Entry  Wednesday, September 20, 2017, 13:38, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Insulator replacement 20170920_132813.jpg20170920_132820.jpg20170920_133244.jpg

Broken insulators ITD0053 and ITD0054 have been uninstalled from TM2.

Entry  Thursday, September 21, 2017, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#53, Electrical Check TM2_Ta53_elec_chk_shc.PDFTM2_Ta53_elec_chk_post_beam_shc.PDFTM2_notgt_elec_chk_shc_09202017.PDF

Electrical checks of TM#2 with Ta#53 and also with out a target.

Entry  Thursday, September 21, 2017, 12:07, chad fisher, South Hot-Cell, Repair, TM2, , Insulator Replacement 

Insulators ITD0053 and 54 have been replaced. All fasteners torqued to 56 in lbs.

 

Entry  Thursday, September 21, 2017, 16:26, Anders Mjos, South Hot-Cell, Standard Operation, TM2, , Inspection of Source Tray TM2_Source_Tray_EE_Insulator.pdf

Chad and Anders inspected the Source Tray today using the camera in the hot cell. A dark spot was observed on one of the four insulators separating the Extraction Electrode from the Ground Electrode. This could potentially influence the high leakage current. Some discolored areas were also observed in the Service Tray, but these was present when the module was built. See attachment for details.

Entry  Friday, September 22, 2017, 11:00, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check TM2_notgt_elec_chk_shc_09212017.PDF

Electrical check of TM#2 after the insulator change on thursday september 21.

Entry  Friday, September 22, 2017, 12:13, David Wang, South Hot-Cell, Maintenance, TM2, , TM2 service cap inside inspection. TM2_serica_cap_inspection_002.JPGTM2_serica_cap_inspection_003.JPGTM2_serica_cap_inspection_004.JPGTM2_serica_cap_inspection_005.JPGTM2_serica_cap_inspection_008.JPG

Two side panels on TM2 service cap were removed for TM2 service cap inside inspection. A piece of cable tie was found inside cap closing to service tray entrance area. All blue nylon insulators are inspected. They look good. The broken cable tie is moved out of service cap.

 Panels are installed back after the inspection.

See attachments

Entry  Friday, September 22, 2017, 14:15, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box off 20170922_140546.jpg20170922_140927.jpg

TM2 containment box has been removed. Found a piece of capton tape or tubing under table (see picture).

Entry  Tuesday, September 26, 2017, 14:27, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#54, Electrical Check TM2_Ta54_elec_chk_SHC.PDF

Electrical check of TM#2 with Ta#54 at the south hot cell. See attached PDF for details.

Entry  Wednesday, September 27, 2017, 08:00, chad fisher, South Hot-Cell, Standard Operation, TM2, Ta#54, Ta#54 installed 

Containment box has been replaced onto TM2, interior of containment box vacuumed, and Ta#54 installed with new fasteners (high current torqued to 130 in lbs).

Entry  Wednesday, September 27, 2017, 09:02, Travis Cave, Conditioning Station, Standard Operation, TM2, Ta#54, Module move 

 TM#2 with Ta#54 has been moved from the south hot cell to the conditioning station.

Entry  Thursday, September 28, 2017, 10:50, David Wang, Conditioning Station, Standard Operation, TM2, , Helium pressure test on TM2 window and HS water lines at TCS. 

  I did helium pressure test on TM2 containment box window and HS line at TCS. @ 70psi helium  for 3 minutes, HS:2.2XE-7 atm.cc/sec., Window:1.2XE-7 atm.cc/sec. There is no change on HS. But LR on window is bigger than before that was in E -9atm.cc/sec range.  

Entry  Thursday, September 28, 2017, 15:34, Anders Mjos, Conditioning Station, Development, TM2, , Changes to MP3 startup 

 Due to problems with the regulating valve WPV1, the VFD (Variable Frequency Drive) for the pump has been programmed to do a slow (2 min) ramp up. WPV1 has been bypassed and left fully opened. Work was done by Dave Morris

Entry  Thursday, September 28, 2017, 17:44, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#54, Conditioning Ta#54 Ta#54.docxTa#54_BIAS_current_vs_voltage.xlsx

Thursday, September 28, 2017

Cooling water not yet connected to TM.

High leakage current still observed. 200 uA at 22 kV. Did not go past 25 kV. 


Friday, September 29, 2017, 14:05: Started heater ramping to 580 / 200 A at 1 A/min

Friday, September 29, 2017, 14:09: BIAS / EZL / EE at 20 / 10 / 1.5 kV. BIAS current at 90 uA


Monday, October 02, 2017, 10:29: Accidentally set BIAS current limit to 0 A (step size too large) at 28 kV. This also caused the TGHT to got to 0 A. Recovered to 580 A in 10 - 15 s.

Monday, October 02, 2017, 12:07: Ramping down heaters at 2 A / min

Entry  Tuesday, October 03, 2017, 09:29, Travis Cave, ITW, Standard Operation, TM2, Ta#54, Module move 

 TM#2 with Ta#54 has been moved from the conditioning station to the west target station.

Entry  Tuesday, November 07, 2017, 10:11, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#54, Module move 

 TM#2 with Ta#54 has been moved from the west target station to the south hot cell.

Entry  Thursday, November 09, 2017, 09:34, David Wang, Conditioning Station, Standard Operation, TM2, Ta#55, Leak check on TM2 HS line at SHC and TCS. 

The TM2 HS line was leak checked at SHC yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed by Chad, NO leak.  It was helium pressurized at TCS this morning. Leak rat:2.5 XE-7 atm.c/sec. The result  is same as last time check. No concern.

Entry  Thursday, November 09, 2017, 09:35, David Wang, Conditioning Station, Standard Operation, TM2, Ta#55, TM2 has been connected at TCS 

TCS vacuum system and water system have been started as well. Everything looks fine.

Entry  Thursday, November 09, 2017, 10:39, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#55, Conditioning Ta#55 

Thursday, November 09, 2017, 10:40: BIAS / EL to 30 / 15 kV. 400 uA on BIAS

Bias was stable for 1 hour. Handed over to RIB ops for heater conditioning.

Entry  Monday, November 13, 2017, 13:39, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#54 and #55, Electrical Check TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdfTM2-no_target-_Electrical_Check_SHC_Nov_2017.pdfTM2-Ta55_Electrical_Check_SHC.pdf

 The results of the various electrical check done on the target module on November 7th and 8th of 2017. Checks were done with the old Ta#54 target without a target and finally with the new Ta#55 target. See the attached PDF for results.

Entry  Tuesday, November 14, 2017, 10:01, Travis Cave, ITW, Standard Operation, TM2, Ta#55, Module move 

 TM#2 with Ta#55 has been moved from the conditioning station to the west target station. The field was measured on the access panel to the service chase and the field was found to be 430uSv/hr at one meter from the module.