  RH-Meson Hall, Page 16 of 18  Not logged in ELOG logo
  ID Date Author Category Type Specific Subject Text Attachments
  58   Tuesday, September 25, 2012, 16:31 Isaac EarleRepairTarget 1TargetT1/T2 Controls - The target control software was
modified to reference the correct pot. look-up
table for the target at T1 (T1-MK1)
  
  57   Thursday, September 13, 2012, 18:09 Isaac EarleMaintenanceTarget 1CoolingSeptember Shutdown T1 & T2 MRO The following tasks were performed
during the 2012 September Shutdown:
- Both targets moved to position
 IMG_0624.JPGIMG_0658.JPG 
  56   Friday, September 07, 2012, 16:39 Isaac EarleRepairTarget 1TargetRH Lab Crane Repaired The "west" button on the
crane pendant was broken, and the crane would
occasionally continue moving west when the
  
  55   Friday, September 07, 2012, 16:35 Isaac EarleRepairTarget 2TargetT2-MK1 Target Repair Completed - Profile monitor wiring harness
checked by Bill Rawnsley using resistor pack
--> OK
  
  54   Wednesday, August 08, 2012, 14:40 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Complete- Re-wired profile monitor was received
from Probes Group and installed on the target
  
  53   Friday, July 27, 2012, 14:48 Isaac EarleRepairTarget 1TargetT1-MK1 Target Repair Update- T1MK1 target transferred from storage
pit to hot cell (max field: 4700 
  
  52   Monday, July 23, 2012, 16:01 Isaac EarleDevelopmentTarget 1TargetTarget Flask Seismic Restraint Clamps Installed Installation of the seismic restraint
clamps has been completed for the MK1 and
MK2 target flasks in the Remote Handling
 IMG_0427.JPGIMG_0428.JPGIMG_0429.JPG 
  51   Tuesday, July 17, 2012, 15:30 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 Expansion Tank Level Warnings Added Mike Mouat and Juan Pon have modified
the control system so that the control room
will receive a message when the warning or
  
  50   Wednesday, July 11, 2012, 17:51 Isaac EarleRepairTarget 1TargetT1 Target Swap BL1A was started yesterday and brought
up to 10
  
  49   Monday, July 09, 2012, 17:17 Isaac EarleStandard OperationTarget 1TargetBL1A Start-Up Prep - T1 & T2 targets switched to
"remote" control
 - Both target ladders were moved
  
  48   Friday, July 06, 2012, 16:03 Isaac EarleRepairTarget 1TargetT1-MK2 Target Repair Complete Target elevation measurements and
beam spot plots were completed on the T1-MK2
target and the target is now fully repaired
 T1MK2_-_July_2012.pdf 
  47   Tuesday, July 03, 2012, 13:23 Isaac EarleStandard OperationTarget 2TargetT2 Plug Block Replaced & Beam Blockers TestedThe T2 plug block was replaced and the
M9 and M20 beam blockers were tested.  The
plug block did not interfere with the travel
  
  46   Friday, June 29, 2012, 14:18 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side hot cell
manipulator was completed and the manipulator
was re-installed into the cell.  The
  
  45   Tuesday, June 26, 2012, 09:05 Isaac EarleMaintenanceTarget 1CoolingT1 & T2 Target Water Flow Transducers Serviced The target water outlet flow transducers
on the T1 and T2 cooling packages were serviced
(new shaft, paddle wheel, & o-ring) to
 T1_&_T2_water_flow.jpg 
  44   Friday, June 22, 2012, 13:54 Isaac EarleMaintenanceTarget 2TargetAir Amplifier Rebuild CompleteA full rebuild of the upper air amplifier
was completed.  New anodized aluminum
barrels were installed (replacing the old
  
  43   Friday, June 22, 2012, 13:48 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 Expansion Tank Level Sensor Recording EnabledMike Mouat enabled recording for T1 and
T2 expansion tank warning and trip level
sensors on XTPAGE/XSTRIP.
  
  42   Thursday, June 21, 2012, 13:38 Isaac EarleStandard OperationTarget 2CoolingT2 Water Package Started The T2 water package was reconnected
to the target and started after being shut-off
since April 12, 2012.  The M9 and M20
  
  41   Monday, June 18, 2012, 16:27 Isaac EarleRepairTarget 1TargetT1-MK2 Profile and Protect Monitor Electronics Check Bill Rawnsley and Mike Russell performed
a 'blip' test on the T1-MK2 profile monitor
and protect monitors today.  A possible
  
  40   Friday, June 08, 2012, 17:01 Isaac EarleRepairTarget 1TargetT1-MK2 Leak Repair Update A leak check was performed on the
T1-MK2 target in the hot cell today and confirmed
successful leak-free installation of the
  
  39   Friday, June 08, 2012, 16:52 Isaac EarleRepairTarget 1TargetBroken Manipulator Tape Update The broken tape on the west side
hot cell manipulator was found to be one
of two "Z motion slave tapes".
  
ELOG V2.9.2-2455