Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 655     Entry time: Monday, May 05, 2014, 13:05
Author: David Wang 
Category: ITE 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: ITE target module flange seal has been replaced. 

ITE target module flange seal has been replaced.The flan surface and the o-ring groove have been cleaned with Acetone before the new seal is installed. See attached picture.

Attachment 1: 004.JPG  2.944 MB  | Show | Hide all
Attachment 2: 008.JPG  2.881 MB  | Show | Hide all
Attachment 3: 008.JPG  2.881 MB  | Show | Hide all
Attachment 4: 007.JPG  3.236 MB  | Show | Hide all
ELOG V2.9.2-2455