Entry  Tuesday, February 20, 2018, 09:04, Carla Babcock, , , , , , , , Trying HV with rubber corona shield 
Tuesday, February 20, 2018, 09:01: Sparks at 62.5kV after a couple minutes. Sounds like they were in the EE spark gap but don't appear on the EE read
current. Ozone smell around 61kV, so there are still some discharges.
Entry  Tuesday, August 13, 2024, 09:31, Dave Neilson, , , , , , , Problems/Solutions, Troubleshooting HV sparks and FC0 signal temp_8-13.PNG
Monday, August 12, 2024, 17:00   EOD. target installed, roughed, turbos on. No effect on vacuum from turning on water cooling lines. TGHT TBHT
slowly brought to 230A/230A overnight. 
Tuesday, August 13, 2024, 09:28.  Vacuum at 9.9e-7T.  TGHT TBHT at 210/210. accelerating heating to 230/230. bringing up HV EZL
Entry  Wednesday, January 18, 2017, 09:23, Aaron Schmidt, Ta Test, LP-FEBIAD, , , 39530-3, , In progress, Tri-Coil FEBIAD for testing 12x
Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41: Turbo pumps started.
Wednesday, January 18, 2017, 11:01: Ion gauge on.
Entry  Monday, May 22, 2017, 09:43, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , , Tri-Coil CTL-FEBIAD test IV CTL_FEBIAD_Test_IV.docxTS-2017-05-22-10-07.rgaTS-2017-05-25-15-42.rga
Monday, May 22, 2017, 09:41: Roughing.
Monday, May 22, 2017, 10:00: Turbo pumps started.

Tuesday, May 23, 2017, 07:45: Power/sources on.
Entry  Tuesday, May 16, 2017, 14:25, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , , Tri-Coil CTL-FEBIAD test III 8x
Coil loose (Remove lid, Tighten and place lid again)
Tuesday, May 16, 2017, 14:24: Roughing.
Tuesday, May 16, 2017, 14:45: Turbo pumps on.
Entry  Thursday, April 06, 2017, 12:06, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , In progress, Tri-Coil CTL-FEBIAD test 
Thursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07: Turbo pumps on.
Thursday, April 06, 2017, 13:18: Ion gauge on.
Entry  Wednesday, October 03, 2012, 13:50, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, Training updates 
On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being
the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and
also over the week-end.
Entry  Friday, May 03, 2019, 08:30, Anders Mjos, , , , , , , In progress, Training 
Training: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo pumps stopped.
Entry  Thursday, November 01, 2012, 11:16, Aurelia Laxdal, TiC#3, LP-SIS, ITW, TM1, , , , TiC#3-LP-SIS Startup 
Did the HV conditioning for the TiC#3 up to 30kV.
Heaters ramp up in progress.
Entry  Wednesday, August 25, 2021, 15:30, Ferran Boix Pamies, , , , , , , , Thermocouple high voltage test 
Wednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021, 04:11: IG1 switched on. Vacuum @ 8.35e-06T - AS 
Thursday, August 26, 2021, 14:04 Water on, no spike in vacuum. IG1:2.6e-6T
Entry  Wednesday, June 19, 2019, 17:25, Fernando Maldonado, , , , , , , Done, Thermocouple connection 
Wednesday, June 19, 2019, 17:13  Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used
by Aurelia (see elog 721).
Wednesday, June 19, 2019, 17:24: Test succesful!
Entry  Thursday, January 18, 2024, 10:44, Aaron Schmidt, , , , , , , Done, Thermal tests 2 
December 18 - January 15. Were not logged. Placed holder. Aurelia's tests. Included thermocouples in the oven & ionizer.
Entry  Thursday, November 16, 2023, 09:43, Aaron Schmidt, , LP-SIS, , , , , In progress, Thermal tests 
Aurelia has been testing on the ISAC TS since last week. Thermocouples are installed in the end cap, left side & the ionizer.
No elog was initiated, but much has happened.
Site wide power outage on Friday/Saturday caused problems. The TS was running at that time & was also affected. Reboots occurred on the weekend
Entry  Thursday, January 02, 2014, 11:53, Anders Mjos, , , , , , , Problems/Solutions, The computer will not boot Windows 
The computer has been brought over to PC support for diagnostics. 
Hard Drive was found to be corrupted. A new HD will be installed and Windows upgraded to a newer version.

Thursday, January 16, 2014
Entry  Thursday, September 25, 2014, 15:44, Anders Mjos, ThO#1, , ITW, TM1, 40282-5, , Done, ThO#1 Heat Shield Conditioning 
Thursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06: Starting turbos
Thursday, September 25, 2014, 16:14: Turbos at speed.
Entry  Thursday, July 13, 2023, 07:37, Aaron Schmidt, , , , , , , , Tests - Aurelia L 
Thursday, July 13, 2023, 07:37: Chamber is vented. Beamline is vented. Interlock bypassed on TPS:IV4 - AS
Entry  Wednesday, April 13, 2016, 13:03, Aaron Schmidt, , LP-SIS, , , 41790-2, 39956-8, , Testing restraint insulator prototype (2) Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx
Wednesday, April 13, 2016, 13:03: Begin roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34: Turbo pumps started.
Wednesday, April 13, 2016, 13:39: Ion Gauge on.
Entry  Monday, April 04, 2016, 11:33, Aaron Schmidt, , LP-SIS, , , 41790-2, 39956-8, In progress, Testing restraint insulator prototype Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx
Monday, April 04, 2016, 11:31: Begin roughing. (No plasma electrode)
Monday, April 04, 2016, 12:47: Started Turbos and Ion gauge

Tuesday, April 05, 2016, 09:09: Open water, Vacuum increased from 3.7E-07 to 2.2E-06 (roughly). Leak detected, Confirmed via RGA, Water
Entry  Monday, August 10, 2015, 18:01, Anders Mjos, , LP-SIS, , , , , In progress, Testing new center block target 
Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
Entry  Friday, April 24, 2015, 12:26, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Testing new TM2 Source Tray TM2_Source_Tray_in_Test_Stand_-_Electrical_Check.pdfTM2_Source_Tray_in_Test_Stand_FEBIAD_Coil_Water_Leak.pdfTM2_Source_Tray_Test_FEBIAD_Target.docxTM2_Source_Tray_Coil_Leak_2015-04-30.png
Photos on DocuShare

 