Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2202     Entry time: Wednesday, March 17, 2021, 11:43
Author: Frank Song 
Category: ITE 
Type: Repair 
Module:  
Target/Number:  
Subject: Re-connect Entrance Module in ITE  

 David and I re-connect Entrance module at ITE after the monitor been replaced at SHC. 

Attachment 1: job_done_by_following_#190510.pdf  1.186 MB  | Show | Hide all
ELOG V2.9.2-2455