  671   Monday, June 02, 2014, 11:25 chad fisherSouth Hot-CellStandard OperationTM1UCx #9UCx #9 Installed
UCx #9 has been installed.
  672   Monday, June 02, 2014, 11:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical check

TM#1 with UC#9 electrical check see attached pdf for details.

Attachment 1: TM1_UC9_elec_chk_SHC.PDF
TM1_UC9_elec_chk_SHC.PDF
  673   Monday, June 02, 2014, 11:59 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new UC9# target installed

Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure  test on it at CS later.

  674   Monday, June 02, 2014, 13:53 Travis CaveConditioning StationStandard OperationTM1UC#9module move

TM#1 with UC#9 has been moved from the south hot cell to the conditioning station.

  675   Monday, June 02, 2014, 15:40 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been started

TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges.

  676   Tuesday, June 03, 2014, 09:12 David WangConditioning StationStandard OperationTM1UC9#TM1 HS line helium pressure test and TM1 electrical check at CS

TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment

Attachment 1: 001.JPG
001.JPG
Attachment 2: 002.JPG
002.JPG
Attachment 3: 003.JPG
003.JPG
Attachment 4: 004.JPG
004.JPG
Attachment 5: 005.JPG
005.JPG
Attachment 6: 006.JPG
006.JPG
Attachment 7: TM1_UC9#_E-check_at_CS.pdf
TM1_UC9#_E-check_at_CS.pdf
  677   Monday, June 09, 2014, 10:33 David WangConditioning StationStandard OperationTM1UC9#Stop TM1 and CS trubo pumps and ruff pump.

The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig

  678   Tuesday, June 10, 2014, 07:57 David WangConditioning StationStandard OperationTM1UC#9 TM1 are vented with argon and disconnected at CS.

TM1 will be moved to ITW this morning.

  679   Tuesday, June 10, 2014, 13:20 Travis CaveITWStandard OperationTM1UC#9module move

TM#1 with UC#9 moved from the conditioning station to west station.

  680   Tuesday, June 10, 2014, 14:02 David WangITWStandard OperationTM1UC9#TM1 and ITW turbo pumps have been started.

TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on.

  682   Friday, June 13, 2014, 10:33 Anders MjosITWDevelopmentTM1UC#9Flow meter data

Coil not used on TM1. Data and plots on DocuShare

Friday, June 13, 2014, 10:30. ITE receving p+

  Temp [C] Flow [lpm]
HS 30.0 6.3
COIL  30.2 11.6

 Monday, June 16, 2014, 09:30: p+ off for maintenance day

  Temp [C] Flow [lpm]
HS 32.7 6.3
COIL  27.7 11.6

 Thursday, June 19, 2014, 16:14: 10 uA p+ on ITW

  Temp [C] Flow [lpm]
HS 31.9 7.2
COIL  27.6 13.1

Tuesday, July 08, 2014, 10:32:

Data uploaded to DocuShare

  683   Tuesday, June 17, 2014, 10:46 David WangITWStandard OperationTM1UC#95 Shielding blocks have been transferred from ITE to ITW.

5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also.

  701   Wednesday, July 16, 2014, 10:32 Travis CaveSouth Hot-CellStandard OperationTM1UC#9module move

TM#1 with UC#9 has been moved from the west target station to the south hot cell.

  702   Wednesday, July 16, 2014, 11:28 David WangITWStandard OperationTM1 TM1 had been dsiconnected in ITW.

The TM1 and ITW  were vented with argon gas last night. TM1 had been disconnected in ITW this morning.

  703   Wednesday, July 16, 2014, 13:02 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical check

Electrical check of the TM#1 with UC#9 post beam at the south hot cell.

Attachment 1: TM1_UC9_Elecchk_postbeam.PDF
TM1_UC9_Elecchk_postbeam.PDF
  704   Wednesday, July 16, 2014, 13:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#9UCx#9 off Ta on

The UCx#9 target has been revomed from the target module...leg A was broken as suspected.

Ta#42 has been installed. High current connection fasteners torqued to 150 in lbs.

  706   Wednesday, July 16, 2014, 14:28 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43Electrical check

TM#1 with Ta#43 electrical check see attached PDF.

Attachment 1: TM1_Ta43_elec_chk_shc.PDF
TM1_Ta43_elec_chk_shc.PDF
  707   Thursday, July 17, 2014, 09:29 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43module move

TM#1 with Ta#43 has been moved from the south hot cell to conditioning station.

  708   Thursday, July 17, 2014, 10:13 David WangConditioning StationStandard OperationTM1 Leak check on TM1 HS water line with new target installed

Chad and I leak checked TM1 HS waterline with new target installed at SHC. The LD base LR:0.0xE-9atm.cc/sec, base pressure: 0.0xE-4 torr. Chad sprayed helium on both VCR fittings and flushed helium around the target. No response has been found on leak detector. The target HS line is leak tight so far. I will do helium pressure test on this line at CS on next Monday.

  709   Thursday, July 17, 2014, 11:49 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been started

I connected TM1 at CS. All turbo pumps have been started. The pumping down is  good so far.