Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1625     Entry time: Friday, September 22, 2017, 14:15
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: TM2 containment box off 

TM2 containment box has been removed. Found a piece of capton tape or tubing under table (see picture).

Attachment 1: 20170922_140546.jpg  1.648 MB  | Show | Hide all
Attachment 2: 20170922_140927.jpg  906 kB  | Show | Hide all
ELOG V2.9.2-2455