Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 162     Entry time: Tuesday, August 14, 2012, 14:27
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx 
Subject: TM1connection in ITW 

Connected TM1 in ITW,started 6 turbo pumps, and finished TM1 water interlock check . Every thing is good so far.

ELOG V2.9.2-2455