Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 620     Entry time: Wednesday, March 12, 2014, 16:33
Author: Keith C Ng 
Category: ITE 
Type: Repair 
Module:  
Target/Number:  
Subject: 2A3 window removal and replacement 

prep'ed area for work:

- removed shield plug from window clamp area

- inspected clamp from tunnel side and from top of target station: video recorder was not working, will try again tomorrow.

- corrosion seen on beam pipe cradles, see photos. corrosion also seen on beampipe, clamp and vacuum tank. will try to vaccuum loose rust tomorrow.

note: gamma spec of rust, white powder from RPG located in \\trwindata\groups\remote handling\Documents\2014\2A3 Window folder (added pdfs as attachments 2014 mar 4)

 

20140312_2a3window_RHB_6676.JPG

20140312_2a3window_RHB_6682.JPG

 

Attachment 3: 2a_bp_sw1_white_powder_under_w11.PDF  8 kB  Uploaded Friday, April 04, 2014, 16:18  | Show | Hide all
Attachment 4: 2a_bp_sw2_white_powder_under_w11.PDF  7 kB  Uploaded Friday, April 04, 2014, 16:18  | Show | Hide all
Attachment 5: 2a_bp_sw3_rust_w11.PDF  7 kB  Uploaded Friday, April 04, 2014, 16:18  | Show | Hide all
ELOG V2.9.2-2455