Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 657     Entry time: Tuesday, May 06, 2014, 14:05
Author: Travis Cave 
Category: ITE 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: module move 

The entrance module was out a new seal went in and then the entrance module went back, and then TM#3 went back. So all modules are now back in place in the east target station.

ELOG V2.9.2-2455