620
|
Wednesday, March 12, 2014, 16:33 |
Keith C Ng | ITE | Repair | | | 2A3 window removal and replacement | prep'ed area for work:
- removed shield plug from window
clamp area |
    |
621
|
Thursday, March 13, 2014, 07:35 |
David Wang | ITW | Standard Operation | TM4 | | TM4 and ITW turbo pumps have been started | I connected ITW vacuum system to
TM4. TM4 and ITW turbo pumps have been started
successfully. The pumping down is good so |
|
622
|
Thursday, March 13, 2014, 16:23 |
Keith C Ng | ITE | Repair | | | 2a3 window - inspection | Video inspected 2a3 window joint this morning.
Screenshots from video showing debris
forming around aluminum cradle and brown/red |
 |
623
|
Monday, March 17, 2014, 15:39 |
Keith C Ng | ITE | Repair | | | 2a3 window - prep and clean | Cleaned top of the ITE vacuum flange and
top of window clamp. Attempted to clean the
bellows/beam pipe through the wall, mostly |
|
624
|
Tuesday, March 18, 2014, 16:01 |
Keith C Ng | ITE | Repair | | | 2a3 window - prep and clean | Continued with vacuuming inside wall penetration
to remove debris. Changed filter bag in nilfisk
vacuum, left old filter in place however |
 |
625
|
Wednesday, March 19, 2014, 15:46 |
David Wang | ITW | Standard Operation | TM4 | | TM4 and ITE air to vacuum leak check and TM4 water lines helium test. | With TM4 located in ITW, All air to vacuum
seals on ITW primary and secondary
vacuum vessels have been leak checked |
7x |
626
|
Wednesday, March 19, 2014, 16:48 |
Keith C Ng | ITE | Repair | | | 2a3 window - beam tube removal | Today:
1) Vaccumed top and around clamp.
Disconnected clamp from flanges and removed |
11x |
628
|
Friday, March 21, 2014, 16:49 |
Keith C Ng | ITE | Repair | | | 2a3 window - tank flange inspection | Today:
1) Cleaned flange with methanol and
cotton glove, appears to be clean. |
   |
638
|
Friday, April 04, 2014, 14:59 |
Keith C Ng | ITE | Maintenance | | | measurement of new beam tube section | R. Kuramoto and A. Laxdal measured the
distance from the 2A tunnel to the tank flange
of ITE. The new fabricated beam pipe with |
|
639
|
Friday, April 04, 2014, 16:59 |
Anders Mjos | ITW | Development | | | Flow meters installed on Heat Shield and Coil water return | David W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected |
|
644
|
Wednesday, April 09, 2014, 11:10 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 heat shield circuit leack check at SHC | This Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec, |
|
646
|
Friday, April 11, 2014, 11:35 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Helium pressure test on TM3 HS water line with new Ta target. at CS | The helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response |
6x |
647
|
Friday, April 11, 2014, 18:17 |
Keith C Ng | ITE | Repair | | | 2a3 window - install | Today:
1) Installed new cradle and shortened
beam pipe section in wall penetration. |
|
648
|
Monday, April 14, 2014, 11:57 |
Travis Cave | ITE | Standard Operation | | | entrance module move | The East Entrance module has been moved
from the south west silo to the east target
station. The move went well. |
|
649
|
Monday, April 14, 2014, 13:58 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | I reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE |
|
652
|
Wednesday, April 16, 2014, 17:08 |
Keith C Ng | ITE | Repair | | | 2a3 window - He leak check | Helium leak checked 2a3 window after installing
using remote line:
- There was a leak found between |
|
655
|
Monday, May 05, 2014, 13:05 |
David Wang | ITE | Repair | TM3 | | ITE target module flange seal has been replaced. | ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before |
   |
656
|
Monday, May 05, 2014, 13:11 |
David Wang | ITE | Repair | TM3 | | ITE Entrance module has been disconnected. | ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures. |
    |
657
|
Tuesday, May 06, 2014, 14:05 |
Travis Cave | ITE | Standard Operation | | | module move | The entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules |
|
658
|
Wednesday, May 07, 2014, 10:08 |
David Wang | ITE | Repair | TM3 | | ITE entrance module flange seal had been replaced. | ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the |
7x |