Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1011
Entry time:
Friday, July 24, 2015, 10:04
Author:
David Wang
Category:
ITE
Type:
Standard Operation
Module:
Target/Number:
Subject:
5 Shielding blocks have been moved from ITE to block storage area.
Dan and I moved 5 shielding blocks from ITE to block storage area. The move is smooth.
ELOG V2.9.2-2455