885
|
Monday, April 13, 2015, 08:59 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - June 26 2015 | See attachments 1, 2 for target hall schedule
from 07 April to 26 June 2015. The first
TM1 move which is scheduled on 16 April 2015 |
|
|
890
|
Monday, April 20, 2015, 07:27 |
David Wang | ITE | Standard Operation | TM4 | | Target Hall Scheduled Activities April 07 - June 26 2015 | Weekly target hall schedule update.2015-04-20
weekly target hall schedule update
2015-04-27 attachments 3,4. |
|
|
900
|
Monday, April 27, 2015, 17:09 |
Grant Minor | ITE | Development | TM2 | | TM2 - New Source Tray - Water Block Seal Groove Inspection Report | The water blocks soldered to the TM2 cooling
lines (see Ref. Assy. ITA6144) were inspected.
See attached inspection reports and |
|
|
921
|
Monday, June 01, 2015, 11:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module moved | TM#4 with Ta#45 has been moved from the
east target station to the south hot cell. |
|
|
938
|
Wednesday, June 10, 2015, 10:02 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#31 | Module moved | TM#4 has been moved from the conditioning
station to the east target station. |
|
|
939
|
Wednesday, June 10, 2015, 11:49 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. At this
stage, water is supplied to TM4 only. We
checked the TM4 water signals from electrical |
|
|
940
|
Wednesday, June 10, 2015, 13:17 |
David Wang | ITE | Standard Operation | TM1 | | Target Hall Scheduled Activities April 07 - July 26 2015 | Weekly update the schedule after some jobs
have been finished in this week. |
|
|
954
|
Friday, June 19, 2015, 11:52 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
|
999
|
Thursday, July 16, 2015, 07:38 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 07 2015 | Update the TH schedule according to present
TM2 refurbishment process. See attachments
1,2 |
|
|
1006
|
Tuesday, July 21, 2015, 12:29 |
David Wang | ITE | Maintenance | | | target pit Hepa filter | Target pit Hepa filter has been replaced
today. There is 500 counts on swipe which
is taken inside of the replaced filter. The |
|
|
1010
|
Thursday, July 23, 2015, 10:23 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 | Update Target Hall schedule after the changing
on TM2 process. See attachment 1,2 |
|
|
1011
|
Friday, July 24, 2015, 10:04 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been moved from ITE to block storage area. | Dan and I moved 5 shielding blocks from
ITE to block storage area. The move is smooth. |
|
|
1016
|
Monday, July 27, 2015, 15:34 |
David Wang | ITE | Standard Operation | TM4 | | Leak check on TM4 HS water line with new UCX target. at SHC | Chad and I leak checked the HS line at
SHC after UCX target installation. On first
round helium spray, one of VCR fitting has |
|
|
1020
|
Tuesday, July 28, 2015, 10:17 |
David Wang | ITE | Repair | | | ITE TP4 has been replaced | Tony and I replaced the ITE TP4 turbo pump
today. The pumping time on controller has
been reset to 0. The replaced broken |
|
|
1025
|
Wednesday, July 29, 2015, 08:59 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved | TM#4 with UC#13 has been moved from the
conditioning station to the east target station. |
|
|
1026
|
Wednesday, July 29, 2015, 10:14 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. We checked
all water signals on ITE cooling circuits.
Everything is good. |
|
|
1028
|
Friday, July 31, 2015, 09:47 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 | Weekly update of Target Hall schedule after
so many jobs have been finished in this week.
See attachment 1, 2 |
|
|
1031
|
Friday, August 07, 2015, 10:01 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 19 2015 | Weekly update target hall schedule and
activities. See attachment 1,2
Update and extend Target Hall schedule |
|
|
1062
|
Wednesday, September 02, 2015, 09:26 |
David Wang | ITE | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | I attach new Target Hall schedules here
for 2015 fall and winter runs (beam schedule
129). The TH excel sheet schedule for beam |
|
|
1072
|
Tuesday, September 22, 2015, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved | TM#4 with UC#13 has been moved from the
east target station to the south hot cell. |
|