Entry  Tuesday, July 02, 2024, 11:38, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer 
 5 shielding blocks have been moved from ITW to ITE, MAA area has been secured.
Entry  Thursday, June 27, 2024, 09:49, David Wang, North Hot-Cell, Standard Operation, , Nb#10, Nb#10target has been remotely transferred from NHC to SHC.  
Nb#10target has been remotely  transferred from NHC to SHC.  
Entry  Wednesday, June 26, 2024, 13:49, David Wang, Conditioning Station, Standard Operation, TM2, , Tm2 has been moved from SW silo to TCS. 
Tm2 has been successfully moved from SW silo to TCS. 
Entry  Tuesday, June 25, 2024, 12:49, Frank Song, ITE, Standard Operation, TM3, SiC#46, Module Connection TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf
 TM3 with new target SiC#46 was connected in ITE.
Entry  Tuesday, June 25, 2024, 11:59, David Wang, ITE, Standard Operation, TM3, SiC #46, Tm3 has been moved from TCS to ITE. 
Tm3 has been moved from TCS to ITE. the move is smooth.
Entry  Tuesday, June 25, 2024, 11:59, David Wang, ITE, Standard Operation, TM3, SiC #46, Tm3 has been moved from TCS to ITE. 
Tm3 has been moved from TCS to ITE. the move is smooth. 
Entry  Monday, June 24, 2024, 14:37, Carla Babcock, South Hot-Cell, Development, TM3, UCx#44, Inspection of TM3 and UCx#44 after no-protons run MicrosoftTeams-image_(61).pngMicrosoftTeams-image_(62).pngMicrosoftTeams-image_(60).pngMicrosoftTeams-image_(63).png
TM3 and UCx#44 ran in ITE but issues with the cyclotron prevented proton beam delivery. Nonetheless, the target was heated and provided stable beam to
TITAN as well as for tuning and some tests.
Results of inspection of TM3 module after run:
Entry  Wednesday, June 19, 2024, 14:16, David Wang, South Hot-Cell, Standard Operation, TM3, SiC #46, Tm3 electrical check with SiC#46 target at SHC TM3_with_SiC_46#_target_electrical_check_at_SHC.pdf
Tm3 electrical check with SiC#46 target  and HS line helium spray check at SHC. were done. everything is good. see attachment.
Entry  Wednesday, June 19, 2024, 14:11, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 has been moved from SHC to TCS. 
TM3 has been moved  from SHC to TCS.The move is smooth. 
Entry  Wednesday, June 19, 2024, 08:10, David Wang, Waste Package/Ship, Development, , , 5 gallon spent target pail, spent target lifting long pole and hook assembly load test 
 5 gallon spent target pail, lifting long pole and hook assembly load test was done by Rupan, Keyur ,and David.  Load in pail 101 lbs, test
time 10 minutes. No deform on pail( pail OD 29.8mm is not changed before and after test.  The test passed. Also 50 lbs load test on empty tray transit
frame was done. The frame is good on test.  Rupan will have a test report on this job.
Entry  Tuesday, June 18, 2024, 15:16, Adam Newsome, Crane, Maintenance, , , Pail Handling Tool - Annual Inspection PXL_20240618_213742257.jpgPXL_20240618_213455575.jpgPXL_20240618_213626154.jpg
The pail handling tool which is used to move 5 gallon pails around  the target hall was inspected by A. Newsome.  The main tool was checked, but not
the spare as it is currently in a disassembled and unusable state. The tool appears to be in good, working condition. The following items were checked.

    Inspect structural integrity of long tube - check for bending, warpage, dents, cracks, rust/corrosion
    Inspect structural
Entry  Tuesday, June 18, 2024, 15:04, Adam Newsome, Spent Target Vault, Maintenance, , , Annual Inspection of Main and Mini Storage Vaults  PXL_20240618_213819000.jpgPXL_20240618_213905146.jpg
The annual inspection of the main storage vault will be skipped this year since extensive inspection and testing was performed during the re-alignment
job in May (see this e-log for details: e-log 2584). This included successful testing of the emergency
close mechanism.
Entry  Tuesday, June 18, 2024, 11:59, David Wang, South Hot-Cell, Standard Operation, TM3, , Tm3 electrical check without target. TM3_without_target_2024_june_18.pdf
Tm3 electrical check without target is done. Everything is good including 2 x 5 pin connectors( all OL at 250 V to 60 KV and each other)  see attachment.
Entry  Monday, June 17, 2024, 17:24, Carla Babcock, ITE, Development, TM3, UCx#44, Status of gas system prototype in ITE schematic_pumpinggaslines_detailed.png
A new gas system for FEBIAD operation was installed in ITE to enable us to use a calibrated leak which is attached to the target heat shield. This will
allow us to control the quantity and purity of the gas going into the system, and to switch quickly between gasese and pressures.
The schematic of the system is attached. The use of the ballast container is likely not needed - it was originally included in case we want to
Entry  Monday, June 17, 2024, 07:36, David Wang, ITE, Repair, , , IG1S elbow oring seal and a blabk off cap oring seal beside the elbow were replaced on ITE entrance module top.. 
IG1S elbow o ring seal and a blank off cap o-ring seal beside the elbow were replaced on ITE entrance module top last Friday. IG1s has a higher than
normal reading so i leak checked entrance module top last Thursday and found leaks to 5x E-8 atm.cc/sec leak on one of (or both of )these two o-rings seals.
they are too close to identify exactly on which one was leaking so both o rings were replaced.  other air to vacuum seal on entrance module are leak
Entry  Friday, June 14, 2024, 16:04, Carla Babcock, ITW, Repair, TM4, UC#45, Replaced and reinstalled electronics in ITW cage 
ITW has been behaving badly at higher voltages recently, even without protons on. I conditioned it up to 50kV with heaters off in the TCS and it was
fine. But when I tried to do the same with heaters on in the station, it was quite sparky and it kept tripping the TGHT/TBHT. I went to 49kV where it was
unstable, then lowered to 48kV where it looked fine for 30mins. But even operating at 40kV, it tripped the heaters several times. The TBHT voltage came
Entry  Friday, June 14, 2024, 11:56, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form ITE to SHC. 
Tm3 has been moved form ITE to SHC. the move is smooth. 
Entry  Friday, June 14, 2024, 11:55, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#44, TM3 UCx#44 after operation electrical check at SHC  TM3_UCX#44_after_operation_electrical_check.pdf
TM3 UCx#44 after operation electrical check at SHC . see attachment.
Carla: Looks like the short on the cathode observed while trying to operate the FEBIAD in cathode-bias mode is still there. Will do investigations
in the hot cell during disassembly.
Entry  Friday, June 14, 2024, 11:18, Frank Song, ITE, Standard Operation, TM3, UCx#44, module disconnection TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf
 TM3 with target UCx#44 was disconnected in ITE. 
Entry  Thursday, June 13, 2024, 11:44, David Wang, Conditioning Station, Repair, TM2, , Replaced several o ring seals on TM2 service cap. 
  couple of E-8 to low E-7 atm.cc/sec leak were found on TM2 service cap top air to vacuum  o rings.  Replaced these leak o ring seals
including o ring on IG1 and steerer service panel,o rings on MSP, EE, D blue nylon and copper feed through, and o ring on a round blank off beside MSP
terminal on second row. 