Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 171     Entry time: Wednesday, September 05, 2012, 14:40
Author: Travis Cave 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: NiO#1 
Subject: Electrical check 

See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat a few days under vacuum.

Attachment 1: TM#4_NiO#1.PDF  243 kB  | Show | Hide all
ELOG V2.9.2-2455