671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed | UCx #9 has been installed. |
|
|
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | TM#1 with UC#9 electrical check see attached
pdf for details. |
|
|
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed | Chad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will |
|
|
674
|
Monday, June 02, 2014, 13:53 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 has been moved from the
south hot cell to the conditioning station. |
|
|
675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | TM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges. |
|
|
676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS | TM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment |
7x |
|
677
|
Monday, June 09, 2014, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | Stop TM1 and CS trubo pumps and ruff pump. | The CS and TM1 is still under vacuum. They
will be vented with argon tomorrow mornig |
|
|
678
|
Tuesday, June 10, 2014, 07:57 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#9 | TM1 are vented with argon and disconnected at CS. | TM1 will be moved to ITW this morning. |
|
|
679
|
Tuesday, June 10, 2014, 13:20 |
Travis Cave | ITW | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 moved from the conditioning
station to west station. |
|
|
680
|
Tuesday, June 10, 2014, 14:02 |
David Wang | ITW | Standard Operation | TM1 | UC9# | TM1 and ITW turbo pumps have been started. | TM1 has been connected to ITW. It is pumping
down in ITW with 6 turbo-pumps on. |
|
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data | Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE |
|
|
683
|
Tuesday, June 17, 2014, 10:46 |
David Wang | ITW | Standard Operation | TM1 | UC#9 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW. ITW is configured to take
proton beam. Argon venting system for ITW |
|
|
701
|
Wednesday, July 16, 2014, 10:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 has been moved from the
west target station to the south hot cell. |
|
|
702
|
Wednesday, July 16, 2014, 11:28 |
David Wang | ITW | Standard Operation | TM1 | | TM1 had been dsiconnected in ITW. | The TM1 and ITW were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning. |
|
|
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | Electrical check of the TM#1 with UC#9
post beam at the south hot cell. |
|
|
704
|
Wednesday, July 16, 2014, 13:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#9 | UCx#9 off Ta on | The UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current |
|
|
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check | TM#1 with Ta#43 electrical check see attached
PDF. |
|
|
707
|
Thursday, July 17, 2014, 09:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move | TM#1 with Ta#43 has been moved from the
south hot cell to conditioning station. |
|
|
708
|
Thursday, July 17, 2014, 10:13 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure: |
|
|
709
|
Thursday, July 17, 2014, 11:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | I connected TM1 at CS. All turbo pumps
have been started. The pumping down is
good so far. |
|