  1133   Wednesday, November 25, 2015, 11:52 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Module movedYesterday TM#4 with Ta#46 was moved from
the east station to the south hot cell.
  
  1132   Tuesday, November 24, 2015, 14:03 chad fisherSouth Hot-CellStandard OperationTM4 Ta#46Ta#46 has been removed from TM4.   
  1131   Tuesday, November 24, 2015, 14:02 chad fisherSouth Hot-CellRepair  Left Manip repairelectronics package on left manip died
completely yesterday (it has been going for
a while).
  
  1130   Tuesday, November 24, 2015, 14:00 chad fisherSouth Hot-CellRepair  Compressible waste sorting.Residual fields from the remaining compressible
waste were still too high (as far as I'm
concerned) so I have unpacked all compressible
 20151124_101547.jpg 
  1129   Tuesday, November 24, 2015, 13:54 chad fisherSouth Hot-CellRepair  Cell DeconDecon/removal of large solid waste was
performed on Wednesday November 18th."Hot"
activated items included containment box
  
  1128   Monday, November 16, 2015, 13:59 Travis CaveConditioning StationMaintenanceTM3no targetModule movedTM#3 has been moved back to the NW silo.   
  1127   Monday, November 16, 2015, 10:37 David WangConditioning StationRepairTM3 TM3 has been disconnected at TCS.I stopped the TM3 and TCS vacuum pumps
and water system. The TM3 is disconnected
and vented. It will be moved to silo this
  
  1126   Monday, November 16, 2015, 10:33 Anders MjosConditioning StationStandard Operation FEBIAD Test TargetHV conditioning by ISAC operatorsISAC operators attempted HV conditioning
over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry
  
  1125   Monday, November 16, 2015, 10:09 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check after HV conditioning Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details.
 2015-11-16_TM3_Electrical_Test.pdf 
  1124   Monday, November 16, 2015, 08:04 David WangConditioning StationStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015Update TH schedule according to changes.
See attachment 1,2 .
update TH schedule weekly. See attachments
 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1123   Thursday, November 12, 2015, 13:25 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check and leak checkTarget to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached.  
 TM3_iwth_FEBIAD_in_TCS_Electrical_Check.pdf 
  1122   Thursday, November 12, 2015, 10:18 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service cap

    

       
            
  
  1121   Tuesday, November 10, 2015, 16:53 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started
 2015-11-13_TCS_TM3_FEBIAD_Test_Target.docx 
  1120   Tuesday, November 10, 2015, 10:23 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service capConducted a more thorough leak check this
morning with Edi. He found a leak on the
base of the  blue F/T insulator for
 TM3_Service_Cap_Leak.pdf 
  1119   Monday, November 09, 2015, 16:47 Anders MjosConditioning StationMaintenanceTM3FEBIAD Test TargetLeak check of Service CapService cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.
Connected to the backing line with IG1 at
  
  1118   Friday, November 06, 2015, 14:44 Anders MjosConditioning StationRepairTM3 O-rings replaced on service capO-rings were replaced on the service cap
by Anders, Maico, Aurelia and Keith under
work permit  I2015-11-05-5
  
  1117   Friday, November 06, 2015, 14:36 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later
it was found that the manual valve for the
  
  1116   Thursday, November 05, 2015, 09:57 Travis CaveConditioning StationMaintenanceTM3no targetModule movedTM#3 has been moved from the north west
silo to the conditioning station.
  
  1115   Thursday, October 29, 2015, 13:59 Travis CaveSpent Target VaultStandard Operation  Filling F-308sFive F-308s have been filled with the spent
targets. The F-308s have been moved to the
hall way between the north and south hot
  
  1114   Friday, October 23, 2015, 11:40 Travis CaveSpent Target VaultStandard Operation ZrC #7Spent target movedThe spent ZrC#7 target has been moved from
the south hot cell to the spent target vault.
The target was placed in pail #129 and then
 Vault_Storage_October_23_2015.pdf 