Thursday, August 27, 2020, 09:42, Anders Mjos, Conditioning Station, Maintenance, TM2, Ta#60, Refilled TK2
Thursday, April 24, 2025, 13:42, David Wang, Conditioning Station, Standard Operation, , , Refilled TCS:TK2 from 11" to 28.8 "
Monday, April 14, 2014, 13:58, David Wang, ITE, Repair, , , Reconnected ITE entrance module
Tuesday, August 05, 2014, 11:53, David Wang, ITE, Repair, , , Reconnected ITE entrance module
Wednesday, September 24, 2014, 15:16, David Wang, ITE, Standard Operation, TM4, Ta#44, Reconnected TM4 in ITE.
Wednesday, July 02, 2014, 14:29, David Wang, ITE, Standard Operation, , , Reconnected TM3 in ITE.
Thursday, February 20, 2014, 11:04, chad fisher, South Hot-Cell, Repair, TM2, , Readying TM2 for C-Seal Leak Check
Tuesday, October 10, 2017, 10:45, David Wang, Conditioning Station, Repair, , , Re-route TCS water lines.
8x
Wednesday, March 17, 2021, 11:43, Frank Song, ITE, Repair, , , Re-connect Entrance Module in ITE
Tuesday, October 27, 2020, 11:46, Matthew Gareau, North Hot-Cell, Repair, , , Ratcheting repair issues with both left and right master
Monday, June 10, 2019, 08:26, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, Ramping voltage on TM4 w/o source tray
Monday, June 10, 2019, 16:22, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, Ramping V on TM4, no HV cover in TH
Monday, January 05, 2015, 15:01, Anders Mjos, Conditioning Station, Development, TM2, , RGA switched on
Friday, December 05, 2014, 15:41, Anders Mjos, Conditioning Station, Development, TM2, , RGA results
Thursday, September 26, 2013, 15:00, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, RGA not connecting
Monday, May 11, 2015, 10:45, Anders Mjos, Conditioning Station, Maintenance, , , RGA electronics box installed
Tuesday, August 09, 2016, 11:36, Anders Mjos, Conditioning Station, Maintenance, , , RGA and CG1S moved
Wednesday, May 29, 2013, 12:07, chad fisher, South Hot-Cell, Development, , SiC#28 RFQ, RFQ Autopsy
Tuesday, July 07, 2020, 17:43, Carla Babcock, ITE, Development, TM4, , RF tests on new IG-LIS wiring
Wednesday, July 08, 2015, 12:18, chad fisher, South Hot-Cell, Repair, TM2, , R U Coil line Removal