  400   Tuesday, July 16, 2013, 13:09 David WangITEStandard OperationTM4 TM4 has been disconnected in ITE.TM4 has been disconnected in ITE. All water
lines on TM4 have been purged. ITE is venting
now.
  
  405   Tuesday, July 23, 2013, 10:55 Travis CaveITEStandard OperationTM4Ta#40module moveTM#4 with Ta#40 has been moved from the
east target station to the south hot cell
move went well.
  
  414   Tuesday, July 30, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#29module moveTM#4 with SiC #29 has been moved from the
conditioning station to the east target station,
move went well.
  
  415   Tuesday, July 30, 2013, 14:42 David WangITEStandard OperationTM4 TM4 has been connected in ITE.TM4 has been connected in ITE. All turbo
pumps have been started now. The pumping
down on TM4 and ITE is good so far. The water
  
  419   Thursday, August 15, 2013, 07:37 David WangITERepairTM4 I moved 5 shielding blocks from ITE to block storage area.I moved5shielding blocks from ITE to block
storage area, This is a job for preparing
ITE vacuum surge investigation and leak check.
  
  421   Thursday, August 15, 2013, 16:35 Anders MjosITERepairTM4SiC#29Leak found on Coil 1By
pressurizing the water lines with 70 psi
 ITE_Leak_Test_2013-08-14.pdf 
  422   Monday, August 19, 2013, 10:08 Anders MjosITERepairTM4SiC#29Leak CheckAll water circuits except Coil 1 were leak
checked by David and Anders. No obvious signals
were detected except some small possible
 ITE_Leak_Test_2013-08-19.pdf 
  496   Monday, October 07, 2013, 12:06 Travis CaveITEStandard OperationTM3NiO#2module moveTM#3 has been moved from the conditioning
station to the east target station, move
went well.
  
  502   Tuesday, October 15, 2013, 15:34 Bevan MossITEStandard OperationTM3 Blocks moved from ITW to ITE Blocks 1-4 have been moved from ITW
to ITE. Block 5 was moved to a storage area
as it will be in the way of the harp repair.
  
  505   Wednesday, October 16, 2013, 18:53 Grant MinorITERepair  ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replacedThe blocks above the pre-separator section
of the ISAC beam lines     were removed today
in the Target Hall by Bevan Moss and Chad
 11x 
  507   Thursday, October 17, 2013, 17:16 Grant MinorITERepair  Pre-Separator-area (ITE Harp 9) Blocks ReplacedThe pre-separator-area blocks were replaced
today by Bevan and Travis, with Grant present
for photos and observation.
 8x 
  517   Tuesday, October 22, 2013, 14:23 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementsas measured today in the electrical room
by David and Anders
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow.pdf 
  529   Friday, October 25, 2013, 13:39 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementswith TM4 in ITW as measured today in the
electrical room by David and Anders.
 
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_wITW-TM4.pdf 
  532   Thursday, October 31, 2013, 11:38 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementswith TM4 in ITW as measured today in the
electrical room by David and Anders.
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_EOB.pdf 
  537   Tuesday, November 12, 2013, 09:51 David WangITEStandard OperationTM3 TM3 disconnectionTM3 has been disconnected this morning
and  purged all HV water lines. I found
the power plug for all turbo pump fans wasnt
  
  549   Tuesday, November 19, 2013, 14:24 David WangITERepair  ITE TP3Hi
all, The old  ITE  TP3 pump is
moved out and the new pump is  in
  
  568   Wednesday, December 04, 2013, 11:15 David WangITERepairTM4 New bolts are installed on ITE TP3.I installed 8 new bolts(3/8-16 UNC x1.25 
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back
  
  571   Thursday, December 05, 2013, 12:04 Travis CaveITEStandard OperationTM4UC#8module moveTM#4 with UC#8 has been moved from the
south hot cell to the east target station.
  
  574   Thursday, December 05, 2013, 14:57 David WangITEStandard OperationTM4  Connected TM4 in ITWI connected TM4 in ITE. All turbo pumps
have been started and wok fine including
new TP3. Everything is good so far.
  
  577   Monday, December 09, 2013, 14:47 David WangITEStandard OperationTM4 I moved 5 shielding blocks from block storage area to ITE.I moved 5 shielding blocks to ITE. The
ITE is configured to take proton beam.
  