  154   Tuesday, July 31, 2012, 12:50 David WangSouth Hot-CellStandard OperationTM1UC xTM1 heat shield circuit leak check with UC x targetChad and i did a leak check on TM1heat
shield with UCx target on.The circuit are
pumped  down to the bottom leak rate
  
  155   Tuesday, July 31, 2012, 14:04 Travis CaveConditioning StationStandard OperationTM1UCx#4module moveTM#1 with UCx#4 has been moved from the
south  hot hell to the conditioning
station. No problems with the move.
  
  156   Wednesday, August 01, 2012, 09:14 Travis CaveConditioning StationStandard OperationTM1UCx#4Electrical checkTM#1 with UCx#4 electrical check done at
the conditioning station under vacuum, see
attached sheet for results.
 TM#1_UC#4_under_vac.PDF 
  157   Thursday, August 02, 2012, 07:48 David WangConditioning StationStandard OperationTM1UCxTM1 UCx target heat shield helium pressure check is done.Connected leak detector to TM1 and CS vacuum
system. The vacuum readings   on TM1 and
CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic
  
  158   Thursday, August 02, 2012, 11:48 Travis CaveSpent Target VaultStandard Operation Ta#38Spent target moveTa#38 was moved from the south Hot Cell
to the Spent Target Vault. Target is in pail
#97, and was placed into tray 6 slot B of
 Vault_Storage_August_2_2012.pdf 
  160   Tuesday, August 14, 2012, 11:16 Travis CaveITWStandard OperationTM1UCx#4module moveTM#1 with UCx#4 has been moved from the
conditioning station to the west target station
move went well.
  
  161   Tuesday, August 14, 2012, 11:16 Travis CaveITWStandard OperationTM1UCx#4module moveTM#1 with UCx#4 moved from the conditioning
to the west target station move went well.
  
  162   Tuesday, August 14, 2012, 14:27 David WangITWStandard OperationTM1UCxTM1connection in ITWConnected TM1 in ITW,started 6 turbo pumps,
and finished TM1 water interlock check .
Every thing is good so far.
  
  163   Monday, August 20, 2012, 12:28 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW,I moved 5 shielding blocks from ITE 
to ITW.ITW is configured to take proton beam
now.
  
  165   Thursday, August 30, 2012, 13:57 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.I disconnected TM 4 in ITE on AUG 29th
morning.The vacuum lines stay untouched and
they will be disconnected on SEP 04th.
  
  167   Tuesday, September 04, 2012, 11:11 Travis CaveSouth Hot-CellStandard OperationTM4UO#3module moveTM#4 with UO#3 has been moved from the
east target station to the south hot cell
for a target exchange. The move went well.
  
  168   Tuesday, September 04, 2012, 14:34 David WangSouth Hot-CellStandard OperationTM4NiO #1TM4 heat shield circuit leak check with NiO#1 targetChad and i did a leak check on TM4 heat
shield circuit with new NiO#1 target installed.
It took about 40 mins(much longer than usual)
  
  169   Wednesday, September 05, 2012, 11:55 Travis CaveConditioning StationStandard OperationTM4NiO#1module moveTM#4 with NiO#1 has been moved from the
south hot cell to the conditioning station.
Move went well.
  
  170   Wednesday, September 05, 2012, 14:36 chad fisherSouth Hot-CellStandard OperationTM4NiO #1UOx removal NiO installationUOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken.
  
  171   Wednesday, September 05, 2012, 14:40 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical checkSee attached PDF for details. 60kV Common
to the target is low at 343k but I've been
told will work. Test will be done again on
 TM#4_NiO#1.PDF 
  172   Friday, September 07, 2012, 08:54 David WangConditioning StationStandard OperationTM4NiO #1TM4 NiO #1 target heat shield helium pressure check is done.leak detector pumped down to 0.0xE-9 atm.cc/sec,
and 0.0xE-4 torr. All high vacuum gauge readings
at CS and TM4 are at low -6 range from 2.2xE-6torr
  
  173   Friday, September 07, 2012, 09:47 Travis CaveSpent Target VaultStandard Operation UO#3Spent target moveThe spent UO#3 was moved from the south
hot cell to the storage vault. It was in
pail 98 and placed in spot 1A of the vault,
 Vault_Storage_September_6_2012.pdf 
  174   Friday, September 07, 2012, 10:37 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical checkElectrical check of the TM#4 with NiO#1
was done again today. see attached file for
results.
 TM#4_NiO#1a.PDF 
  175   Wednesday, September 12, 2012, 07:00 David WangITEStandard OperationTM4NiO #1ITM4 in ITE connected and pumping downTM4 had been connected in ITE. Six turbo
pump had been started . thepumpming diwn
is very good so far. The water interlock
  
  176   Wednesday, September 12, 2012, 11:59 David WangITWStandard OperationTM1UCxTM1 disconnected in ITWI removed 5 shielding blocks from ITW to
block storage area, and disconnected TM1
in ITW. After UCx run,  the radioactive
  