Entry  Wednesday, June 12, 2024, 10:18, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 is moved from TCS to silo this morning 
TM2 is moved from TCS to silo this morning. The move is smooth. 
Entry  Monday, June 10, 2024, 11:02, Frank Song, ITW, Standard Operation, TM4, UCx#45, shielding blocks transfer 
 5 shielding blocks have been transferred from ITE to ITW. 
Doc # 181007
 
Entry  Wednesday, June 05, 2024, 11:32, David Wang, Conditioning Station, Standard Operation, , , TCS water system filters have been changed.  
TCS water system  five filters were changed yesterday by plant group Dan.T. Service labels on filters are updated.  No water leak after job.
Entry  Wednesday, June 05, 2024, 11:25, David Wang, Conditioning Station, Standard Operation, , , refilled TCS:TK2 to 27.4 inches.  
refilled TCS:TK2 to 27.4 inches to compensate water lost during THC filters change. 
Entry  Tuesday, June 04, 2024, 11:44, Carla Babcock, South Hot-Cell, Development, , empty LP FEBIAD, investigation of cathode short on empty LP FEBIAD MicrosoftTeams-image_(58).png
On May 30 Aaron, Chad and I removed the empty LP FEBIAD target from the SHC into the anteroom to attempt to find out the source of the cathode short
observed online. The behaviour online was that a connection of several hundred ohms was preventing the cathode from being biased. The resistance was still
enough to allow us to run in anode mode, which is what we did. I am not sure where the cathode short came from but there was significant sparking on this
Entry  Thursday, May 30, 2024, 11:08, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 was moved from silo to TCS yesterday morning. 
TM2 was moved from silo to TCS yesterday morning. The move is smooth.    TCS vacuum system was started after. TCS and TM2 pumping down
is ok so far. 
Entry  Tuesday, May 28, 2024, 13:49, Frank Song, ITW, Standard Operation, TM4, UCx#45, Module Connection TM4_with_UCx#45_connection_in_ITW_20240528.pdf
 TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with.
Entry  Tuesday, May 28, 2024, 10:13, David Wang, ITW, Standard Operation, TM4, UCx#45, Tm4 has been moved from TCS to ITW.  
Tm4 has been moved from TCS to ITW.  the move is smooth. 
Entry  Tuesday, May 28, 2024, 07:45, David Wang, Conditioning Station, Standard Operation, TM4, UCx#45, TCS was argon vented this morning between 6:00 and 7:30am.  
TCS was argon vented this morning between 6:00 and 7:30am for TM4 moving to ITW.
Entry  Friday, May 24, 2024, 08:10, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#45, UCx#45 Installation 
On Wednesday, May 22, 2024 UCx#45 was installed on TM4 in the SHC. Installation was normal other then minor issue with the multipin connector drive screw
not engaging and/or driving properly. This was remedied by loosening the left guide bolt slightly (1/2 turn). After loosening the multipin drove in and
seated correctly (verified by camera). High current fasteners torqued to 130 in lbs.
Entry  Thursday, May 23, 2024, 11:10, David Wang, MAA, Standard Operation, , , BL2A MAA ASU test. 
MCR Travis Curucz and I finished BL2A MAA ASU test per document 154779. everything works fine. Travis kept  the test document. 
Entry  Thursday, May 23, 2024, 10:59, Frank Song, ITE, Standard Operation, TM3, UCx#44, shielding blocks transfer 
 the five shielding blocks have been moved from storage area to ITE and is ready for beam delivery.
submitted WP# I2024-05-22--1
actived  WP # I2024-05-23-4
Entry  Wednesday, May 22, 2024, 12:43, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, electrical check and leak check were done on TM4 UCx#45 target at SHC. Scanned_from_a_Xerox_Multifunction_Printer.pdf
electrical check and leak check were done on TM4 UCx#45 target at SHC.  everything is ok. See attachment
helium pressure test on TM4 HS line at TCS is done.   No leak.
Entry  Wednesday, May 22, 2024, 12:32, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, TM4 has been moved from SHC to TCS. 
TM4 has been moved from SHC to TCS. the move is smooth. 
Entry  Tuesday, May 21, 2024, 11:46, David Wang, ITW, Standard Operation, TM4, LP febiad empty. , Tm4 has been moved from ITW to SHC. 
Tm4 has been moved from ITW to SHC. the move is smooth. 
Entry  Tuesday, May 21, 2024, 09:50, David Wang, ITW, Standard Operation, TM4, Lp Febiad empty, Tm4 has been disconnected in ITW. TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf
Tm4 has been disconnected in ITW per document 141576. Checklist is done.  HS line is purged.
Entry  Wednesday, May 15, 2024, 10:06, Travis Cave, Spent Target Vault, Standard Operation, , UC#38,40 Ta#62,63 SiC#44, Targets moved to the mini vault. Mini_Vault_Index_2024-05-15.pdfTarget_Index_2024-05-15.pdf
 Targets UC#38,40 Ta#62,63 SiC#44 have been moved from the spent target vault to the mini vault in preparation for F-308 loading. See attached PDFs
for details.
Entry  Tuesday, May 14, 2024, 15:27, Carla Babcock, ITE, Development, TM3, UCx#44, TM3 conditioning and testing in ITE Screenshot_from_2024-05-14_10-47-22.png
Tuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will see if the HV cage in the pit can hold 60kV or not.
At around 50kV the bias read current starts to get jumpy. Doesn't look like its an issue for the voltage, but definitely instability increases.
Entry  Monday, May 13, 2024, 09:28, David Wang, ITE, Standard Operation, TM4, UCx#44, ITE water signal annual interlock check. 
ITE water signal annual interlock check is done. Ed helped me on this check. Everything works normal. 
Entry  Friday, May 10, 2024, 09:04, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been connected in ITE.  Scanned_from_a_Xerox_Multifunction_Printer.pdf
Tm3 has been connected in ITE.  see attachment.