Entry  Wednesday, May 21, 2014, 13:56, Travis Cave, Spent Target Vault, Standard Operation, , , Spent target assay Vault_Storage_May_22_2014.pdf
All targets in the vault have been assayed and measured. Results will be posted soon. 
Results of assay are now attached in a new layout.
Entry  Tuesday, May 27, 2014, 09:42, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 Maintenance 
All of the serviced F-308's have been moved to the South Hot cell area.
Entry  Monday, June 02, 2014, 11:59, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new UC9# target installed 
Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure  test
on it at CS later.
Entry  Monday, June 02, 2014, 15:40, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started 
TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges.
Entry  Thursday, June 12, 2014, 09:42, Travis Cave, Spent Target Vault, Standard Operation, , , Targets moved from mini storage to F-308s Vault_Storage_June_12_2014.pdfMini_Vault_Storage_June_12_2014.pdf
Five targets have been moved from the spent target storage to the mini storage. The targets that were moved are UCx #'s 6,7,8 , SiC #28, and Nb #6.
Entry  Tuesday, June 24, 2014, 11:33, maicodallavalle, Spent Target Vault, Standard Operation, , , F-308 Maintenance 
Five F - 308 flasks containing five ISAC spent targets were moved from the anteroom into the south hot cell area. When the F - 308's were in the south
hot cell area the rest of the bolts were installed on all the top covers. All the bolts were torqued and all the cable locks were also installed. All F
- 308's  were then moved into the Active Services Area.
Entry  Thursday, June 26, 2014, 10:57, David Wang, South Hot-Cell, Standard Operation, TM3, , Leak check on TM3 HS water line with new target. installed. 
Chad and I leak checked the TM3 HS water line with new target installed.  No leak has been found during the check. Leak detector base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4 torr. The line will be helium pressurized at CS later.
Entry  Friday, June 27, 2014, 10:16, David Wang, Conditioning Station, Standard Operation, TM3, , TM3 HS water lines helium pressure test. at CS 
TM3 HS water line helium pressure test is done at CS. 70 psi helium , 3 minutes.Base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr.  No response.
The line is leak free.
    Reply  Friday, June 27, 2014, 11:26, Anders Mjos, South Hot-Cell, Standard Operation, TM3, , Ground Electrode Cleaned TM3_GND_Electrode_Cleaning.pdf


    
        
            Anders Mjos wrote:
        
        
            
            See attached pdf and DocuShare for
Entry  Wednesday, July 02, 2014, 14:29, David Wang, ITE, Standard Operation, , , Reconnected TM3 in ITE. 
I reconnected TM3 in ITE. All turbo pumps have been started. The water supply to TM3 only in ITE. The HV keys are back to electrical room.
Entry  Tuesday, July 08, 2014, 09:57, David Wang, ITE, Standard Operation, TM3, , 5 Shielding blocks have been transferred from ITW to ITE. 
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam.
Entry  Wednesday, July 16, 2014, 11:28, David Wang, ITW, Standard Operation, TM1, , TM1 had been dsiconnected in ITW. 
The TM1 and ITW  were vented with argon gas last night. TM1 had been disconnected in ITW this morning.
Entry  Thursday, July 17, 2014, 10:13, David Wang, Conditioning Station, Standard Operation, TM1, , Leak check on TM1 HS water line with new target installed 
Chad and I leak checked TM1 HS waterline with new target installed at SHC. The LD base LR:0.0xE-9atm.cc/sec, base pressure: 0.0xE-4 torr. Chad sprayed
helium on both VCR fittings and flushed helium around the target. No response has been found on leak detector. The target HS line is leak tight so far.
I will do helium pressure test on this line at CS on next Monday.
Entry  Thursday, July 17, 2014, 11:49, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started 
I connected TM1 at CS. All turbo pumps have been started. The pumping down is  good so far.
Entry  Monday, July 21, 2014, 13:11, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS. 
The TM1 HS line is  pressure tested this morning with 70 psi helium  at CS. No response has been found on leak detector.
Entry  Tuesday, July 22, 2014, 07:32, David Wang, Conditioning Station, Standard Operation, TM1, , Stop TM1 and CS turbo pumps and ruff pump. 
Stop TM1 and CS turbo pumps and ruff pump. TM1 is disconnect at CS. It will be vented tomorrow morning and moved to ITW.
Entry  Wednesday, July 23, 2014, 13:36, David Wang, ITW, Standard Operation, TM1, , TM1 in ITW. 
  TM1 has been connected in ITW . The new roughing pump replaced on last  Friday works good. I started all turbo pumps in ITW. The ITW TP1  controller
was broken during the starting time. Dimo and I changed a new  controller for ITW TP1 in electrical room. The pumping down is good so  far. ITW water supplies
to TM1 only.       
Entry  Monday, July 28, 2014, 14:37, David Wang, Conditioning Station, Development, TM2, , helium pressure test on TM2 tube heater +(D)and -(C)water lines. 7x

    TM2 installed in Conditioning Station
    Varian Leak detector connected directly to Target Module 2         Service cap.

   Vacuum draw in Target Station with both module turbo pumps
    Leak detector baseline normal (10^-4 Torr, 10^-9 Std cc/s He)
  
 Since no Source tray is installed, and tube heater supply         conductor is blanked off in target enclosure, it was necessary         to test both
Entry  Monday, July 28, 2014, 14:45, David Wang, Conditioning Station, Development, TM2, , turned off TM2 and CS turbo pumps. 
I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning.
Entry  Monday, July 28, 2014, 17:26, Ron Kuramoto, ITW, Repair, , , ITW:IV5 Air leak repair DSCN0087.JPG20140728_142855_-_small.jpg20140728_143202_-_small.jpg
Air leak was found at the Solenoid control valve located in the Pre-Separator & DB0 room.  The gasket between
the solenoid body and its manifold block was broken, see attached photos. The gasket and solenoid body were replaced. Air was turned back on
to IV5 (B/L gate valve) with no apparent air leaks. The gate valve was actuated open & closed from the control room seeing both limits successfully.