ID Date Author Category Type Specific Subjectdown Text Attachments
  48   Friday, July 06, 2012, 16:03 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair Complete Target elevation measurements and
beam spot plots were completed on the T1-MK2
target and the target is now fully repaired
 T1MK2_-_July_2012.pdf 
  60   Wednesday, October 24, 2012, 17:34 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair CompleteThe target ladder was detached, old delta
seals removed, sealing surfaces cleaned using
scotchbrite pad and a dremel tool, and delta
  
  64   Monday, December 10, 2012, 15:42 Isaac EarleMaintenanceTarget 1TargetT1-MK2 Target Maintenance- T1-MK2 target moved from storage pit
to hot cell
- Removed unused proximity sensor
  
  181   Friday, October 09, 2015, 15:52 Isaac EarleRepairTarget 1TargetT1-MK2 Protect Monitor Replacement and InspectionWhen the damage to the T2 Protect Monitor
was found to be caused by flying debris from
a vacuum spike (see e-log #179), it was decided
 12x 
  41   Monday, June 18, 2012, 16:27 Isaac EarleRepairTarget 1TargetT1-MK2 Profile and Protect Monitor Electronics Check Bill Rawnsley and Mike Russell performed
a 'blip' test on the T1-MK2 profile monitor
and protect monitors today.  A possible
  
  135   Wednesday, January 14, 2015, 13:32 Isaac EarleStandard OperationTarget 1TargetT1-MK2 Moved from B/L to Storage PitThe T1-MK2 target was transferred from
the beam line to the storage pit in hole
#5 using the transfer flask.  A maximum
  
  40   Friday, June 08, 2012, 17:01 Isaac EarleRepairTarget 1TargetT1-MK2 Leak Repair Update A leak check was performed on the
T1-MK2 target in the hot cell today and confirmed
successful leak-free installation of the
  
  59   Friday, September 28, 2012, 15:19 Isaac EarleRepairTarget 1TargetT1-MK2 Delta Seal Leak  After removal of the leaky
target cassette at position 3, plugs were
installed on the target ladder and a leak
  
  208   Friday, September 30, 2016, 16:54 Isaac EarleRepairTarget 1TargetT1-MK2 - New Beryllium Targets Installed The following work was performed
on the T1-MK2 target assembly during the
September 2016 Mini-shutdown:
 T1-MK2_Posn_4_Entrance_Window_Beam_Spot_-_Sept_27_2016.JPGT1-MK2_Posn_4_Exit_Window_Beam_Spot_-_Sept_27_2016.JPGTarget_Info_Sheet_&_Elevations.pdf 
  273   Wednesday, March 31, 2021, 16:15 Matthew GareauStandard OperationTarget 1TargetT1-MK1 target exchange March 29 Monday
- moved T1-MK1 target from beamline
to hotcell  (field from target 15mSv/hr
 IMG_20210330_140744.jpgIMG_20210330_141059.jpgIMG_20210330_141455.jpgT1-MK1_-_2021.pdf 
  291   Thursday, May 05, 2022, 14:39 Adam NewsomeStandard OperationTarget 1TargetT1-MK1 and T2-MK1 profile monitor actuation testThe profile monitor actuation tests were
completed for T1 and T2. No abnormalities
were noticed in vacuum during either test.
  
  228   Tuesday, August 29, 2017, 12:17 Isaac EarleMaintenanceTarget 1TargetT1-MK1 and T2-MK1 Hansen water fittings replaced The #6 male Hansen fittings for the
T1-MK1 and T2-MK1 targets (both currently
stored in the target storage pit) were replaced
  
  5   Thursday, December 22, 2011, 15:27 Isaac EarleMaintenanceTarget 1TargetT1-MK1 Transferred to Storage Pit T1-MK1 target transferred from hot
cell to storage pit position #3 to free up
the hot cell in preparation for shut-down
  
  53   Friday, July 27, 2012, 14:48 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Update- T1MK1 target transferred from storage
pit to hot cell (max field: 4700 
  
  54   Wednesday, August 08, 2012, 14:40 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Complete- Re-wired profile monitor was received
from Probes Group and installed on the target
  
  80   Wednesday, April 17, 2013, 16:45 Isaac EarleStandard OperationTarget 1TargetT1-MK1 Target Leak Checked The T1-MK1 target was leak checked
on April 15th at the T1 monolith by Ron Kuramoto
and Edi Dalla Valle.  No leaks were
  
  125   Friday, November 14, 2014, 17:30 Isaac EarleRepairTarget 1TargetT1-MK1 Target Failure / T1 Target Swap -
On Nov 13 at ~1am the BL1A vacuum went bad.
 The T1 and T2 volumes were isolated
 T1MK2_Nov_14_2014.pdf 
  348   Thursday, May 23, 2024, 17:10 Albert KongStandard OperationTarget 1TargetT1-MK1 Target Exchange (+ leak fix, service panel changes, coupler exchange)On May 23, 2024 two sets of plugs from
position 1 and 3 and a 12mm Be target from
position 5 (serial #109) was removed from
 36x 
  129   Tuesday, December 09, 2014, 14:45 Isaac EarleRepairTarget 1TargetT1-MK1 Repair Status (Pos'n 1 Plug Leak) Between Nov 14 ~ Dec 9 the following
activities took place:
- The leaky 10mm Be target at pos'n
  
  140   Friday, February 06, 2015, 12:39 Isaac EarleRepairTarget 1TargetT1-MK1 Repair Status (Pos'n 1 Plug Leak) The T1-MK1 target is currently in
the hot cell for repair of a leak at position
1.  See E-Log #129 for details on previous
 IMG_4603.JPG 