Entry  Thursday, September 08, 2022, 07:20, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check TM2_with_UCx#39_E_Check.png

 An electrical check was done on NHC yesterday.

Entry  Thursday, September 08, 2022, 09:06, David Wang, Conditioning Station, Standard Operation, TM2, UCx#39, HS line helium pressure test. 

TM2 with UCX#39 HS line helium pressure test is done at TCS. 70 psi helium 3minutes. No leak @0.0XE-9 atm.cc/sec.

Entry  Tuesday, September 13, 2022, 14:10, Frank Song, ITW, Standard Operation, TM2, UCx#39, Module Connection TM2_with_UCx#39_connection_in_ITW.png

 TM2 with UCx#39 is connected in ITW.

Entry  Tuesday, November 01, 2022, 12:37, Frank Song, ITW, Standard Operation, TM2, UCx#39, disconnection TM2_with_UCx39_disconnection_in_ITW.png

 TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC.

Entry  Tuesday, November 01, 2022, 12:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png

 TM2 with spent target UCx#39 had an electric check in NHC.

After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm.  A to P is still short.

Entry  Wednesday, November 02, 2022, 11:11, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#40, electrical check TM2_with_UCx40_electrical_check_on_NHC.png

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Entry  Thursday, November 03, 2022, 13:15, David Wang, Conditioning Station, Standard Operation, TM2, UCx#40, HS line helium pressure test. TM4 with UCx#40at TCS. 

Helium 70 psi. tested 5minutes at base leak rate 0.9 xE09 atm.cc/sec on HS line.  No leak.

Entry  Tuesday, November 15, 2022, 13:33, Frank Song, ITW, Standard Operation, TM2, UCx#40, Module Connection TM2_with_UCx#40_connection_in_ITW.png

 TM2 with UCx#40 is connected in ITW.

Entry  Friday, January 06, 2023, 10:38, David Wang, ITW, Standard Operation, TM2, , ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test.  ITW_vacuum_leak_check_2023.pdf

ITW and TM2 primary and secondary vacuum vessel leak check is done. Leak detector is connected to ITW TP1. Base leak rate on leak detector is 0.0 x E-9 atm.cc/sec.   See attachment for the result.  No big issue. Two old leaks we found last year at location D and E disappeared in this check. We did Vacseal resin spray on them last year.  It looks like the Vacseal spray works .  From the result , I can see the o-ring between exit 1 module and T - flange is closing to the end of the life.  There are two small leaks on this o-ring now at A and B location. We plan to change this o-ring next winter shut down. We do vacseal spray on them this year. The big O-ring between tank vessel and T -flange looks still ok. Two small leaks are found on location F and G on this O-ring. Not much we can do on them. The leak on location C and B were sprayed with resin yesterday after leak check. They are leak free after spray on check. I will double check them. Leak on location A will be resin sprayed after TM2 is removed and ITW is under vacuum.   All TM2 internal water-cooling lines are helium pressurized (70 psi) for 5 minutes each. HS shows 2.5 X E-9atm.cc/sec leak rate. The rest lines are 0.0 X E-9 atm.cc/sec.

Entry  Monday, January 09, 2023, 14:19, Frank Song, ITW, Standard Operation, TM2, UCx#40, TM2 with UCx40 disconnection in ITW TM2_with_UCx40_disconnection_in_ITW.png

 TM2 with target UCx40 was disconnected in ITW and moved to NHC.

Entry  Tuesday, January 10, 2023, 10:15, Frank Song, Safe Module Parking, Standard Operation, TM2, UCx40 removed, TM2 electrical check with no target attached on SW silo TM2_electrical_check_without_UCx40_on_SW_silo.png

 TM2 with no target on SW silo be electrical checked right after module moving.

Entry  Friday, May 19, 2023, 09:39, Frank Song, South Hot-Cell, Standard Operation, TM2, TiC#6, leak/electrical check TM2_with_TiC#6_leak_and_eletrical_check.png

 TM2 with TiC#6 was checked on SHC, see pic attached pls.

Entry  Wednesday, May 24, 2023, 08:34, David Wang, Conditioning Station, Standard Operation, TM2, TiC#6, TM2 HS line helium pressure check and gasline fittins leak check. 

TM2 HS line helium leak check is done. leak detector base LR 1.8xE-8atm.cc/sec.  helium pressure 70 psi. 5 minutes test. no change on LD leak rate.    I spray lots helium to gas line adaptor and fittings. No leak.has been found  at this base leak rate level.  Since the TCS MP1 has some  issue ,this time the base leak rate on LD only can get to 1.8Xe-8 atm.cc/sec at this moment instead of 0.0xE-9.  The low E-8  level is not perfect, but  i  have no concern on it.

Entry  Thursday, May 25, 2023, 13:10, David Wang, Conditioning Station, Maintenance, TM2, , TCS MP1 is replaced due to poor performace.  

TCS MP1 is replaced due to poor performance( system shows unstable and high reading on TCSCG1A and high TP1,TP2 current draw) . The pump is edward 15i scroll pump. Since vacuum group has no same spare pump, i have to use SMP roughing pump SMP:MP1 which is a  same pump to replace it.. After the replacement ,the TCS:CG1A and TP1, TP2 current draw are back to normal. The original TCSMP1 was surveyed. Swipes on intake and exhaust port are 300 counts and 1000counts. RAM contact field measurement are from 0.2 to 0.5 usv/hr. It is stored in TH. We will try to refurbish this pump first and use as for SMP:MP1. If we can not refurbish it, a new 15i pump will be purchased for SMP:MP1.

2023-05-31: Opened pump tip seal chamber and swiped chamber inside. The contamination level :1200 counts on 44-2.  The tip seal and tip seal chamber o ring need to be replaced . Checked gas ballast knob. The O-ring inside knob is in good condition. Checked exhaust port o-ring. it is in good condition. spare part PO will be issued soon.

2023-06-14:Tip seals and o-ring have been replaced on original TCS:MP1. After, it was tested at TCS for 48 hours. The pump is much quiet on operation, and the pump body temperature is mild. The final  inlet pressure this pump could get with TCS PV1 closed is about 23 mtorr.  The result is good. I installed it back to TCS vacuum station and reinstalled SMP:MP1 back to SMP vacuum station.  

 

Entry  Monday, May 29, 2023, 12:52, Frank Song, ITW, Standard Operation, TM2, TiC#6, Module Connection TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf

 TM2 with TiC#6 was connected in ITW (FEBIAD), turbo pumps were started successfully.

Entry  Tuesday, May 30, 2023, 12:30, Frank Song, ITW, Standard Operation, TM2, TiC#6, gas lines pump out in ITW Faraday Cage gas_lines_pumped_out_to_ITW.JPG

 Gas lines pumped down at electric room for TM2 at ITW is done, leak rate 0.0e -8 <1.0e -3 T P pressure

Entry  Tuesday, June 06, 2023, 17:36, Carla Babcock, ITW, Standard Operation, TM2, TiC#6, Module conditioning 

Conditioned TM2 up to 48kV in ITW. Some sparks and current is not very stable. Drawing about 178uA at 48kV.

Entry  Tuesday, August 08, 2023, 12:59, David Wang, ITW, Standard Operation, TM2, SiC #6, TM2 SiC#6 dhas been disconnected in ITW TiC#6_TM2_disconnection_checklist.pdf

TM2 SiC#6 has been disconnected in ITW. See check list

Entry  Tuesday, August 08, 2023, 13:01, David Wang, North Hot-Cell, Standard Operation, TM2, TiC#6, TM2 TiC#6 post run electrical check at NHC. TiC#6_post_run_electrical_check.pdf

TM2 TiC#6 post run electrical check has been done at TCS. See attachment

Entry  Wednesday, August 09, 2023, 09:41, David Wang, North Hot-Cell, Standard Operation, TM2, Nb#10, TM2 Nb# 10 electrical and leak check at NHC Nb_#10_electrical_and_leak_check_at_NHC.pdf

Nb#10 has been installed on TM2 . electrical and leak check on HS line are good. See attachment.