Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1657
Entry time:
Thursday, November 09, 2017, 09:35
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM2
Target/Number:
Ta#55
Subject:
TM2 has been connected at TCS
TCS vacuum system and water system have been started as well. Everything looks fine.
ELOG V2.9.2-2455