Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 175     Entry time: Wednesday, September 12, 2012, 07:00
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: NiO #1 
Subject: ITM4 in ITE connected and pumping down 

TM4 had been connected in ITE. Six turbo pump had been started . thepumpming diwn is very good so far. The water interlock check on ITE and TM4 had been finished and everything is good.All water signals are strong and constant by visually checking.

ELOG V2.9.2-2455