227
|
Friday, November 02, 2012, 14:20 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | | Mass scan done |
Normal
0
false
false
false
|
|
|
228
|
Friday, November 02, 2012, 15:40 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | SiC#3 cooldown started | Started the cooldown for SiC#3. |
|
|
229
|
Monday, November 05, 2012, 09:47 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | TPS optics cannot be turned off. | All TPS optics, with the exception of TPS:Q4
cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1 |
|
|
230
|
Monday, November 05, 2012, 13:26 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | Venting the Test Stand | Venting the Test Stand.
TiC#3 will be ready to be removed
in few minutes. |
|
|
231
|
Monday, November 05, 2012, 14:41 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | Done | Target Removed | Target looks OK. The right leg was a bit
much out of center and will be adjusted in
the lab. |
|
|
287
|
Monday, March 25, 2013, 11:39 |
Anders Mjos | Ta#39 | LP-SIS | ITW | TM1 | | | Done | Ta#39 commissioning | Target installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing |
|
|
371
|
Friday, April 04, 2014, 17:01 |
Rick Maharaj | UC#9 | LP-SIS | ITW | TM1 | | 39230-3 | Done | Conditioning Heatshield for UCx#9 | Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS installed in
test stand with Ta tube as heat load. |
|
|
390
|
Thursday, June 26, 2014, 16:32 |
Anders Mjos | Ta#43 | LP-SIS | ITW | TM1 | 40282-2 | 39230-6 | In progress | Conditioning Ta#43 | Thursday, June 26, 2014, 16:31: Roughing.
Thursday, June 26, 2014, 16:51: Starting
turbos. |
|
|
397
|
Friday, August 08, 2014, 12:45 |
Anders Mjos | ZrC#6 | LP-SIS | ITW | TM1 | 40282-3 | 39230-5 | Done | Condictioning ZrC#6 | Friday, August 08, 2014, 12:44: Stopped
turbos
Friday, August 08, 2014, 14:42: Venting |
|
|
404
|
Thursday, September 25, 2014, 15:44 |
Anders Mjos | ThO#1 | | ITW | TM1 | 40282-5 | | Done | ThO#1 Heat Shield Conditioning | Thursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06:
Starting turbos |
|
|
499
|
Wednesday, March 16, 2016, 09:59 |
Anders Mjos | Target tube only | | | TM1 | 39459-2 | 40898-2 | In progress | Conditiong Heat Shield for UC#15 | Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58:
Roughing |
|
|
1
|
Wednesday, June 29, 2011, 15:30 |
John Wong | | | | | | | | Testing Yield station elog | ABC 123 blah blah blah... |
|
|
4
|
Thursday, September 15, 2011, 09:20 |
Anders Mjos | | | | | | | | ISAC TestStand old e-log | link
to old e-log |
|
|
5
|
Thursday, September 15, 2011, 13:46 |
Anders Mjos | FEBIAD Test | HP-FEBIAD | | | | | Failed | FEBIAD Broken Tube | See attached file for photos of the broken
tube |
|
|
9
|
Friday, September 23, 2011, 15:38 |
Rick Maharaj | | | | | | | | test stand vented | Test stand vented |
|
|
10
|
Friday, September 23, 2011, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray | Friday, September 23, 2011, 16:3: The connection
on the 9-pin connector for FEBIAD targets
showed burn marks from the previous FEBIAD |
|
|
12
|
Monday, September 26, 2011, 14:56 |
John Wong | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray |
|
|
|
13
|
Monday, September 26, 2011, 16:14 |
Anders Mjos | | | | | | | Problems/Solutions | Fixed leak on water line for HS, added Kapton insulation |
While testing SiC#26 a leak
was discovered on the water line to the heat
shield. The leak was in the right joint (see |
|
|
22
|
Thursday, October 13, 2011, 12:33 |
Rick Maharaj | Training | | | | | | | Test stand vented | test stand vented |
|
|
23
|
Thursday, October 13, 2011, 15:42 |
Anders Mjos | Training | HP-FEBIAD | | | | | Problems/Solutions | Target ready to be heated |
|
|