Entry  Tuesday, April 16, 2019, 15:35, Keith C Ng, Repair, Other, M9, M9 project post shutdown summary 
Entry  Wednesday, May 22, 2019, 14:25, Isaac Earle, Repair, Target 1, Target, T1-MK2 target moved to HC; T1-MK1 target moved to BL T1-MK1_target_info_sheet_-_Installed_May_21_2019.pdf
Entry  Thursday, January 30, 2020, 17:55, Isaac Earle, Repair, Target 1, Target, T1-MK2 target assembly repair completed in hot cell T1-MK2_-_2020.pdfRHB_8901_Position_1_Entrance_Window.jpgDSC_0047_Position_1_Exit_Window.jpgRHB_8904_Position_4_Entrance_Window.jpgDSC_0022_Position_4_Exit_Window.jpg
Entry  Wednesday, March 04, 2020, 13:42, Ron Kuramoto, Repair, Other, Other, B/L 1A vacuum air leak repair 1AT1_Vacuum_Leak_Repair-Feb2020.pdf
Entry  Tuesday, October 27, 2020, 14:01, Isaac Earle, Repair, Target 2, Cooling, T2 Collimator flow meter paddle wheel replaced 
Entry  Wednesday, July 06, 2022, 12:49, Matthew Gareau, Repair, Other, Other, Helium line damage, and hotcell window oil leaking 
Entry  Wednesday, July 06, 2022, 12:49, Adam Newsome, Repair, Other, Hot Cell, Hot Cell - Helium wand tubing broken 
Entry  Thursday, July 28, 2022, 12:51, Adam Newsome, Repair, Other, Hot Cell, Meson Hall Hot Cell - Nuclear Ventilation Issue 
Entry  Wednesday, January 11, 2023, 15:22, Adam Newsome, Repair, Target 2, Target, T2 Target Ladder Motor - Coupling Failure PXL_20230111_214957143.jpgPXL_20230111_215006211.jpgNew_Coupler_-_T2_Target_Ladder_Motor.PNG
Entry  Monday, January 16, 2023, 15:06, Adam Newsome, Repair, Other, Active Sump, RH Active Sump - draining flow rate sensor repair 
Entry  Tuesday, January 17, 2023, 13:49, Adam Newsome, Repair, Other, Active Sump, Active Sump - Valve V6 Leaking 
Entry  Friday, February 17, 2023, 14:36, Albert Kong, Repair, Other, Water Leak, T1/T2 Water Cooling Package Ball Valve Replacement fdb0d111-3348-483d-a78f-98eabbc45507.jpg
Entry  Monday, March 06, 2023, 16:58, Albert Kong, Repair, Target 2, Cooling, M20 O-Ring Replacement and Valve Replacement Leak Check T1_Mar06_2023.pngT2_Mar06_2023.png
Entry  Thursday, May 11, 2023, 11:28, Adam Newsome, Repair, Target 1, Target, T1-MK1 - broken target ladder motor coupler repaired 
Entry  Thursday, August 03, 2023, 10:33, Albert Kong, Repair, Target 2, Cooling, T2 Expansion Tank Water Level Low (Leak Identified) 7x
Entry  Thursday, February 15, 2024, 12:38, Riley Sykes, Repair, Other, Hot Cell, Indium Extruder Hand Pump 
Entry  Tuesday, May 07, 2024, 13:21, Albert Kong, Repair, Target 2, Cooling, T2 Cooling System Expansion Tank Ultrasonic Level Sensor Repair T2_Level_EPICS_Readout.pdfT2_expansion_tank_sensor_noise_issue_-_4_hr_after_fix.PNG
Entry  Tuesday, October 06, 2015, 14:04, Isaac Earle, Other, Other, Controls, Instructions for loading display screen for T1/T2  
Entry  Thursday, March 24, 2016, 14:46, Isaac Earle, Other, Other, Other, TNF / 500MeV Resin Cans Removed from Storage Pit #1 
Entry  Friday, April 22, 2016, 14:45, Isaac Earle, Other, Other, Active Sump, RH MH Hot Cell Lab Active Sump Water Released 