124
|
Monday, June 11, 2012, 10:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#6 | Spent target move | The Nb#6 target has been moved from the
south hot cell into storage. It was place
in pail #95 and is in slot 5C of the vault. |
|
125
|
Monday, June 11, 2012, 14:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#38 | Electrical check | Electrical check of TM#1 with Ta#38 at
the conditioning station under vacuum. See
attached file for details. |
|
126
|
Monday, June 11, 2012, 14:41 |
David Wang | Conditioning Station | Standard Operation | TM1 | Ta38 | Heat shield helium pressure test | Connected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and CS:PNG1
1.3 xE-6 Torr, IG1 4.7xE-7torr, IG4(diagnostic |
|
127
|
Tuesday, June 19, 2012, 10:35 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#38 | module move | TM#1 with Ta#38 moved from the conditioning
station to the west target station. Move
went well. |
|
128
|
Tuesday, June 19, 2012, 16:18 |
David Wang | ITW | Standard Operation | TM1 | Ta38 | TM1connected in ITW |
Normal
0
|
|
134
|
Monday, June 25, 2012, 14:39 |
David Wang | ITW | Standard Operation | | | I moved 5 shielding blocks from ITE to ITW, | and set up ventilation for ITW. ITW is
ready for taking proton beam now. All water
interlock checks for ITW are done. The ITW |
|
136
|
Tuesday, July 03, 2012, 10:50 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM4 in ITE this morning.
The window circuit and heat shield circuit
had been purged. The general field inside |
|
137
|
Tuesday, July 03, 2012, 12:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#27 | module move | TM#4 with SiC#27 moved from the east station
to the south hot cell. Fields at East MAA
were 127mSv/hr and the fields at the south |
|
138
|
Wednesday, July 04, 2012, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | Electrical check | Electrical check of TM#4 with UO#3
attached at the south hot cell see attached
PDF for full results. It has been noted that |
|
139
|
Wednesday, July 04, 2012, 13:18 |
David Wang | Conditioning Station | Standard Operation | TM4 | uo#3 | leak check on heat shield circuit |
|
|
140
|
Wednesday, July 04, 2012, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 moved from the south hot
cell to the conditioning station. The fields
of the module at the hot cell was 74.4 mSv/hr. |
|
141
|
Friday, July 06, 2012, 09:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | Electrical check | Electrical check of the target was done
at the conditioning station under vacuum,
see attached file for details. |
|
142
|
Friday, July 06, 2012, 11:34 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#27 | Spent target move | SiC#27 has been moved from the south hot
cell to the spent target vault. Target was
placed in pail #96, placed in slot 3A, the |
|
143
|
Friday, July 06, 2012, 14:38 |
David Wang | Conditioning Station | Standard Operation | TM4 | UO#3 | TM4 UO#3 target heat shield helium pressure check is done. | Connected leak detector to TM4 and CS vacuum
system. The vacuum readings on TM4 and CS:PNG4
3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic |
|
144
|
Monday, July 09, 2012, 10:51 |
Travis Cave | ITE | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 from the conditioning station
to the east target station. Move went well. |
|
145
|
Monday, July 09, 2012, 16:08 |
David Wang | ITE | Standard Operation | TM4 | UO#3 | ITM4 in ITE connected and pumping down |
Normal
0
|
|
150
|
Thursday, July 26, 2012, 08:33 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks from ITW to ITE thisTuesday morning . | All water interlock checks for ITE
had been done. The ITE water signals strength
and frequency(Espcially on MSP circuit) had |
|
151
|
Tuesday, July 31, 2012, 09:52 |
David Wang | ITW | Standard Operation | TM1 | Ta38 | TM1 disconnected in ITW | I disconnected TM1 in ITW. Heat shield
line has been purged . |
|
152
|
Tuesday, July 31, 2012, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#38 | module move | TM#1 with Ta#38 has been moved from the
west target station to the south hot cell,
no problems with the move. |
|
153
|
Tuesday, July 31, 2012, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#4 | UCx#4 Installed | Starting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1. |
|