  38   Thursday, June 07, 2012, 18:08 Isaac EarleRepairTarget 1TargetHot Cell Manipulator Broken Tape A tape snapped on the west side manipulator
today while working on the T1-MK2 target
repair.  The tape travels through to
  
  39   Friday, June 08, 2012, 16:52 Isaac EarleRepairTarget 1TargetBroken Manipulator Tape Update The broken tape on the west side
hot cell manipulator was found to be one
of two "Z motion slave tapes".
  
  40   Friday, June 08, 2012, 17:01 Isaac EarleRepairTarget 1TargetT1-MK2 Leak Repair Update A leak check was performed on the
T1-MK2 target in the hot cell today and confirmed
successful leak-free installation of the
  
  41   Monday, June 18, 2012, 16:27 Isaac EarleRepairTarget 1TargetT1-MK2 Profile and Protect Monitor Electronics Check Bill Rawnsley and Mike Russell performed
a 'blip' test on the T1-MK2 profile monitor
and protect monitors today.  A possible
  
  46   Friday, June 29, 2012, 14:18 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side hot cell
manipulator was completed and the manipulator
was re-installed into the cell.  The
  
  48   Friday, July 06, 2012, 16:03 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair Complete Target elevation measurements and
beam spot plots were completed on the T1-MK2
target and the target is now fully repaired
 T1MK2_-_July_2012.pdf 
  50   Wednesday, July 11, 2012, 17:51 Isaac EarleRepairTarget 1TargetT1 Target Swap BL1A was started yesterday and brought
up to 10
  
  53   Friday, July 27, 2012, 14:48 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Update- T1MK1 target transferred from storage
pit to hot cell (max field: 4700 
  
  54   Wednesday, August 08, 2012, 14:40 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Complete- Re-wired profile monitor was received
from Probes Group and installed on the target
  
  55   Friday, September 07, 2012, 16:35 Isaac EarleRepairTarget 2TargetT2-MK1 Target Repair Completed - Profile monitor wiring harness
checked by Bill Rawnsley using resistor pack
--> OK
  
  56   Friday, September 07, 2012, 16:39 Isaac EarleRepairTarget 1TargetRH Lab Crane Repaired The "west" button on the
crane pendant was broken, and the crane would
occasionally continue moving west when the
  
  58   Tuesday, September 25, 2012, 16:31 Isaac EarleRepairTarget 1TargetT1/T2 Controls - The target control software was
modified to reference the correct pot. look-up
table for the target at T1 (T1-MK1)
  
  59   Friday, September 28, 2012, 15:19 Isaac EarleRepairTarget 1TargetT1-MK2 Delta Seal Leak  After removal of the leaky
target cassette at position 3, plugs were
installed on the target ladder and a leak
  
  60   Wednesday, October 24, 2012, 17:34 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair CompleteThe target ladder was detached, old delta
seals removed, sealing surfaces cleaned using
scotchbrite pad and a dremel tool, and delta
  
  61   Wednesday, October 24, 2012, 17:38 Isaac EarleRepairTarget 2TargetT1 & T2 Target Ladder Control System Status During the recent shutdown for the
T2/M9 joint repair Graham Waters replaced
the corrupted application code on the controller
  
  62   Tuesday, November 13, 2012, 16:26 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side manipulator
in the west hot cell was completed today.
 Part of the repair was done by entering
  
  69   Monday, January 21, 2013, 11:57 Isaac EarleRepairTarget 2TargetFlask Repair On January 15th, when attempting
to move the T2 target from the beam line
to the hot cell, the latch mechanism on the
 IMG_0818.JPGIMG_0824.JPGIMG_0836.JPGIMG_0838.JPG 
  76   Tuesday, April 09, 2013, 17:06 Isaac EarleRepairTarget 1TargetT1 Target Electronics CheckThe T1-MK1 target protect and profile monitor
electronics were 'blip' tested by Bill Rawnsley
on April 5, 2013.  The response from
  
  83   Friday, May 31, 2013, 16:07 Isaac EarleRepairTarget 1TargetPower Supply Fan Failure Today (May 31, 2013) I was contacted
regarding a burning smell and high temperatures
around the T1/T2 controls racks.  Erwin
 IMG_1440.JPGIMG_1441.JPGIMG_1442.JPG 
  84   Tuesday, June 04, 2013, 13:42 Isaac EarleRepairTarget 1TargetT1 and T2 Power Supply Fans Replaced Replacement of the power supply fans
for the T1 Power Supply, T2 Power Supply,
as well as an additional power supply in
  