Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 577     Entry time: Monday, December 09, 2013, 14:47
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: I moved 5 shielding blocks from block storage area to ITE. 

I moved 5 shielding blocks to ITE. The ITE is configured to take proton beam.

ELOG V2.9.2-2455