2397
|
Thursday, December 01, 2022, 13:45 |
Carla Babcock | North Hot-Cell | Standard Operation | TM4 | C#4 | Post irradiation inspection C#4 | Post irradiation inspection of C#4 which
was running in TM4/ITE was conducted at the
NHC on Nov. 22 2022. |
  |
1573
|
Thursday, June 29, 2017, 11:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | UC#20 | Post Irradiation Examination (PIE) | The target was inspected by Chad and Anders.
Photos are available on DocuShare.
It was noticed that the target tube heater |
|
1790
|
Monday, September 24, 2018, 10:21 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | UC#23 | Post Irradiation Examination (PIE) | UC#23 experienced short between target
and heat shield as it was heated during operation.
The inspection of the target after irradiation |
|
1326
|
Tuesday, August 23, 2016, 08:05 |
chad fisher | South Hot-Cell | Maintenance | | | Post Hot Cell Entry Clean-up | Plastic has been removed from the floor
and any known active items in the hot cell
moved to the south east corner in an attempt |
|
2308
|
Thursday, February 24, 2022, 13:23 |
David Wang | ITE/ITW | Maintenance | | | Polyurethane water cooling lines replacement in ITE and ITW. | Polyurethane water cooling lines
in ITE and ITW HV shroud are replaced.
Both stations Ta, Tu, MSP, HS, Coil , EE |
|
390
|
Thursday, June 27, 2013, 14:27 |
chad fisher | South Hot-Cell | Development | | | Polishing Cleaning tool - Water blocks | The polishing/cleaning tool prototype is
now finished and appers to work great.
Thanks to Dan and Maico for the great |
|
1887
|
Thursday, March 07, 2019, 13:59 |
chad fisher | South Hot-Cell | Repair | TM2 | | Polishing | Polishing of the water block sealing surfaces
has commenced. First attempt was on block
B with low nap brown polishing pad (the least |
|
2529
|
Wednesday, January 24, 2024, 08:34 |
chad fisher | South Hot-Cell | Repair | TM4 | UCx#43 | Plating and coating from UCx#43 failure | TM4 has seen significant coating of the
main standoff insulators and various other
components stemming from failure in UCx#43 |
    |
2200
|
Monday, March 15, 2021, 13:01 |
Isaac Earle | Crane | Development | | | Plate & pin lift assembly load testing (ITA6550) | In mid-2020 design analysis was completed
on the steel plate & pin assemblies (ITA6550)
used to connect the ISAC target hall crane |
11x |
132
|
Thursday, June 21, 2012, 14:33 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | Pictures TM3 June 21st | Here are the pictures from today...there
is video too but it is not uploaded yet. |
8x |
239
|
Friday, January 18, 2013, 17:01 |
Grant Minor | Conditioning Station | Development | TM4 | | Photos of the CS with TM4 (after the no-module HV test, only vacuum connected) | Attached are some photos of TM4 in the
Conditioning Station after the no-module
HV test completion. Only vacuum services |
   |
1060
|
Tuesday, September 01, 2015, 16:03 |
Grant Minor | ITW | Standard Operation | TM2 | ZrC #7 | Photos of TM2 Connection Procedure on Docushare 1Sept2015 | https://documents.triumf.ca/docushare/dsweb/View/Collection-15323 |
|
1688
|
Friday, February 16, 2018, 13:46 |
Anders Mjos | ITW | Maintenance | TM2 | | Parker coupling inspection | Findings and photos from the inspections
attached. The inspection was conducted by
Anders, David and Maico. |
|
2400
|
Friday, January 06, 2023, 09:41 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Pails moved to mini-storage vault | The following three pails were moved from
the main storage vault to the mini-storage
vault: |
|
2398
|
Friday, December 16, 2022, 16:35 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Pails measured, moved to mini-storage vault | The following five pails were moved to
the mini-storage vault today under work permit
I2022-12-16-1: |
|
1909
|
Monday, April 29, 2019, 07:56 |
chad fisher | South Hot-Cell | Development | | | Pail transfers | Two pail transfers took place April 25th.
Ta#47 transfered from pail 137 to
pail 201. existing plastic bag from 137 showed |
 |
1906
|
Friday, April 12, 2019, 11:44 |
chad fisher | South Hot-Cell | Standard Operation | | | Pail transfer | Pail transfer was undertaken in the south
hot cell. went very well except near the
end the master tong cable of the right hand |
|
2511
|
Friday, December 15, 2023, 11:31 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#58 | Pail repack, transfer to mini-storage vault | Pail 211 which contained Ta#58 spent target
was repackaged into Pail 286 in the South
Hot Cell. |
|
2737
|
Wednesday, December 18, 2024, 14:17 |
Adam Newsome | Pail Handling Tool | Maintenance | | | Pail Handling Tool - Inspection | An informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main |
|
2436
|
Wednesday, May 03, 2023, 11:04 |
Adam Newsome | Crane | Maintenance | | | Pail Handling Tool - Annual Inspection | The pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome, N. Jorgenson, |
  |