Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 722     Entry time: Tuesday, August 05, 2014, 11:53
Author: David Wang 
Category: ITE 
Type: Repair 
Module:  
Target/Number:  
Subject: Reconnected ITE entrance module 

ITE entrance module is reconnected in ITE.

ELOG V2.9.2-2455