ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
|
671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed |
UCx #9 has been installed. |
|
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
TM#1 with UC#9 electrical check see attached pdf for details. |
Attachment 1: TM1_UC9_elec_chk_SHC.PDF
|
|
|
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed |
Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure test on it at CS later. |
|
674
|
Monday, June 02, 2014, 13:53 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#9 | module move |
TM#1 with UC#9 has been moved from the south hot cell to the conditioning station. |
|
675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started |
TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges. |
|
676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS |
TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment |
Attachment 1: 001.JPG
|
|
Attachment 2: 002.JPG
|
|
Attachment 3: 003.JPG
|
|
Attachment 4: 004.JPG
|
|
Attachment 5: 005.JPG
|
|
Attachment 6: 006.JPG
|
|
Attachment 7: TM1_UC9#_E-check_at_CS.pdf
|
|
|
677
|
Monday, June 09, 2014, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | Stop TM1 and CS trubo pumps and ruff pump. |
The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig |
|
678
|
Tuesday, June 10, 2014, 07:57 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#9 | TM1 are vented with argon and disconnected at CS. |
TM1 will be moved to ITW this morning. |
|
679
|
Tuesday, June 10, 2014, 13:20 |
Travis Cave | ITW | Standard Operation | TM1 | UC#9 | module move |
TM#1 with UC#9 moved from the conditioning station to west station. |
|
680
|
Tuesday, June 10, 2014, 14:02 |
David Wang | ITW | Standard Operation | TM1 | UC9# | TM1 and ITW turbo pumps have been started. |
TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on. |
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data |
Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE receving p+
|
Temp [C] |
Flow [lpm] |
HS |
30.0 |
6.3 |
COIL |
30.2 |
11.6 |
Monday, June 16, 2014, 09:30: p+ off for maintenance day
|
Temp [C] |
Flow [lpm] |
HS |
32.7 |
6.3 |
COIL |
27.7 |
11.6 |
Thursday, June 19, 2014, 16:14: 10 uA p+ on ITW
|
Temp [C] |
Flow [lpm] |
HS |
31.9 |
7.2 |
COIL |
27.6 |
13.1 |
Tuesday, July 08, 2014, 10:32:
Data uploaded to DocuShare |
|
683
|
Tuesday, June 17, 2014, 10:46 |
David Wang | ITW | Standard Operation | TM1 | UC#9 | 5 Shielding blocks have been transferred from ITE to ITW. |
5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also. |
|
701
|
Wednesday, July 16, 2014, 10:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | module move |
TM#1 with UC#9 has been moved from the west target station to the south hot cell. |
|
702
|
Wednesday, July 16, 2014, 11:28 |
David Wang | ITW | Standard Operation | TM1 | | TM1 had been dsiconnected in ITW. |
The TM1 and ITW were vented with argon gas last night. TM1 had been disconnected in ITW this morning. |
|
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
Electrical check of the TM#1 with UC#9 post beam at the south hot cell. |
Attachment 1: TM1_UC9_Elecchk_postbeam.PDF
|
|
|
704
|
Wednesday, July 16, 2014, 13:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#9 | UCx#9 off Ta on |
The UCx#9 target has been revomed from the target module...leg A was broken as suspected.
Ta#42 has been installed. High current connection fasteners torqued to 150 in lbs. |
|
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check |
TM#1 with Ta#43 electrical check see attached PDF. |
Attachment 1: TM1_Ta43_elec_chk_shc.PDF
|
|
|
707
|
Thursday, July 17, 2014, 09:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move |
TM#1 with Ta#43 has been moved from the south hot cell to conditioning station. |
|
708
|
Thursday, July 17, 2014, 10:13 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed |
Chad and I leak checked TM1 HS waterline with new target installed at SHC. The LD base LR:0.0xE-9atm.cc/sec, base pressure: 0.0xE-4 torr. Chad sprayed helium on both VCR fittings and flushed helium around the target. No response has been found on leak detector. The target HS line is leak tight so far. I will do helium pressure test on this line at CS on next Monday. |
|
709
|
Thursday, July 17, 2014, 11:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started |
I connected TM1 at CS. All turbo pumps have been started. The pumping down is good so far. |