Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 649     Entry time: Monday, April 14, 2014, 13:58
Author: David Wang 
Category: ITE 
Type: Repair 
Module:  
Target/Number:  
Subject: Reconnected ITE entrance module 

I reconnected the entrance module back to the ITE station. All diagnostic cables, turbo- pump, air lines, water lines on ITE entrance module and BL2A3 window are connected back.

ELOG V2.9.2-2455