Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 900     Entry time: Monday, April 27, 2015, 17:09
Author: Grant Minor 
Category: ITE 
Type: Development 
Module: TM2 
Target/Number:  
Subject: TM2 - New Source Tray - Water Block Seal Groove Inspection Report 

The water blocks soldered to the TM2 cooling lines (see Ref. Assy. ITA6144) were inspected.

See attached inspection reports and drawings.

It was found that only 18% of the seal groove diameters and 55% of the depths were in spec.

The source tray must be tested on the test stand with c-seals to ensure that these blocks will seal properly on the module.

Attachment 1: IMG_1859.JPG  3.323 MB  | Show | Hide all
Attachment 2: TM2_New_Source_Tray_Water_Block_Inspection_Results_24_April_2015.pdf  79 kB  | Show | Hide all
Attachment 3: TM2_water_block_inspect_24Apr2015.pdf  862 kB  | Show | Hide all
Attachment 4: TM2_New_Source_Tray_Water_Block_Inspection_Results_April_2015.xlsx  12 kB
ELOG V2.9.2-2455