ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  638   Tuesday, February 20, 2018, 09:04 Carla Babcock       Trying HV with rubber corona shieldTuesday, February 20, 2018, 09:01: Sparks
at 62.5kV after a couple minutes. Sounds
like they were in the EE spark gap but don't
  
  1019   Tuesday, August 13, 2024, 09:31 Dave Neilson      Problems/SolutionsTroubleshooting HV sparks and FC0 signalMonday, August 12, 2024, 17:00   EOD.
target installed, roughed, turbos on. No
effect on vacuum from turning on water cooling
 temp_8-13.PNG 
  559   Wednesday, January 18, 2017, 09:23 Aaron SchmidtTa TestLP-FEBIAD  39530-3 In progressTri-Coil FEBIAD for testingWednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41:
Turbo pumps started.
 12x 
  586   Monday, May 22, 2017, 09:43 Aaron Schmidt HP-FEBIAD-CTL     Tri-Coil CTL-FEBIAD test IVMonday, May 22, 2017, 09:41: Roughing.
Monday, May 22, 2017, 10:00: Turbo
pumps started.
 CTL_FEBIAD_Test_IV.docxTS-2017-05-22-10-07.rgaTS-2017-05-25-15-42.rga 
  584   Tuesday, May 16, 2017, 14:25 Aaron Schmidt HP-FEBIAD-CTL     Tri-Coil CTL-FEBIAD test IIICoil loose (Remove lid, Tighten and place
lid again)
Tuesday, May 16, 2017, 14:24: Roughing.
 8x 
  576   Thursday, April 06, 2017, 12:06 Aaron Schmidt HP-FEBIAD-CTL    In progressTri-Coil CTL-FEBIAD testThursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07:
Turbo pumps on.
  
  219   Wednesday, October 03, 2012, 13:50 Aurelia Laxdal HP-FEBIAD    In progressTraining updatesOn Monday October 1, the HP-FEBIAD source
was turned ON again, to complete the operator
training. The last session was yesterday
  
  720   Friday, May 03, 2019, 08:30 Anders Mjos      In progressTrainingTraining: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo
pumps stopped.
  
  225   Thursday, November 01, 2012, 11:16 Aurelia LaxdalTiC#3LP-SISITWTM1   TiC#3-LP-SIS StartupDid the HV conditioning for the TiC#3 up
to 30kV.
Heaters ramp up in progress.
  
  896   Wednesday, August 25, 2021, 15:30 Ferran Boix Pamies       Thermocouple high voltage testWednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021,
04:11: IG1 switched on. Vacuum @ 8.35e-06T
  
  733   Wednesday, June 19, 2019, 17:25 Fernando Maldonado      DoneThermocouple connectionWednesday, June 19, 2019, 17:13  Ferran
and Fernando tested the 9-pin connector to
have a reading on a thermocouple following
  
  989   Thursday, January 18, 2024, 10:44 Aaron Schmidt      DoneThermal tests 2December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer.
  
  985   Thursday, November 16, 2023, 09:43 Aaron Schmidt LP-SIS    In progressThermal testsAurelia has been testing on the ISAC TS
since last week. Thermocouples are installed
in the end cap, left side & the ionizer.
  
  353   Thursday, January 02, 2014, 11:53 Anders Mjos      Problems/SolutionsThe computer will not boot WindowsThe computer has been brought over to PC
support for diagnostics. 
Hard Drive was found to be corrupted.
  
  404   Thursday, September 25, 2014, 15:44 Anders MjosThO#1 ITWTM140282-5 DoneThO#1 Heat Shield ConditioningThursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06:
Starting turbos
  
  973   Thursday, July 13, 2023, 07:37 Aaron Schmidt       Tests - Aurelia LThursday, July 13, 2023, 07:37: Chamber
is vented. Beamline is vented. Interlock
bypassed on TPS:IV4 - AS
  
  503   Wednesday, April 13, 2016, 13:03 Aaron Schmidt LP-SIS  41790-239956-8 Testing restraint insulator prototype (2)Wednesday, April 13, 2016, 13:03: Begin
roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34:
 Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx 
  502   Monday, April 04, 2016, 11:33 Aaron Schmidt LP-SIS  41790-239956-8In progressTesting restraint insulator prototypeMonday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started
 Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx 
  459   Monday, August 10, 2015, 18:01 Anders Mjos LP-SIS    In progressTesting new center block targetInstalled thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
  
  438   Friday, April 24, 2015, 12:26 Anders Mjos LP-FEBIAD TM2 39230-1In progressTesting new TM2 Source TrayPhotos on DocuShare

 
Friday, April 24, 2015
 TM2_Source_Tray_in_Test_Stand_-_Electrical_Check.pdfTM2_Source_Tray_in_Test_Stand_FEBIAD_Coil_Water_Leak.pdfTM2_Source_Tray_Test_FEBIAD_Target.docxTM2_Source_Tray_Coil_Leak_2015-04-30.png 