  671   Monday, June 02, 2014, 11:25 chad fisherSouth Hot-CellStandard OperationTM1UCx #9UCx #9 InstalledUCx #9 has been installed.   
  672   Monday, June 02, 2014, 11:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical checkTM#1 with UC#9 electrical check see attached
pdf for details.
 TM1_UC9_elec_chk_SHC.PDF 
  673   Monday, June 02, 2014, 11:59 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new UC9# target installedChad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will
  
  674   Monday, June 02, 2014, 13:53 Travis CaveConditioning StationStandard OperationTM1UC#9module moveTM#1 with UC#9 has been moved from the
south hot cell to the conditioning station.
  
  675   Monday, June 02, 2014, 15:40 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been startedTM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges.
  
  676   Tuesday, June 03, 2014, 09:12 David WangConditioning StationStandard OperationTM1UC9#TM1 HS line helium pressure test and TM1 electrical check at CSTM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment
 7x 
  677   Monday, June 09, 2014, 10:33 David WangConditioning StationStandard OperationTM1UC9#Stop TM1 and CS trubo pumps and ruff pump.The CS and TM1 is still under vacuum. They
will be vented with argon tomorrow mornig
  
  678   Tuesday, June 10, 2014, 07:57 David WangConditioning StationStandard OperationTM1UC#9 TM1 are vented with argon and disconnected at CS.TM1 will be moved to ITW this morning.   
  679   Tuesday, June 10, 2014, 13:20 Travis CaveITWStandard OperationTM1UC#9module moveTM#1 with UC#9 moved from the conditioning
station to west station.
  
  680   Tuesday, June 10, 2014, 14:02 David WangITWStandard OperationTM1UC9#TM1 and ITW turbo pumps have been started.TM1 has been connected to ITW. It is pumping
down in ITW with 6 turbo-pumps on.
  
  682   Friday, June 13, 2014, 10:33 Anders MjosITWDevelopmentTM1UC#9Flow meter dataCoil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE
  
  683   Tuesday, June 17, 2014, 10:46 David WangITWStandard OperationTM1UC#95 Shielding blocks have been transferred from ITE to ITW.5 shielding blocks have been transferred
from ITE to ITW. ITW is configured to take
proton beam. Argon venting system for ITW
  
  701   Wednesday, July 16, 2014, 10:32 Travis CaveSouth Hot-CellStandard OperationTM1UC#9module moveTM#1 with UC#9 has been moved from the
west target station to the south hot cell.
  
  702   Wednesday, July 16, 2014, 11:28 David WangITWStandard OperationTM1 TM1 had been dsiconnected in ITW.The TM1 and ITW  were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning.
  
  703   Wednesday, July 16, 2014, 13:02 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical checkElectrical check of the TM#1 with UC#9
post beam at the south hot cell.
 TM1_UC9_Elecchk_postbeam.PDF 
  704   Wednesday, July 16, 2014, 13:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#9UCx#9 off Ta onThe UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current
  
  706   Wednesday, July 16, 2014, 14:28 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43Electrical checkTM#1 with Ta#43 electrical check see attached
PDF.
 TM1_Ta43_elec_chk_shc.PDF 
  707   Thursday, July 17, 2014, 09:29 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43module moveTM#1 with Ta#43 has been moved from the
south hot cell to conditioning station.
  
  708   Thursday, July 17, 2014, 10:13 David WangConditioning StationStandard OperationTM1 Leak check on TM1 HS water line with new target installedChad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure:
  
  709   Thursday, July 17, 2014, 11:49 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been startedI connected TM1 at CS. All turbo pumps
have been started. The pumping down is 
good so far.
  