Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 574     Entry time: Thursday, December 05, 2013, 14:57
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: Connected TM4 in ITW 

I connected TM4 in ITE. All turbo pumps have been started and wok fine including new TP3. Everything is good so far.

ELOG V2.9.2-2455