Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1659     Entry time: Monday, November 13, 2017, 13:39
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#54 and #55 
Subject: Electrical Check 

 The results of the various electrical check done on the target module on November 7th and 8th of 2017. Checks were done with the old Ta#54 target without a target and finally with the new Ta#55 target. See the attached PDF for results.

Attachment 1: TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdf  131 kB  | Show | Hide all
Attachment 2: TM2-no_target-_Electrical_Check_SHC_Nov_2017.pdf  130 kB  | Show | Hide all
Attachment 3: TM2-Ta55_Electrical_Check_SHC.pdf  166 kB  | Show | Hide all
ELOG V2.9.2-2455