/809 - Leak Checks

Ref: https://elog.triumf.ca/TIS/Test-Stand/803 - Fault

WP I2020-08-19-1 For MB1 work

Thursday, September 03, 2020, 11:23: Vacuum remains stable @ 1.03e-06T.. PS on. Auto-ramp TGHT / TBHT to 350 / 150 A @ 2 A per min.

Thursday, September 03, 2020, 13:06: TS Tripped. Vacuum Spikes again. Appears the water leak is still ongoing.

Thursday, September 03, 2020, 13:49 Waterlines are all close. Vacuum becoming more stable.


Tuesday, September 08, 2020, 07:40: Ion Gauge & turbo pumps off.


Wednesday, September 09, 2020, 06:13: Venting.  


FS#2 - R TGHT (C) feed through and section had been removed and re-souldered both on the water block and the feed through.

Tuesday, September 15, 2020, 09:47:  Roughing.

Tuesday, September 15, 2020, 10:47: TP1B on.

Tuesday, September 15, 2020, 14:35 :TP1A on.

Tuesday, September 15, 2020, 14:42 : IG1 on.


Wednesday, September 16, 2020, 07:44: Vacuum @ 6.00e-06T.

Wednesday, September 16, 2020, 07:47: FS#2 waterline opened. Vacuum stable @ 6.00e-06T.

Wednesday, September 16, 2020, 08:02: Vacuum @ 5.97e-06T. Vacuum stable.

Wednesday, September 16, 2020, 08:03: FS#3 open. Vacuum stable.

Wednesday, September 16, 2020, 08:09: FS#4 open. Vacuum stable.

Wednesday, September 16, 2020, 08:24: FS#5 open. Vacuum stable @ 5.91e-06T.

No vacuum spikes noted.

Wednesday, September 16, 2020, 08:42: PS on. Note: Once Vacuum reaches 3.5e-06T, begin auto-ramping.

Wednesday, September 16, 2020, 09:25: It appears the leak is still here. But very subtle. Vacuum @ 6.18e-06T. Many curse words uttered. PS off. Locked out. Purge waterlines.


Thursday, September 17, 2020, 08:21: Vacuum @ 3.32e-06T.

Thursday, September 17, 2020, 08:23: Opened FS#5.

Thursday, September 17, 2020, 08:55: Opened FS#4. Vacuum @ 3.12e-06T.

Thursday, September 17, 2020, 09:51: Opened FS#3. Vacuum @ 3.12e-06T

Thursday, September 17, 2020, 10:21: Opened FS#2 Vacuum @ 3.12e-06T.

Thursday, September 17, 2020, 10:52: Gradual climb on IG1. Vacuum @ 4.44e-06T.

Thursday, September 17, 2020, 10:53: IG1 & turbo pumps off. Purge water from FS#2.

Thursday, September 17, 2020, 11:37: Venting.

Checked: Upper line & Lower line independently. No obvious leak detected. Checked O-rings. Replaced w/ C-Seals.

Thursday, September 17, 2020, 13:31: Roughing.

Thursday, September 17, 2020, 14:06: TP1B on. 

Thursday, September 17, 2020, 19:11: TP1A on. 


Friday, September 18, 2020, 12:07: FS#2 opened. Vacuum @ 2.48e-06T 

Friday, September 18, 2020, 12:12: FS#2 Closed. Vacuum spiked to near 6.0e-05T. 

Friday, September 18, 2020, 12:15: FS#2 fully purged. 


Tuesday, September 22, 2020, 06:51: Ion gauge & Turbo pumps off. 

Tuesday, September 22, 2020, 08:10: Venting.

O-rings swapped for fresh new ones w/ vacuum grease on (C) & (D) water blocks.

Tuesday, September 22, 2020, 09:27: Roughing.

Tuesday, September 22, 2020, 10:10: TP1B on. 

Tuesday, September 22, 2020, 12:20: TP1A on. 

Tuesday, September 22, 2020, 15:02: Vacuum @ 2.97e-06T.

Tuesday, September 22, 2020, 15:05: Opened FS#2. No immediate response.

Tuesday, September 22, 2020, 15:13: Gradual vacuum spike to 2.6e-06T. Closed FS#2


Wednesday, September 23, 2020, 06:36: Ion gauge & turbo pumps off. 

Wednesday, September 23, 2020, 11:38: TP1B on only. IG1 on.

Wednesday, September 23, 2020, 15:37: LD:  0.0e-09 atm-cc/sec. Vacuum @3.9e-06T.

Wednesday, September 23, 2020, 15:38: Open valve to TP1B.

Wednesday, September 23, 2020, 15:41:

LD: 0.0e-09 atm-cc/sec. Vacuum @3.67e-06T.

Wednesday, September 23, 2020, 15:51: LD: 0.0e-09 atm-cc/sec. Vacuum @3.67e-06T. No response on LD.

Wednesday, September 23, 2020, 15:57: 70 PSI of He on line (C) TGHT Right side. LD: 0.0e-09 atm-cc/sec. Vacuum @3.73e-06T. Flush line

Wednesday, September 23, 2020, 15:59: LD: 1.7e-09 atm-cc/sec. & Rising.

Wednesday, September 23, 2020, 16:00: LD: 4.1e-09 atm-cc/sec & rising. Line (C) confirmed again.

Wednesday, September 23, 2020, 16:04: LD & He disconnected. IG1 & TP1B off. Remove (C) Right TGHT line in the morning. Will aim to replace the source tray side. Feed through side has already been done.


Thursday, September 24, 2020, 07:16: Venting. 

Remove FEBIAD & Source tray side R-TGHT line (C) from FS#2. Blank off with blind double block.

Thursday, September 24, 2020, 08:41: Roughing

Thursday, September 24, 2020, 09:12: TP1B on.

Thursday, September 24, 2020, 09:18: Ion gauge on.

Thursday, September 24, 2020, 10:17: TP1A on. 

Thursday, September 24, 2020, 14:20: Connect LD & Set-up He. Vacuum @ 2.92e-06T. LD: 0.0e-09 atm-cc/sec.

Thursday, September 24, 2020, 14:22: Open valve to TP1B.

Thursday, September 24, 2020, 14:24: Vacuum @ 2.95e-06T. LD: 2.2e-08 atm-cc/sec. 70 PSI of He on line (C) TGHT Return side.

Thursday, September 24, 2020, 14:30: Vacuum @ 2.74e-06T. LD: 1.5e-08 atm-cc/sec.

Minimal change.


 Tuesday, September 29, 2020, 04:50: IG1 off. Turbo pumps off.

Entry  Tuesday, October 13, 2020, 12:34, Aaron Schmidt, , HP-FEBIAD, , , 38295-8, 42752-5, In progress, MB1 Check. MB1_Check_Oct_-_2020.docx

He & Ar calibrated leak bottles in.

Tuesday, October 13, 2020, 12:33: Roughing.

Tuesday, October 13, 2020, 13:17: TP1B on.

Tuesday, October 13, 2020, 14:19: TP1A on. 

Tuesday, October 13, 2020, 15:44: Waterlines opened. Vacuum @ 9.58e-06T & dropping. Power on.

Tuesday, October 13, 2020, 15:49: Valve to Mini-pump was open & the pump happened to already be switched on.

Tuesday, October 13, 2020, 15:50: Open SV3 & SV4.

Tuesday, October 13, 2020, 15:55: Close mini-pump & switch off. SV3 & SV4. Briefly open/close SV5. Continue until vacuum stabilizes.

Tuesday, October 13, 2020, 15:59: SV5 open. Alt SV3 & SV4 w/ SV5 until stable.

Tuesday, October 13, 2020, 16:04: Gas lines SV3, SV4, SV5 open. Vacuum @ 9.96e-06T & dropping.

Tuesday, October 13, 2020, 22:30: PS on. Vacuum @ 2.13e-06T. Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per min.  

Tuesday, October 13, 2020, 22:33: Anode* Short? Halt auto-ramping.

Tuesday, October 13, 2020, 22:35: Auto-ramping TGHT / TBHT to 100 / 50 A @ 1 A per min. Coil @ 10 A.


Wednesday, October 14, 2020, 05:19: Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per min.  

Wednesday, October 14, 2020, 07:14: BIAS / EE / EZL to 20 / -1.5 / 10 kV. IV4 opened.

Wednesday, October 14, 2020, 10:30: Auto-ramping TGHT to 350 A @ 2 A per min.

Wednesday, October 14, 2020, 11:11: BIAS / EE / EZL to 30 / -1.5 / 13 kV. 

Wednesday, October 14, 2020, 11:12: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 


Thursday, October 15, 2020, 14:13: MB1 connected.

Epics = Readback

10 A = 11.6 A

0.394 V = 0.39 V

Calibration required, but it's running.

Thursday, October 15, 2020, 14:33: Auto-Cooling. Tap down HV. 

Thursday, October 15, 2020, 14:36: Gas lines closed. 


Friday, October 16, 2020, 07:55: Power / sources off. IG1 off. Turbo pumps off.

Friday, October 16, 2020, 07:56: HS Waterlines purged.

Friday, October 16, 2020, 10:07: Venting.