Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 954     Entry time: Friday, June 19, 2015, 11:52
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: SiC #31 
Subject: 5 Shielding blocks have been transferred from ITW to ITE. 

5 shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam.

ELOG V2.9.2-2455