Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1620     Entry time: Thursday, September 21, 2017, 10:48
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#53 
Subject: Electrical Check 

Electrical checks of TM#2 with Ta#53 and also with out a target.

Attachment 1: TM2_Ta53_elec_chk_shc.PDF  137 kB  | Show | Hide all
Attachment 2: TM2_Ta53_elec_chk_post_beam_shc.PDF  140 kB  | Show | Hide all
Attachment 3: TM2_notgt_elec_chk_shc_09202017.PDF  160 kB  | Show | Hide all
ELOG V2.9.2-2455