Entry  Tuesday, August 27, 2013, 11:54, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#6, module move 

TM#1 with UCx #6 has been moved to the south hot cell.

Entry  Tuesday, August 27, 2013, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#7, Electrical check TM#1_UC#7__TgtElecChk_SHC_.PDF

TM#1 with UCx#7 electrical check, numbers look good, see PDF for details.

Entry  Tuesday, August 27, 2013, 14:14, Travis Cave, ITW, Standard Operation, TM1, UC#7, module move 

TM#1 with UCx#7 has been moved from the south hot cell to the west target station.

Entry  Wednesday, September 11, 2013, 09:35, David Wang, ITW, Standard Operation, TM1, UCx, 5 shielding blocks have been moved to ITW 

I moved 5 shielding blocks to ITW this morning .I checked the water signals in electrical room before the moving, and everything is fine. The argon venting systemin ITW and electrical room is ready also.

Entry  Tuesday, October 22, 2013, 11:18, Travis Cave, ITW, Standard Operation, TM1, UC#7, module move 

TM#1 with UC#7 has been moved from the ITW to the south west silo.

Entry  Wednesday, October 23, 2013, 09:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#7, module move 

TM#1 with UC #7 has been moved from the south west silo to the south hot cell.

Entry  Wednesday, October 23, 2013, 12:07, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 

TM#1 with no target has been moved back to the south west silo from the south hot cell.

Entry  Thursday, March 06, 2014, 06:28, David Wang, Conditioning Station, Maintenance, TM1, , TM1 had been moved from silo to CS 

TM1 has been successfully moved from silo to CS. The CS vacuum system is connected  to TM1. Turbo pumps on TM1 and CS have been started yesterday afternoon . The starting of TM1 turbos was easy. The pumping down over night is good so far.

Entry  Thursday, March 06, 2014, 12:59, David Wang, Conditioning Station, Maintenance, TM1, , Restart TM1 and CS TPs  

Restarted TM1 and CS turbo pumps after the power off. Everything is fine .

Entry  Thursday, March 06, 2014, 14:12, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 air to vacuum and water lines leak check at CS. 8x

TM1 air to vacuum and water lines leak check at CS are finished this afternoon. The leak detector  is hooked directly to TM1 service cap so the base LR at LD is 0.0xE-9 atm.cc/sec. I sprayed helium to all air to vacuum seal on the service cap, also applied 70 psi to all water lines(except HS) for 2 minutes each. There is no any tiny response had been found on LD. So All TM1 water lines(except HS) and air to vacuum seals are leak free. The HS circuit can not be tested at this time since the VCR caps are not installed. The turbo pumps at CS and TM1 will be turned off before I leave.  See attachment pictures.

Entry  Thursday, March 20, 2014, 08:19, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, module move 

TM#1 with no target moved from the conditioning station to north west silo.

Entry  Monday, June 02, 2014, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 

TM#1 with no target has been moved from the north west silo to the south hot cell.

Entry  Monday, June 02, 2014, 11:25, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #9, UCx #9 Installed 
UCx #9 has been installed.
Entry  Monday, June 02, 2014, 11:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#9, Electrical check TM1_UC9_elec_chk_SHC.PDF

TM#1 with UC#9 electrical check see attached pdf for details.

Entry  Monday, June 02, 2014, 11:59, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new UC9# target installed 

Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure  test on it at CS later.

Entry  Monday, June 02, 2014, 13:53, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#9, module move 

TM#1 with UC#9 has been moved from the south hot cell to the conditioning station.

Entry  Monday, June 02, 2014, 15:40, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started 

TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges.

Entry  Tuesday, June 03, 2014, 09:12, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, TM1 HS line helium pressure test and TM1 electrical check at CS 7x

TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment

Entry  Monday, June 09, 2014, 10:33, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, Stop TM1 and CS trubo pumps and ruff pump. 

The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig

Entry  Tuesday, June 10, 2014, 07:57, David Wang, Conditioning Station, Standard Operation, TM1, UC#9, TM1 are vented with argon and disconnected at CS. 

TM1 will be moved to ITW this morning.